| 1 | Steel work in built up tubular trusses including cutting, hoisting ( height upto 10 m)fixing in position and applying apriming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. Electric resistance or induction butt welded tubes. |
| 2 | Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade : Two or more coats on new work |
| 3 | Providing & laying 1500 Microns thick 6 m wide HDPE Geo membrane, over the synthetic clay liner having Thickness 1.5mm, Density .94g/cm³, Tensile Strength at yield 23 Nmm/ width and at break 42 Nmm/ width, Elongation at Yield 13%, Elongation at Break 700%, Tear Resistance 175 N, Puncture Resistance 490 N, Carbon Black Content 2.5 and Carbon Black dispersion at Satisfactory leve |
| 4 | Providing & Fixing Barbed wire line over all work as per eic |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading III Material |
| 6 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earth |
| 7 | Spreading of manure , good earth in required thickness (cost of manure and good earth to beseparately ) |
| 8 | Supply of different varieties of bougainvillea in ply bags/earthen pot according to height growth and age of plant at site including loading unloading and transportation etc. complete Different varieties of bougainvillea 900mm |
| 9 | Supply of different varities of tree/shrubs/climbers according to height and age of the plant at side including loading/unloading & transportation etc.complete Different varieties of shrubs 900 mm |
| 10 | Digging pits in ordinary soil and refilling the same with the excavated earth mixed with manure in the ratio of 2:1 by volume ( 2parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) floodingwit |
| 11 | Planting of trees /shrubs/ hedge and climbers plants at desired distance in row and watering |
| 12 | Maintenace of Plants by the contractor including of pits/bidswatering ,preparation of Thavala,Hoeing, weeding etc. &application of insecticides etc. & security if the plant dieduring maintenance contractor has to replace same heightplant at his own cost. |
| 13 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix |
| 14 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4graded stone aggregate) finished with a floating coat of neatcement including cement slurry, making of lines or groove etccomplete but excluding the cost of nosing of steps etc. complete.40mm thick with 20mm thick nominal size aggregate. Please Enable Macros to View BoQ information |