| 1 | DECENTRALISED ITEM NAME(EXCLUDING GST) |
| 2 | Dead End with Eye Hook |
| 3 | Suspension Clamp with Eye Hook |
| 4 | Piericing Connector Size 16/50/95/120 sqmm ABC |
| 5 | 1x16 SQ mm LT XLPE Cable |
| 6 | Stay Clamp |
| 7 | Stay Insulator |
| 8 | Cross arm Holding Clamp |
| 9 | F-bracket |
| 10 | Clamp for Chanell |
| 11 | Lt fuse set with box |
| 12 | nut and bolt |
| 13 | Aluminum Lug size 240 SQ mm |
| 14 | Top Channel |
| 15 | Dropper Channel |
| 16 | S/S Base angle |
| 17 | WORK DETAILS AND RATES(EXCLUDING GST)(उक्त कार्य के निष्पादन मे प्राक्कलन एवं इस सूची मे दर्ज सामग्री के अतिरिक्त यदि कोई अन्य टी एंड पी आइटम/ विकेंद्रीयकृत सामग्री की आवश्यकता पड़ती है तो कार्यदायी संस्था द्वारा उपलब्ध कराते हुये कार्य को ससमय पूर्ण करा लिया जायेगा एवं कोई अतिरिक्त धनराशि देय नहीं होगी |
| 18 | Carriage of Conductor/Material From Store To Site |
| 19 | Carriage of PCC/STP Pole From Store To Site |
| 20 | Carriage of 25 KVA Distrubution Transformer From Store To Site |
| 21 | Carriage of 63 KVA Distrubution Transformer From Store To Site |
| 22 | Carriage of 100 KVA Distrubution Transformer From Store To Site |
| 23 | Carriage of 10 KVA Distrubution Transformer From Store To Site |
| 24 | Mounting of 25 KVA Distribution Transformer at DP/ with Channel and Clamp |
| 25 | Mounting of 63 KVA Distribution Transformer at DP/ with Channel and Clamp |
| 26 | Mounting of 100 KVA Distribution Transformer at DP/ with Channel and Clamp |
| 27 | Mounting of 10 KVA Distribution Transformer |
| 28 | Laying of New ABC With all Accessories (Including Distribution Box with Connecting Cable) |
| 29 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 30 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 31 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering |
| 32 | Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works. |
| 33 | Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 34 | Earthing of Poles Please Enable Macros to View BoQ information |