| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 20 Km.) |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | PCC Pole 11 Mtr Long |
| 4 | Top Channel MS 125x65x2240 mm Long |
| 5 | ACSR Weasel conductor |
| 6 | 11 K.V. Disc Insulator T&C Type 4500Kg. With Fitting |
| 7 | LT XLPE Cable 1x240 sq mm |
| 8 | 11 K.V. Pin Insulator (Plymeric) |
| 9 | 11 Kv V-Type X-Arm |
| 10 | Al Cable 3.5x70 Sq MM PVC |
| 11 | Al Cable 1x120 Sq MM PVC |
| 12 | Al Cable 1x400 Sq MM PVC |
| 13 | MS Dropper Angle |
| 14 | MS Angle Base 75x75x2028 mm with clamp |
| 15 | MS Channel T-off |
| 16 | LT AB Cable (3x95+1x70+1x16) SQ MM |
| 17 | LT AB Cable (3x50+1x35+1x16) SQ MM |
| 18 | LT AB Cable (3x120+1x95+1x16) SQ MM |
| 19 | Distribution Box |
| 20 | Stay Complete |
| 21 | Earthing Complete |
| 22 | 11 KV Fuse Set |
| 23 | GI Wire 6Swg |
| 24 | Guarding Angle |
| 25 | 25 KVA Three Phase T/F, 11/0.4 KV |
| 26 | 100 KVA T/F |
| 27 | 250 KVA T/F |
| 28 | DE-CENTRALIZED MATERIALS, Provided Contractor |
| 29 | Nut & Bolt Washear |
| 30 | 1x35 mm2 Allu Cable For Distribution Box |
| 31 | Top, T-off Cross Brasing Angle Clamp |
| 32 | F-Bracket |
| 33 | Chemical Earthing with Strip |
| 34 | Cu 'Z' Clamp |
| 35 | Alu. Lug 400/240 Sq.mm |
| 36 | Alu. Lug 120 Sq.mm |
| 37 | Alu. Lug 95 Sq.mm |
| 38 | L.T. Connector Type 'A' (Line to Line) |
| 39 | L.T. Connector Type 'B' (Line to DB) |
| 40 | Connector Wire 1x16 Sq.mm |
| 41 | L.T. Bare Neutral Connector (PG Clamp) |
| 42 | MS Clamp for Distribution Box |
| 43 | I Hook |
| 44 | J Hook |
| 45 | Dead End Clamp With Eye Hook |
| 46 | Suspension Clamp with Eye Hook |
| 47 | LT Piearcing Connector 95 SQ MM |
| 48 | LT Piearcing Connector 120 SQ MM |
| 49 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 50 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 51 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 52 | Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 53 | Earthing Complete |
| 54 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL Conductor, binding with insulators & jumpering. |
| 55 | LT XLPE Cable 1x240 sq mm |
| 56 | Al Cable 3.5x70 Sq MM PVC |
| 57 | Al Cable 1x120 Sq MM PVC |
| 58 | Al Cable 1x400 Sq MM PVC |
| 59 | LT AB Cable (3x95+1x70+1x16) SQ MM |
| 60 | LT AB Cable (3x50+1x35+1x16) SQ MM |
| 61 | LT AB Cable (3x120+1x95+1x16) SQ MM |
| 62 | Distribution Box |
| 63 | 11 KV Fuse Set |
| 64 | GI Wire 6Swg |
| 65 | 25 KVA Three Phase T/F, 11/0.4 KV |
| 66 | 100 KVA T/F |
| 67 | 250 KVA T/F |
| 68 | Construction of Plinth and wire mesh Fencing |
| 69 | Fencing (6 feet height including civil & Instalment |
| 70 | Nutral Earthing and Body work with GI Earthing |
| 71 | Chemical Earth Elect. 3 M Long 80 MM dia |
| 72 | Tailless Unit 500 amp Henlay type with installtion & Supply |
| 73 | Plinth for T/F Please Enable Macros to View BoQ information |