| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC POLE 8.5 MTR.LONG |
| 3 | STP POLE 11MTR |
| 4 | 11KV DISC INSULATOR (T&C) 45KN |
| 5 | 11 KV PIN NUT WITH |
| 6 | 11 KV DISC INSULATOR 45 KN (T&C) |
| 7 | EARTHING COMPLETE |
| 8 | STAY COMPLETE |
| 9 | M.S. T-off Channel I00x50x5x 1300 mm |
| 10 | T-OFF CAMP FOR 8.5 M PCC POLE |
| 11 | M.S. Top Channel 125x65x5x3200 mm |
| 12 | A.C.S.R. WEASEL CONDUCTOR |
| 13 | CROSS ARMS V-TYPE 11 KV |
| 14 | M.S CHANNEL FOR CABLE SUPPORT |
| 15 | GARDING ANGLE |
| 16 | BARBED WIRE |
| 17 | G I WIRE |
| 18 | MS ANGLE IRON 65x65x6 MM BRACING WITH 4 CLAMP |
| 19 | 3X185 SQMM XLPE CABLE 11 KV |
| 20 | CABLE JOINTING KIT FOR 3X185 SQMM CABLE |
| 21 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 22 | STONE PAD |
| 23 | PIN INSULATOR 11 KV |
| 24 | 11KV F-CLAMP FOR PCC POLE |
| 25 | 11 KV CROSS Arm Clamp for STP 11 MTR LONG |
| 26 | F-CLAMP FOR STP WITH N&B |
| 27 | CROSS ARM HOLDING CLAMP PCC POLE 8.5M |
| 28 | D.P. CLAMP FOR PCC 8.5 M POLE |
| 29 | D.P. CLAMP FOR STP 11 MTR |
| 30 | E- BRACKET |
| 31 | GARDING ANGLE CLAMP |
| 32 | NUT , BOLT & WASHER |
| 33 | HDPE PIPE,140 MM OD |
| 34 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 35 | Erection of PCC Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 36 | Grouting of PCC Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 37 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 38 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 39 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 40 | Grouting of stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 41 | Laying, Sagging, Stringing, Binding and Jumpering etc. of A.C.S.R. Rabbit Cunductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 42 | 11KV DISC INSULATOR (T&C) 45KN |
| 43 | 11 KV PIN NUT WITH |
| 44 | 11 KV DISC INSULATOR 45 KN (T&C) |
| 45 | EARTHING COMPLETE |
| 46 | M.S. T-off Channel I00x50x5x 1300 mm |
| 47 | T-OFF CAMP FOR 8.5 M PCC POLE |
| 48 | M.S. Top Channel 125x65x5x3200 mm |
| 49 | CROSS ARMS V-TYPE 11 KV |
| 50 | M.S CHANNEL FOR CABLE SUPPORT |
| 51 | GARDING ANGLE |
| 52 | BARBED WIRE |
| 53 | G I WIRE |
| 54 | MS ANGLE IRON 65x65x6 MM BRACING WITH 4 CLAMP |
| 55 | 3X185 SQMM XLPE CABLE 11 KV |
| 56 | CABLE JOINTING KIT FOR 3X185 SQMM CABLE Please Enable Macros to View BoQ information |