| 1 | Material-Lines&Cable Decentralised |
| 2 | F- BRACKET(Ex GST) |
| 3 | GAURDING CLAMP (Ex GST) |
| 4 | LT CLAMP(Ex GST) |
| 5 | CLAMP FOR CHANNEL |
| 6 | 11 KV CROSS ARM HOLDING CLAMP |
| 7 | SUSPENSION CLAMP WITH EYE HOOK(Ex GST) |
| 8 | MS HOLDING CLAMP FOR XLPE |
| 9 | TOP CHANNEL |
| 10 | DROPPER CHANNEL 100*50*1028MM |
| 11 | S/S BASE ANGLE 75*75*6*2028MM WITH CLAMP NUT BOLT |
| 12 | 140MM STABLIZED HDPE PIPE |
| 13 | JOINTING KIT OUTDOORTYPE(3*120SQMM) 11 KV |
| 14 | WORK DETAILS AND RATES(EXCLUDING GST)(उक्त कार्य के निष्पादन मे प्राक्कलन एवं इस सूची मे दर्ज सामग्री के अतिरिक्त यदि कोई अन्य टी एंड पी आइटम/ विकेंद्रीयकृत सामग्री की आवश्यकता पड़ती है तो कार्यदायी संस्था द्वारा उपलब्ध कराते हुये कार्य को ससमय पूर्ण करा लिया जायेगा एवं कोई अतिरिक्त धनराशि देय नहीं होगी ) |
| 15 | Carriage of Conductor/Material From Store To Site |
| 16 | Carriage of PCC Pole 35 |
| 17 | Overhead 11 KV XLPE cable laying |
| 18 | UG Cable Laying through HDPE Pipe |
| 19 | FIXING AND MAKING OF Jointing Kit |
| 20 | Delta Earthing work with all Material |
| 21 | Installtion of VCB for New feeder |
| 22 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 23 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 24 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering |
| 25 | Erection of Sectional Double Pole Structure of PCC pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works. |
| 26 | Erection of Single including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works. |
| 27 | Earthing of Poles/DT |
| 28 | Gauding With GI Wire as Per Reuired Place |
| 29 | Under Ground Railway Crossing Works ( Double CKT) Please Enable Macros to View BoQ information |