| 1 | (A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work. |
| 2 | PCC Pole 11 Mtr Long |
| 3 | PCC Pole 8.5 Mtr Long |
| 4 | MS Channel (Dropper) 100x50x2028 mm |
| 5 | MS Top Channel (125x65x2240 mm) |
| 6 | 11 KV Disc Insulator T&C Type 4500 Kg |
| 7 | 11 KV Disc Fitting |
| 8 | MS Channel 125x65x1300 mm (T-off) |
| 9 | 11 KV Pin Insulator (Polymeric) |
| 10 | 11/0.4 KV T/F 100 KVA |
| 11 | LT ABC (3x95+1x70+1x16) Sq.mm |
| 12 | Stay Set Complete 16x1800 |
| 13 | Phase Wire ACSR Weasel |
| 14 | LT Distribution Box |
| 15 | Three Phase Distribution Box |
| 16 | LT PVC Cable 3.5x150/70 Sq.mm |
| 17 | Earthing of Pole by MS Earthing Rod 20x2500 mm |
| 18 | 11 KV TPMO |
| 19 | 11 KV Fuse Set |
| 20 | ERRECTION |
| 21 | Errection of 8.5 Mtr long PCC Pole On D/P including digging of Pits & fitting of accessories. |
| 22 | Errection of 11 Mtr long PCC Pole On D/P including digging of Pits & fitting of accessories. |
| 23 | Errection of 8.5 Mtr long PCC Pole including digging of Pits & fitting of accessories. |
| 24 | Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials. |
| 25 | Grouting of Poles as per RESSPO norms with grouting materials as per RESSPO Norms. (0.268 Cu.m.each) |
| 26 | Laying of LT PVC cable of size 3.5x150/70 Sq.mm. complete in all respect as per RESSPO norms |
| 27 | Earthing of Pole by MS Earthing Rod 20x2500 mm |
| 28 | Mounting Of New 100 KVA T/F on DP as per RESSPO Norms. |
| 29 | Labour charges for digging of 60 feet deep well type earthing for neutral of Distribution transformer at two different places and welding of G.I. strip including the cost of M.S. pipe 1.5 inch dia 40 feet long and G.I. strip 50X6 mm of suitable length for connecting M.S.pipe to neutral through proper welding or bolt and nut. (NEUTRAL & BODY) (2X93) All material will be provided by contractor including labour charges and consumables. (All Material Provided by the contractor) |
| 30 | Instalation of Stay Set Complete 16x1800 |
| 31 | Streinging of LT ABC (3x95+1x70+1x16) SQMM Cable as per RESSPO Norms |
| 32 | Stringing & sagging of 3ϕ3wire 11 KV LT line by ACSR weasel conductor including all associated works & making clearence of road with joints/jumpers & binding on insulators as required. |
| 33 | Instalation LT Distribution Box/Three Phase Distribution Box |
| 34 | Instalation of decentalized material as per Respo/uppcl norms |
| 35 | Installation of 11 KV TPMO |
| 36 | Installation of 11 KV Fuse set |
| 37 | PROVIDED BY CONTRACTOR |
| 38 | Clamps for LT T-off with Bolts & Nuts |
| 39 | Connecting Lead 1x16 Sq.mm |
| 40 | LT Piercing Connector 95 Sq.mm |
| 41 | Stone Pad 300x300x75 mm |
| 42 | LT Fuse Set Protection Unit for 100 KVA DT with SMC Box |
| 43 | Holding Clamps for Top Channel TPMO & Fuse Set etc. |
| 44 | MS Angle 75x75x6x2028 mm with Clamp, Bolt & Nut |
| 45 | LT Incoming Panel with Metering Equipment and arrangement |
| 46 | LT Pole Clamp with Nuts & Bolts for PCC Pole |
| 47 | Earth Wire Clamp for PCC Pole |
| 48 | Suspension Clamp with I Hook |
| 49 | Dead End Clamp with I Hook |
| 50 | F-Clamps for PCC Pole |
| 51 | Danger Board & Clamps with Nut & Bolt |
| 52 | PG Clamps |
| 53 | Nut & Bolt Please Enable Macros to View BoQ information |