|
| 1 | Operation and Maintenance (Based on Jodhpur Region II District Sirohi BSR 2020) (exclusive of GST) |
| 2 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 3 | In all type Soil AC/PVC/HDPE pipe |
| 4 | 50/63/75mm |
| 5 | 80/90mm |
| 6 | 100/110mm |
| 7 | 125/140mm |
| 8 | 150/160/180mm |
| 9 | Add on above item for B.T. Road |
| 10 | 50/63/75mm |
| 11 | 80/90mm |
| 12 | 100/110mm |
| 13 | 125/140mm |
| 14 | 150/160/180mm |
| 15 | Add on above item for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 16 | 50/63/75mm |
| 17 | 80/90mm |
| 18 | 100/110mm |
| 19 | 125/140mm |
| 20 | 150/160/180mm |
| 21 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 22 | In all type Soil |
| 23 | 50/63/75mm |
| 24 | 80/90mm |
| 25 | 100/110mm |
| 26 | 125/140mm |
| 27 | 150/160/180mm |
| 28 | Add on above item for B.T. Road |
| 29 | 50/63/75mm |
| 30 | 80/90mm |
| 31 | 100/110mm |
| 32 | 125/140mm |
| 33 | 150/160/180mm |
| 34 | Add on above item for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 35 | 50/63/75mm |
| 36 | 80/90mm |
| 37 | 100/110mm |
| 38 | 125/140mm |
| 39 | 150/160/180mm |
| 40 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 41 | In all type Soil |
| 42 | 80 mm |
| 43 | 100 mm |
| 44 | 125 mm |
| 45 | 150 mm |
| 46 | Add on above item for B.T. Road |
| 47 | 80 mm |
| 48 | 100 mm |
| 49 | 125 mm |
| 50 | 150 mm |
| 51 | Add on above item for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 52 | 80 mm |
| 53 | 100 mm |
| 54 | 125 mm |
| 55 | 150 mm |
| 56 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 57 | In all type Soil |
| 58 | 75 mm |
| 59 | 90/80 mm |
| 60 | 110/100 mm |
| 61 | 140/125 mm |
| 62 | 180/160/150 mm |
| 63 | Add on above item for B.T. Road |
| 64 | 75 mm |
| 65 | 90/80 mm |
| 66 | 110/100 mm |
| 67 | 140/125 mm |
| 68 | 180/160/150 mm |
| 69 | Add on above item for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 70 | 75 mm |
| 71 | 90/80 mm |
| 72 | 110/100 mm |
| 73 | 140/125 mm |
| 74 | 180/160/150 mm |
| 75 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 76 | In all type Soil |
| 77 | 80 mm to 110 mm |
| 78 | 125 mm to 165 mm |
| 79 | Add on above item for B.T. Road |
| 80 | 80 mm to 110 mm |
| 81 | 125 mm to 165 mm |
| 82 | Add on above item for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 83 | 80 mm to 110 mm |
| 84 | 125 mm to 165 mm |
| 85 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size |
| 86 | In all type Soil |
| 87 | 50 to 75 mm |
| 88 | 80-110 mm |
| 89 | 125 to 165 mm |
| 90 | Add on above item for B.T. Road |
| 91 | 50 to 75 mm |
| 92 | 80-110 mm |
| 93 | 125 to 165 mm |
| 94 | Add on above item for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. |
| 95 | 50 to 75 mm |
| 96 | 80-110 mm |
| 97 | 125 to 165 mm |
| 98 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 99 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. Please Enable Macros to View BoQ information |