| 1 | The work of safe carriage of the following material from store center Nawada/Workshop to work site under the jurisdiction of EDD-Budaun & Ujhani Approx. distance upto 0-70 Km. Including safe loading and unloading. |
| 2 | 33 KV XLPE CABLE (3X300 SQMM) |
| 3 | 33 KV XLPE CABLE (3X300 SQMM) C/J KIT |
| 4 | 33 KV XLPE CABLE (3X300 SQMM) STH KIT |
| 5 | ST Pole Support 11 Mtr. Long |
| 6 | The following Decentralized material shall be provided by the contractor for execution of work as per RESSPO Norms (the material shall be purchased from approved vendor of Discom). |
| 7 | HDPE PIPE 140 MM |
| 8 | G.I. PIPE FOR HOSTING |
| 9 | NUT BOLT AND WASHER |
| 10 | CLAMP FOR FIXING OF G.I. PIPE AT DP |
| 11 | Danger Board with clamp, nut & bolt |
| 12 | GI Barbed Wire |
| 13 | Fabrication, erection of 33 KV double pole structure for end terminations on 11 M long ST Pole with fixing of necessary clamps & other accessories as per RESSPO Norms. |
| 14 | Grouting of ST Pole 11 Mtr. Long with 1:4:8 mixture in size (450x450x1500mm.) including cost of cement/C.C. & sand Required as per RESSPO Norms. (All Grouting material shall be provided by the contractor). |
| 15 | Earthing of Pole by MS Earthing Rod (20X2500) and making connections with GI wire (All the material shall be provided by the contractor including earth rod) |
| 16 | Fixing of danger board on each location and G.I. barbed wire including proper clamping as per RESSPO Norms. (Danger Board shall be provided by the contractor as per details given in S.No. 2.05 as per RESSPO Norms). |
| 17 | Under ground laying of 33 KV XLPE CABLE (3X300 SQMM) cable in Single circuit Laying of HDPE Pipe 160mm dia (trenchless) drill method including cable laying (including cost of digging, sand along with road restoration) complete in all respect as per RESSPO Norms.) |
| 18 | Under ground laying of 33 KV XLPE CABLE (3X300 SQMM) cable in Single circuit Laying of HDPE Pipe 160mm dia (Open trench) method including cable laying (including cost of digging, bricks, sand along with road restoration) complete in all respect as per RESSPO Norms). |
| 19 | Under ground laying of 33 KV XLPE CABLE (3X300 SQMM) cable in double circuit Laying of HDPE Pipe 160mm dia (Open trench) method including cable laying (including cost of digging, bricks, sand along with road restoration) complete in all respect as per RESSPO Norms). . |
| 20 | Under ground laying of 33 KV XLPE CABLE (3X300 SQMM) cable in double circuit Laying of HDPE Pipe 160mm dia (trenchless) drill method including cable laying (including cost of digging, sand along with road restoration) complete in all respect as per RESSPO Norms). |
| 21 | Fixing of 33 KV 3x300 Sq.mm XLPE Cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 22 | Fixing of 33 KV 3x300 Sq.mm XLPE Cable STH jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 23 | Hoisting of 3x300 mm2 33 KV XLPE cable on double pole with GI pipe of size 6” dia including its jumpering complete with Clamps nut and bolts (Clamp, Nut & Bolts shall be provided by the contractor, Approx. 6 Mtr. Per Hosting). |
| 24 | Note:-All Item Rate filling with GST by the firm Please Enable Macros to View BoQ information |