Tender For Tihar Malik: Dnit For Laying The Balance Distribution Pipeline, Construction Of Sluice Valve Hodies,Providing Functional Household Tap Connection, Construction Of 2 Nos. Boosting Stations I.E.Const. Of Ugcwt, Pc, Bw,Pm,Cc Path And Rising M, Tihar-Haryana
TDR : 55733401
Tender Notice
BOQ
9 Days Left
Tihar
Haryana
Tender For Tihar Malik: Dnit For Laying The Balance Distribution Pipeline, Construction Of Sluice Valve Hodies,Providing Functional Household Tap Connection, Construction Of 2 Nos. Boosting Stations I.E.Const. Of Ugcwt, Pc, Bw,Pm,Cc Path And Rising M
Name of Work:- Tihar Malik: DNIT for laying the balance distribution pipeline, Const. of sluice valve hodies,Providing Functional Household tap Connection, Const. of 2 Nos. Boosting Stations i.e.Const. of UGCWT, PC, BW,PM,CC path and rising main and Pumping Machinery with light system , Const. of road and path , painting at whole water works structures, Const. of 1 No. Water Treatment Plant at water works and OandM for 12 months during defect liability period after trial run of 3 month and 5 year thereafter in Village Tihar Malik Tehsil Gohana Distt. Sonipat and all other works contingent thereto Rs. 135.97 Lacs
Sl. No.
Item Description
1
Supply and fixing LED Light 60 Watt complete in all respect
2
WTP: Design and construction of 0.50 MLD capacity water treatment plant PLC control including providing and laying the DI / CI pipes, specials, sluice valves from inlet chamber of WTP to inter connecting piping network in WTP (The cost of these DI / CI pipes, valves and specials shall also be included in the rates quoted by the contractor) along with inlet chamber, Alum dozing, Flash mixing, Clariflocculator, filter box, over head Reservoir for back wash and waste water tank with suitable size pumping sets and panel boards, air scour equipment, chemical house with chlorination equipments, all other civil, mechanical, electric installations complete in all respects as per specifications (make of Sluice valves / NRV: IVC / VAG / Kirlosker) 0.50 MLD Capacity
3
Operation and maintenance of the 1 No. WTP for 3 months successful trail run period, 6 year defect liability cum Operation and Maintenance period thereafter on the commissioning of scheme and plant (cost of the O and M will be kept minimum 20% of estimated cost of work).
4
HSR Itmes Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.