| 1 | The work of safe carriage of the following material from store center Nawada to work site under the jurisdiction of EDC, Budaun Approx. distance upto 0-60 Km. Including safe loading and unloading. |
| 2 | 33KV VCB O/D 800AMP 750MVA |
| 3 | 33 KV CONTROL PANEL FOR DOUBLE TRANSFORMER |
| 4 | 33 KV C.T, 400/200/1-1-1Amp. |
| 5 | The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom). |
| 6 | CONTROAL CABLE FROM 33 KV PENAL TO VCB 2X2.5 SQMM ARAMOURD CABLE |
| 7 | 11 PT FOR S/S METERING |
| 8 | CONTROAL CABLE FROM 33 KV PENAL TO VCB 4X2.5 SQMM ARAMOURD CABLE |
| 9 | Tripping Coil 24 Volt |
| 10 | WTI / OTI SET |
| 11 | IDMT O/C E/F Relay ASHIDA Make |
| 12 | Dismentaling of following old & damaged equipment’s as per norms complete in all respect |
| 13 | 33KV VCB O/D 800AMP 750MVA |
| 14 | 33 KV CONTROL PANEL FOR DOUBLE TRANSFORMER |
| 15 | 33 KV C.T, 400/200/1-1-1Amp. |
| 16 | Mounting and installation including mechanical/electrical fixing and adjusting of the following equipment on their respective structures including proper adjustment as per RESSPO Norms. |
| 17 | 33 KV VCB O/D 800AMP 750MVA |
| 18 | 33 KV CONTROL PANEL FOR DOUBLE TRANSFORMER |
| 19 | 33 KV C.T, 400/200/1-1-1Amp. |
| 20 | Dismantling of old/damaged PT from 11 KV Panel, testing, erection and fixing of new PT on panel, proper alignment, earthing connections, and primary/secondary wire termination ready for charging. |
| 21 | Dismantling old faulty gauges, physical fitting, calibration, and fixing of new contractor-supplied WTI/OTI sensors inside transformer thermometer pockets, oil topping, calibration, and routing/connecting trip/alarm contacts to the main control panel room. (To be Supply & Provided by Contractor) |
| 22 | Laying of control cable from 33 KV Panel to VCB 2x2.5 Sqmm Aramourd cable under ground in trench making proper complete in all respect as per RESSPO Norms. |
| 23 | Laying of control cable from 33 KV Panel to VCB 4x2.5 Sqmm Aramourd cable under ground in trench making proper complete in all respect as per RESSPO Norms. |
| 24 | Replacement of faulty IDMT O/C E/F Relay ASHIDA Make including all required connection complete in all respect as per RESSPO Norms. |
| 25 | Replacement of faulty Tripping Coil 24 Volt including all required connection complete in all respect as per RESSPO Norms. |
| 26 | Safe back carriage of Following item (if any) from work site to Store Center, Nawada, Budaun approx distance upto 0-60 Km including loading & unloading. |
| 27 | Damaged 33 KV VCB O/D 800AMP 750MVA |
| 28 | Damaged 33 KV CONTROL PANEL FOR DOUBLE TRANSFORMER |
| 29 | Damaged 33 KV C.T, 400/200/1-1-1Amp. |
| 30 | Note:-All Item Rate filling with GST by the firm Please Enable Macros to View BoQ information |