|
| 1 | (A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work. |
| 2 | 11 KV COMP. POLY. DISC INSULATOR 45KN T&C |
| 3 | 11 KV COMPOSITE POLYMER PIN INSULATOR |
| 4 | 11 KV DISC FITTING (B&S) 70KN |
| 5 | 11 KV Disc Insulator T&C type 4500 kg. |
| 6 | 11 KV Disc fitting |
| 7 | 11 KV Pin insulator (Polymeric) |
| 8 | 11/0.4 KV T/F 100 KVA |
| 9 | 250 KVA 11/0.4 KV TRANSFORMER NEW |
| 10 | 3×70 mm2 XLPE |
| 11 | A.B. CAB. L.T. (3X95)+(1X70)+(1X16) SQ.MM. |
| 12 | A.C.S.R. WEASEL CONDUCTOR |
| 13 | LT ABC (3x95+1x70+1x16) Sq. mm |
| 14 | LT AL. XLPE CABLE (UNARMOURED) 1X400 SQMM |
| 15 | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 16 | MS Channel 125x65x1300mm (T-off) |
| 17 | MS Top channel (125x65x2240mm) |
| 18 | PCC POLE 8.5 MTR. LONG |
| 19 | PCC Pole 11 mtr Long |
| 20 | Phase wire ACSR Weasel |
| 21 | Stay set Complete 16x1800 |
| 22 | TEE-OFF CHANNEL |
| 23 | TOP CHANNEL |
| 24 | 11 KV TPMO |
| 25 | 11 KV fuse Set |
| 26 | EARTH ROD 2540X20 MM |
| 27 | Earthing of pole by MS earthing rod of 20X2500mm |
| 28 | LT Distribution box |
| 29 | LT PVC Cable 3.5X150/70 sq mm |
| 30 | ERRECTION |
| 31 | Errection of 8.5 Mtr long PCC Pole On D/P including digging of Pits & fitting of accessories. |
| 32 | Errection of 8.5 Mtr long PCC Pole including digging of Pits & fitting of accessories. |
| 33 | Errection of 11 Mtr long PCC Pole On D/P including digging of Pits & fitting of accessories. |
| 34 | Errection of 11 Mtr long PCC Pole including digging of Pits & fitting of accessories. |
| 35 | Grouting of Poles as per RESSPO norms with grouting materials as per RESSPO Norms. (0.268 Cu.m.each) |
| 36 | Laying of LT PVC cable of size 3.5X150/70 Sq.mm. complete in all respect as per RESSPO norms |
| 37 | Earthing of Pole by MS Earthing Rod 20X2500 mm |
| 38 | Mounting Of New 100 KVA T/F on DP as per RESSPO Norms. |
| 39 | Mounting Of New 250 KVA T/F on DP as per RESSPO Norms. |
| 40 | Labour charges for digging of 60 feet deep well type earthing for neutral of Distribution transformer at two different places and welding of G.I. strip including the cost of M.S. pipe 1.5 inch dia 40 feet long and G.I. strip 50X6 mm of suitable length for connecting M.S.pipe to neutral through proper welding or bolt and nut. (NEUTRAL & BODY) (2X93) All material will be provided by contractor including labour charges and consumables. (All Material Provided by the contractor) |
| 41 | Providing and erecting MS/GI fencing around 250 KVA Distribution Transformer plinth complete with angle iron posts, horizontal members, barbed wire/chain link mesh, locking arrangement, welding, painting, and all accessories as per UPPCL specifications and direction of Executive Engineer In-charge. |
| 42 | Providing and constructing RCC plinth of size approximately 2m × 2m × 1.5m for installation of 250 KVA Distribution Transformer complete with excavation, PCC, RCC work, reinforcement, brick masonry, plastering, cable opening, grouting and finishing as per /UPPCL specifications and direction of concerned Executive Engineer In-charge. |
| 43 | Instalation of Stay Set Complete 16X1800 |
| 44 | Streinging of LT ABC (3x95+1x70+1x16) Sq mm Cable as per RESSPO Norms |
| 45 | Streinging of A.B. CAB. L.T. (3X95)+(1X70)+(1X16) Sq mm Cable as per RESSPO Norms |
| 46 | Stringing & sagging of 3ϕ3wire 11 KV LT line by ACSR weasel conductor including all associated works & making clearence of road with joints/jumpers & binding on insulators as required. |
| 47 | Stringing & sagging of 3ϕ3wire 11 KV LT line by ACSR weasel conductor including all associated works & making clearence of road with joints/jumpers & binding on insulators as required. |
| 48 | Instalation LT Distribution Box |
| 49 | Instalation of decentalized material as per Respo/uppcl norms |
| 50 | Installation of 11 KV TPMO |
| 51 | Installation of 11 KV Fuse set |
| 52 | TAIL LESS UNIT WITH ALL ACCESSORIES 500A FOR 250 KVA T/F (ALL THE ACCESSORIES AND NECESSARY ARRANGEMENT SHALL BE MADE BY CONTRACTOR) |
| 53 | Under graound cable laying charges with HDPE pipe. complete in all respect as per RESSPO norms required material will be provided by the contractor. |
| 54 | Laying of LT AL. XLPE cable of Size 1X400 mm2 (UNARMOURED) . complete in all respect as per RESSPO norms |
| 55 | EARTH ROD 2540X20 MM |
| 56 | Filling of cable box O/D11 KV (3X185) sq mm. Complete in all respect. |
| 57 | PROVIDED BY CONTRACTOR |
| 58 | 3×185 mm2 outdoor Epoxy Type |
| 59 | ALUMINUM LUG OFF SIZE |
| 60 | Clamps for LT T-off with bolts & Nuts |
| 61 | Connecting lead 1x16 Sq mm |
| 62 | Copper L Piece |
| 63 | DANGER BOARD BARBED WIRE WITH JUMPER |
| 64 | Dead end clamp with I hook |
| 65 | Earth wire clamps for PCC pole |
| 66 | G.I. Pipe 6 inch dia |
| 67 | HDPE Pipe 120mm |
| 68 | Holding Clamp various type |
| 69 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 70 | LT Fuse Set Protection unit for 100 kva DT with SMC Box |
| 71 | LT Piercing connector 95 Sq.mm |
| 72 | LT incoming panel with metering equipment, Fuse & |
| 73 | LT incoming panel with metering equipment, Fuse & fixing arrangement (LS) |
| 74 | LT pole Clamp with nuts & bolts for PCC pole. |
| 75 | Laying of 11 KV Cable by digging/drilling(L.S.) |
| 76 | MS angle 75x75x6x2028mm with clamp & bolt and nut |
| 77 | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) |
| 78 | Making of 11 KV Cable Box |
| 79 | Stone pad 300x300x75mm |
| 80 | Suspension clamp with I hook Please Enable Macros to View BoQ information |