| 1 | Dismentaling of B.O.E. soling/interlocking tiles including stacking of sevicable material and disposal of unsevicable material within a lead of 50m as per deirection of EI/C (Labour only) |
| 2 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. |
| 3 | 12mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) |
| 4 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4:8 (1 cement: 4 coarse sand (zone-iii): 8 graded stone aggregate 40 mm nominal size |
| 5 | Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement: 4 coarse sand) |
| 6 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement |
| 7 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. |
| 8 | laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, cuvature, colour and pattern over and including 50 mm thick |
| 9 | Providing and laying of factory made 80mm thick interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/laying of |
| 10 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement: 1.5 coarse sand (zone-iii): 3 graded stone aggregate 200 mm nominal size |
| 11 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. |
| 12 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 13 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. |
| 14 | Disposal of surplus earth/malwa upto 3.00km distance including loading/unloading of material with all charge complete. |
| 15 | Add 18 % G.S.T. Please Enable Macros to View BoQ information |