| 1 | Supply and errection of follwing Decentralize material |
| 2 | 11 KV fuse set |
| 3 | Danger Board with clamp |
| 4 | PG clamp |
| 5 | Barbet Wire |
| 6 | Bolt & nut for shackel |
| 7 | MS Guarding angle |
| 8 | G. I. wire 6 /8/10 Swg |
| 9 | Cross Bracing |
| 10 | Clamp with nut bolt |
| 11 | DB box three phase with clamp |
| 12 | Earth wire clamp with nut bolt |
| 13 | LT clamp with nut and bolt |
| 14 | Piercing Connector |
| 15 | Dead End Clamp |
| 16 | LT Fuse Set (upto 100KVA) |
| 17 | LT shackel insulator |
| 18 | Safe loading Carriage & unloading of following material from store centre to pit site/JE dump store. |
| 19 | ST Pole 11 Mtr Long |
| 20 | PCC Pole 8.5 Mtr Long |
| 21 | 11 kv metering cubical unit |
| 22 | CT/PT pole unit |
| 23 | 11 KV F bracket |
| 24 | 11 KV polymeric 'Disc fitting |
| 25 | 11 KV polymeric 'Disc Insulator |
| 26 | 11 KV Polymeric pin Insulator with nut |
| 27 | 11 KV V type X-arm MS Angle 65x65x6 mm with Clamp |
| 28 | 11kv Dropper Channel |
| 29 | 11kv T-off Channel |
| 30 | 11kv Top Channel |
| 31 | MS Earthing Complete 20mm |
| 32 | ACSR Waeasel |
| 33 | Stay Set Complete |
| 34 | Transformer 250 KVA |
| 35 | Transformer 100 KVA |
| 36 | Transformer 25 KVA |
| 37 | Transformer 63 KVA |
| 38 | 11 KV XLPE cable 3x185/3x120 sqmm |
| 39 | 11 KV XLPE cable 3x70 sqmm |
| 40 | ABC cable 3x120 sq mm |
| 41 | ABC Cable 3x95 sq mm |
| 42 | ABC Cable 3x50 sq mm |
| 43 | ABC cable 1x16 sq mm |
| 44 | Erection & Stringing and Sagging of 11 KV & LT line |
| 45 | Erection of PCC 8.5 mtr long Single pole with all accessories(All neccessary item like clamp, Nut bolt, Top channel, Dropper channel, Base angle, etc. will be provided by the contractor at his own cost) |
| 46 | Erection of PCC 8.5 mtr long Double Pole with all accessories(All neccessary item like clamp, Nut bolt, Top channel, Dropper channel, Base angle, etc. will be provided by the contractor at his own cost) |
| 47 | Erection of ST single pole 11 mtr. Long all necessary accessories ( All neccesary item like clamp, Nut bolt etc. will be provided by the contractor at his own cost). |
| 48 | Grouting of Pole in deep 1/6 the length of Pole in ratio 1:4:6 in cement sand & bla ST |
| 49 | Erection & ST Double pole 11 mtr. Long all necessary accessories ( All neccesary item like clamp, Nut bolt etc. will be provided by the contractor at his own cost). |
| 50 | Grouting and Nozzling of 11 KV / 33 kv stayset complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 51 | Erection of all accessories of pole (All neccessary item like pin insulator, disc insulator, fitting,cross arm, clamp, Nut bolt, Top channel, Dropper channel, Base angle, etc. ) |
| 52 | Errection of 11 kv metering cubical unit |
| 53 | Errection of 'CT/PT pole unit |
| 54 | Mounting of 250 KV T/F form dump place to newly constructed Double pole/Plinth & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 55 | Mounting of 100 KV T/F form dump place to newly constructed Double pole/Plinth & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 56 | Mounting of 25 KV T/F form dump place to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 57 | Mounting of 63 KV T/F form dump place to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 58 | ACSR Waeasel stringing sagging binding and jumpering of ABC with all accessories |
| 59 | Supply and erection of Tailless Unit with all Accessories |
| 60 | Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor. |
| 61 | Earthling by way of Boring and lowering the \\"B\\" class GI pipe (Gindal ) of 50mm dia from ground upto water level not less than 20mtr as per standard practice |
| 62 | Laying of 11KV XLPE single cable 3x185/3x120 sq mm in HDPE pipe by drill method. (All material including HDPE pipe 150 mm dia shall be provided by the contractor. Only cable will be provided by the department.) |
| 63 | Laying of 11 KV (3x120, 3x185, 3x300 sqmm) single XLPE Cable by digging of trech size 500 mm vide 900 mm after laying of brick, sand and stone slab. |
| 64 | Laying of 11 KV 3x70 sqmm single XLPE Cable by digging of trech size 500 mm vide 900 mm after laying of brick, sand and stone slab. |
| 65 | Stringing & Sagging ABC (3X95+1X35+1X16)Sqmm |
| 66 | Stringing & Sagging ABC (3X50+1X35+1X16)Sqmm |
| 67 | Stringing & Sagging ABC (1x25+1X16)Sqmm |
| 68 | Stringing & Sagging ABC (3X120+1X95+1X16 Sqmm) |
| 69 | Cutting of tree branches |
| 70 | Construction of T/F plinth of size 1.5x1.5x1.5 Cu. mtr on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor). |
| 71 | Construction of T/F fencing of size 2.5x2.5x2 Cu. Mtr. Please Enable Macros to View BoQ information |