|
| 1 | Providing round the clock Staff / Workmen for day to day opretion and preventive maintenance of Fire Fighting System, Electrical Wiring and Panel, Plumbing System, D. G. Set, Lift and Gate Security of Jharkhand Bhawan premises by deploying neatly dressed workmen in 8 hour’s shift including necessary T&P like torch, ladder. tools and uniform etc. complete, as per the direction of Engineer-in-charge. |
| 2 | Maintenace Manager |
| 3 | Supervisor |
| 4 | For Electrical Panels/Wiring |
| 5 | Electrician |
| 6 | Helper |
| 7 | Plumbing |
| 8 | Plumber |
| 9 | Helper |
| 10 | LIFT Operator |
| 11 | For Fire Fighting and Detection System |
| 12 | Fire Pump Operator |
| 13 | Helper |
| 14 | For DG set |
| 15 | DG Operator |
| 16 | DG Helper |
| 17 | For FAPA/CCTV |
| 18 | CCTV/FAPA Operator |
| 19 | Technician (WI-FI/Networking/CCTV) |
| 20 | CAR Lift and Stack Parking Machine Operator |
| 21 | Helper |
| 22 | Sewerage Treatment Plant |
| 23 | STP Operator |
| 24 | Helper |
| 25 | Carpentor |
| 26 | Helper |
| 27 | Providing round the clock security guard without gun for watch & ward of Government premises and its all belongings by deploying neatly dressed security guards in 8 hour’s shift including necessary T&P like torch, lathi and uniform etc.complete,as per the direction of Engineer-in-charge. (One job means 8 hour’s duty). |
| 28 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. |
| 29 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing ofjoints complete as per direction of Engineer in Charge. |
| 30 | 25 mm nominal dia Pipes |
| 31 | 50 mm nominal dia Pipes |
| 32 | Providing and fixing gun metal gate valve with C.I. wheel of approvedquality (screwed end) : |
| 33 | 25 mm |
| 34 | 50 mm |
| 35 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. |
| 36 | Wall painting with premium acylic emulsion paint of approved brand and manufacture to give an even shade: |
| 37 | Two coats on old work |
| 38 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or More coats on old work |
| 39 | Non-Scheduled Item Periodical servicing of 625 kva DG Set (DG-1 &DG-2) |
| 40 | OIL FILTER ELEMENT (1006828815) |
| 41 | FUEL-WATER SEPERATOR ELEMENT |
| 42 | Alternator Belt |
| 43 | Fan Belt |
| 44 | Cylinder Head Cover Gasket |
| 45 | Lube Oil TIR 7400 15W40 (Each Can in 50 Ltr.) |
| 46 | AUTO SUPRA |
| 47 | MAIN AIR FILTER ELEMENT |
| 48 | SAFETY FILTER ELEMENT |
| 49 | Service Engineer Visit Charges |
| 50 | Non Comprehensive AMC of A.O. Smith make Hot Water System (Heat Pump MC-38), through Manufacturer authorised agency, periodial servicing will be perform Four Times in a year, including descaling,deep cleaning and condenser coating four times in a year, as per direction of E/I. |
| 51 | Inspection, Testing and Servicing of Dry Transformer (1250KW) once in a year . (IR testing, Voltage Ratio Test, Magnetic Balance Test, Magnetic Test et . job also includes remove the dust particle, tightness of bushings and bus bars, Visual Inspection, checking of Hardware for its tightness, WTI Relay Scanner checking and Programming.including Testing of Testing of transformers including (IR testing, Voltage Ratio Test, Magnetic Balane Test, Magnetising Cureent Test etc.) |
| 52 | Servicing and Repairing of 630 Amp. VCB, 11 KV HT Panel board, removed the dust, moisture and checking connection tighten, checking protection relay and replacement of defective nut bolt complete including meggaring reassembling testing and commissioning etc as required . |
| 53 | Calibration of HT Panel Over load and each fault IDMT relay, cleaning. Checking of wiring system, calibration with secondary injection test kit, setting of tripping according to the load complete with testing and commissioning as required. |
| 54 | S/I/T/C of Spare parts of Dorma make RFID Lock Spares, |
| 55 | Dorma Battery Box for DEHL RFM 712 |
| 56 | ANSI Cylinder for DEHL-38mm (DT:40-51mm) |
| 57 | DORMA ANSI Mortise for DEHL RFM 712 ANSI-IR |
| 58 | DORMA Key hole Cover |
| 59 | Single use AA Alkaline batteries, Make: Duracell Ultra. |
| 60 | Service Charge of Diesel Engine Fire Pump including required consumables like Fuel Filter, Spin on Lube oil filter, Copper washer, Engine Oil-20 ltr, Filter,Air Cleaner Element,Distill Water, Synthetic Jelly etc. all complete job. |
| 61 | S/I/T/C of LED Street Light, 70 W, Aluminium Pressure die cast body, IP 66 protection of approved make Philips, Havelles, Wipro. |
| 62 | Comprehensive Annual Maintenance of 35 KLD STP, MBR Technology, for the period of One Year. Equipment Covered: Manual Screen,oil Skimmer,Basket screen,Sewage transfer pump,Sludge recirculation pump,Plant room sump plant,Air blower for EQT, Aeration & SHT,Air blower for MBR,MBR Module,CIP Pump,Clear water tranfer pump,Ozonator,Hydraulic filter press (12''x12''+12 plate), Dosing pump, Screw pump, Agitator,Panel,Electro-magnetic flow meter,Water level controller, Pressure gauge, etc. |
| 63 | Monthly Maintenance Schedule |
| 64 | • Checking pump operation, leakages, and abnormal noise.• Monitoring pressure gauges and flow meters, pressure switch.• Checking chemical dosing system.• Maintain operational parameters.• Lubrication pumps motor and Air blower.• Calibration of instruments.• Inspection of pipelines and valves• Cleaning of MBR Module as per requirement• Checking electrical panels and connections• Thorough inspection of all equipment• Performance evaluation of system efficiency |
| 65 | Visit Frequency: Minimum Two Visit per Month |
| 66 | Supply of following Consumable required for operation of STP, |
| 67 | Sodium Hypochloride solution |
| 68 | Poly Electrolyte for Volute |
| 69 | Micro-organisms Culture |
| 70 | DAP (Nitrogen & Phosphate Concentration 18% & 46%) |
| 71 | Urea (industrial using ammonia and Carbon diaxide) |
| 72 | Synthetic gear oil (Lubrication Oil), EP 90 |
| 73 | Belt SPA 1100 |
| 74 | Air blower Filter,M50 |
| 75 | Preventive Maintenance and Physical Testing of Portable Fire Extinguisher |
| 76 | ABC Stored Pressure type fire extinguisher, 6 kg Capacity |
| 77 | CO2 type 4.5 Kg. capacity Fire Extinguisher |
| 78 | ABC Stored Pressure type fire extinguisher, 4 kg Capacity |
| 79 | Foam Fire Extinguisher, 9 Litre Capacity |
| 80 | Checking, Testing, Commissioning and Repairing of Suppression System, 2kg Capacity, including pressuring the HST Tube with nitrogen gas and refilling of clean agent suppression fire extinuisher, complete job. |
| 81 | Repairing Charges of Bosch make Model-DINION IP 3000i IR, CCTV Camera including Motherboard repair / replacement, complete job. |
| 82 | Technician Visit Charges for Servicing of Water purifier (RO System) |
| 83 | Supply of following Consumable required for operation of Water puifier (RO), |
| 84 | Membrane Size 4040 of reputed make |
| 85 | String Wound Filter Cartridge 20\\" Long 5 Micron |
| 86 | RO Antiscalent Kleencare 121 |
| 87 | Add 18 % GST |
| 88 | Add 1% Labour Cess Please Enable Macros to View BoQ information |