| 1 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 2 | Fitting one set AB switch and giving connection |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 4 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 5 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 6 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 7 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 8 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 9 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 11 | Fitting one additional HT pin with insulator |
| 12 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 13 | Laying 3 x 300 sq mm XLPE cables in trench including drawing through pipes wherever necessary. |
| 14 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 15 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm by HDD method including cost of 110 mm HDPE pipe, coupler etc. transporting cable from storage site to work site including loading and unloading, pulling cable through pipe carefully, providing HDD route markers at pit locations etc. complete as per the direction of department officer at site excluding cost of cable. |
| 16 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 17 | Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally. |
| 18 | Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification. |
| 19 | Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable). |
| 20 | Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling. |
| 21 | Providing and laying in position Cement concrete 1:3:6 Please Enable Macros to View BoQ information |