| 1 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. |
| 4 | Brick work with common burnt clay bricks of class designation 7.5 in foundation and plinth including curing in Cement Mortar1:6 |
| 5 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6fine sand ) |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | P/Laying in position specified grade of reinforcement Cement concrete including curing but excluding cost of centering shuttering and reinforcement all work upto plinth level |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 9 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 10 | Centring and shuttering including strutting, propping etc and removal of the formwork Foundation, Footing, Base of Columns etc.. |
| 11 | Centring and shuttering including strutting, propping etc and removal of the formwork plinth beam |
| 12 | Carriage of construction material Sand 3km |
| 13 | Carriage of construction material Aggregate 3km |
| 14 | Carriage of construction material Bricks from 5 km |
| 15 | Providing and fixing of Marble sign board with complete job Please Enable Macros to View BoQ information |