| 1 | The work of safe carriage of the following material from store center Nawada to work site under the jurisdiction of EDD-Budaun, Bilsi and Bisauli Approx. distance upto 0-60 Km. Including safe loading and unloading. |
| 2 | 100 KVA T/F |
| 3 | 250 KVA T/F |
| 4 | PCC Pole Support 8.5 Mtr. Long |
| 5 | 11 KV MS T-Off Channel (125X65X1300) |
| 6 | Top Channel (125x65x2240 mm) |
| 7 | S/S Base Angle (75x75x6x2028mm) bolt & Nut |
| 8 | 11 KV Disc Insulator Composite 45 KN (T&C Type) |
| 9 | 11 KV Pin Insulator polymeric |
| 10 | 11 KV FUSE SET |
| 11 | LT XLPE CABLE AL (3.5X400 SQMM) |
| 12 | CABLE LT ABC (3X95+1X70+1X16 SQMM) |
| 13 | ACSR Weasel Conductor |
| 14 | Stay Complete (16X1800) |
| 15 | The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom). |
| 16 | Holding Clamps for S/s with Bolt & Nuts |
| 17 | Droper Channel |
| 18 | Holding Clamps for Top Channel TPMO & fuse set etc. with bolts & nuts |
| 19 | Copper L piece 50x225x10mm (LS) |
| 20 | Copper L piece 62x225x12mm (LS) |
| 21 | Eye Hook |
| 22 | Stone Pad (300x300x75) |
| 23 | Clamp for LT T-Off with Nut & Bolts |
| 24 | Danger Board with clamp, nut & bolt |
| 25 | Number Plate with clamp, nut & bolt |
| 26 | Deadend |
| 27 | Suspension Clamp |
| 28 | LT PVC CABLE 3.5X150 SQMM |
| 29 | Tailless Unit with Structure Made of MS Channel (100x50x6) with required fuse & lugs |
| 30 | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 31 | Construction of 250 KVA T/F plinth 1.5x1.5x2 Mtr. for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per RESSPO Norms. |
| 32 | Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation. |
| 33 | Pipe Earthing (Netural & Body) of Transformer (By boring of 4 inch diameter upto water lavel, 40 mm diameter A Class GI pipe is inserted to a depth of upto water lavel and a holed pipe of 1.5m length is inserted at the bottom, Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work contractor will provide all material, manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE) |
| 34 | Construction/Erection of Double Pole (except pole) Suitable for 100/250 KVA T/F including fitting of all accessories with stone pad etc. (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms). |
| 35 | Dismentaling of 100 KVA Transformer as per norms complete in all respect |
| 36 | Mounting of following T/F,s as per norms complete in all respect - |
| 37 | 100 KVA T/F |
| 38 | 250 KVA T/F |
| 39 | Erection of Single PCC Pole 8.5 Mtr in H.T/L.T lines including fitting of all accessories with stone pad etc. as per RESSPO Norms (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms). |
| 40 | Grouting of PCC 8.5 Mtr. Long with 1:4:8 mixture in size (450x450x1500mm.) including cost of cement/CC & sand Required as per RESSPO Norms. (All Grouting material shall be provided by the contractor). |
| 41 | Earthing of Pole by MS Earthing Rod (20X2500) and making connections with GI wire (All the material shall be provided by the contractor including earth rod) |
| 42 | Erection/Fixing of stay set with stay wire and clamp as per RESSPO norms including binding. climbing, clamping, tightening and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, sand and C.C. and sand etc. as per RESSPO norms. All the grouting material shall be provided by the contractor |
| 43 | Laying, Stringing, Sagging & Jumpring of Following Conductor complete in all respect with all required accessories as per RESSPO Norms. |
| 44 | LT XLPE CABLE AL (3.5X400 SQMM) |
| 45 | CABLE LT ABC (3X95+1X70+1X16 SQMM) |
| 46 | ACSR Weasel Conductor |
| 47 | Fixing of danger board on each location and G.I. barbed wire including proper clamping as per RESSPO Norms. (Danger Board shall be provided by the contractor as per details given in S.No. 2.09 as per RESSPO Norms). |
| 48 | Fixing of Number Plate on each location including proper clamping as per RESSPO Norms. (Number Plate shall be provided by the contractor as per details given in S.No. 2.10 as per RESSPO Norms). |
| 49 | Erraction/Fixing of Tailless Unit (400 A) with Structure Made of MS Channel (100x50x6) (All the material shall be provided by the contractor including Lug & fuse wire) complete in all respect as per as per RESSPO Norms) |
| 50 | Erection/Fixing of 11 KV Fuse Set with Structure and fixing of all accessories & connections. complete in all respect as per RESSPO Norms. |
| 51 | Erection/Fixing of Copper L piece 50x225x10mm (All the material shall be provided by the contractor) complete in all respect as per as per RESSPO Norms) |
| 52 | Erection/Fixing of Copper L piece 62x225x12mm (All the material shall be provided by the contractor) complete in all respect as per as per RESSPO Norms) |
| 53 | Safe back carriage of Following item (if any) from work site to Store Center, Nawada, Budaun approx distance upto 0-60 Km including loading & unloading. |
| 54 | 100 KVA T/F |
| 55 | Note:-All Item Rate filling with GST by the firm Please Enable Macros to View BoQ information |