| 1 | fo|qr forj.k [k.M lyseiqj esa dqy 02 vyx& vyx LFkkuksa ij vfrfjDr 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 2 | Safe loading, unloading and carriage of 11 M PCC Pole from departmental store to work site |
| 3 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 4 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 5 | Safe loading, unloading, carriage of 250 KVA T/F, from departmental store to work site |
| 6 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 7 | Grouting of Pole |
| 8 | Fitting of Earthing set on Pole |
| 9 | Fittiing of Stay |
| 10 | Grouting of Stay |
| 11 | Work of mounting and installation of 250 KVA distribution transformers. |
| 12 | Fittiing of Earthing set on Transfomer |
| 13 | Construction of plinth size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days |
| 14 | Pale Fancing of Plinth |
| 15 | Work of providing LT connection to the transformer through LT cable. |
| 16 | Safe erection, stringing and sagging of ACSR Weasel Conductor, complete in all respects as per site requirement |
| 17 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 18 | Stone Pad |
| 19 | Suspension Clamp |
| 20 | Dead End Clamp |
| 21 | Clamp for Top & Dropper & T-Off |
| 22 | Clamp for Stay |
| 23 | Nut & Bolts |
| 24 | Alluminium Lug |
| 25 | Copper L-Piece 50x225x10 mm |
| 26 | Alluminium Leg Long Barrel Off size |
| 27 | Tillless Unit |
| 28 | forj.k [k.M lyseiqj esa dqy 13 LFkkuksa ij vfrfjDr 63 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 29 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 30 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 31 | Safe loading, unloading and carriage of LT ABC (3x95+1x70+1x16) sqmm from departmental store to work site |
| 32 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 33 | Safe loading, unloading, carriage of 63 KVA T/F, from departmental store to work site |
| 34 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 35 | Grouting of Pole |
| 36 | Fitting of Earthing set on Pole |
| 37 | Fittiing of Stay |
| 38 | Grouting of Stay |
| 39 | Complete Fitting of MS Angle (T/F Base) |
| 40 | Complete Fitting of MS Top Channel |
| 41 | Complete Fitting of MS Dropper Channel |
| 42 | Work of mounting 63 KVA distribution transformer on double pole |
| 43 | Work of providing LT connection to the transformer through LT cable. |
| 44 | Fittiing of Earthing set on Transfomer |
| 45 | Safe erection, stringing and sagging of ACSR Weasel Conductor, complete in all respects as per site requirement |
| 46 | Safe erection, stringing and sagging of LT ABC (3x95+1x70+1x16) sqmm, complete in all respects as per site requirement |
| 47 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 48 | Stone Pad |
| 49 | Clamp for Distribution Box |
| 50 | Suspension Clamp |
| 51 | PG Clamp |
| 52 | Dead End Clamp |
| 53 | Eye Hook |
| 54 | J Hook |
| 55 | Clamp for Top & Dropper & T-Off |
| 56 | Clamp for Stay |
| 57 | Stay Insulator |
| 58 | LT Fuse Set With SMC Box |
| 59 | Cross Arm Holding Clamp |
| 60 | Nut & Bolts |
| 61 | Earth wire Clamp for PCC Pole |
| 62 | F Bracket |
| 63 | Alluminium Lug |
| 64 | Copper L-Piece 50x225x10 mm |
| 65 | Alluminium Leg Long Barrel Off size |
| 66 | forj.k [k.M lyseiqj esa dqy 06 LFkkuksa ij vfrfjDr 25 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 67 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 68 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 69 | Safe loading, unloading and carriage of LT ABC (3x50+1x35+1x16) sqmm from departmental store to work site |
| 70 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 71 | Safe loading, unloading, carriage of 25 KVA T/F, from departmental store to work site |
| 72 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 73 | Grouting of Pole |
| 74 | Fitting of Earthing set on Pole |
| 75 | Fittiing of Stay |
| 76 | Grouting of Stay |
| 77 | Complete Fitting of MS Angle (T/F Base) |
| 78 | Complete Fitting of MS Top Channel |
| 79 | Complete Fitting of MS Dropper Channel |
| 80 | Work of mounting 25 KVA distribution transformer on double pole |
| 81 | Work of providing LT connection to the transformer through LT cable. |
| 82 | Fittiing of Earthing set on Transfomer |
| 83 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 84 | Safe erection, stringing and sagging of LT ABC (3x50+1x35+1x16) sqmm, complete in all respects as per site requirement |
| 85 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 86 | Stone Pad |
| 87 | Clamp for Distribution Box |
| 88 | Suspension Clamp |
| 89 | PG Clamp |
| 90 | Dead End Clamp |
| 91 | Eye Hook |
| 92 | J Hook |
| 93 | Clamp for Top & Dropper & T-Off |
| 94 | Clamp for Stay |
| 95 | Stay Insulator |
| 96 | LT Fuse Set With SMC Box |
| 97 | Cross Arm Holding Clamp |
| 98 | LT Sackle Insulator |
| 99 | Nut & Bolts |
| 100 | Earth wire Clamp for PCC Pole |
| 101 | F Bracket |
| 102 | Alluminium Lug |
| 103 | Copper L-Piece 50x225x10 mm |
| 104 | Alluminium Leg Long Barrel Off size |
| 105 | forj.k [k.M lyseiqj esa dqy 04 LFkkuksa ij vfrfjDr 100 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 106 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 107 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 108 | Safe loading, unloading and carriage of LT ABC (3x120+1x95+1x16) sqmm from departmental store to work site |
| 109 | Safe loading, unloading and carriage of LT ABC (3x95+1x70+1x16) sqmm from departmental store to work site |
| 110 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 111 | Safe loading, unloading, carriage of 100 KVA T/F, from departmental store to work site |
| 112 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 113 | Grouting of Pole |
| 114 | Fitting of Earthing set on Pole |
| 115 | Fittiing of Stay |
| 116 | Grouting of Stay |
| 117 | Work of mounting and installation of 100 KVA distribution transformers. |
| 118 | Work of providing LT connection to the transformer through LT cable. |
| 119 | Fittiing of Earthing set on Transfomer |
| 120 | Complete Fitting of MS Top Channel |
| 121 | Complete Fitting of MS Dropper Channel |
| 122 | Complete Fitting of MS Angle (T/F Base) |
| 123 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 124 | Safe erection, stringing and sagging of LT ABC (3x120+1x95+1x16) sqmm, complete in all respects as per site requirement |
| 125 | Safe erection, stringing and sagging of LT ABC (3x95+1x70+1x16) sqmm, complete in all respects as per site requirement |
| 126 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 127 | Stone Pad |
| 128 | Clamp for Distribution Box |
| 129 | Suspension Clamp |
| 130 | PG Clamp |
| 131 | Dead End Clamp |
| 132 | Eye Hook |
| 133 | J Hook |
| 134 | Clamp for Top & Dropper & T-Off |
| 135 | Clamp for Stay |
| 136 | Stay Insulator |
| 137 | LT Fuse Set With SMC Box |
| 138 | Cross Arm Holding Clamp |
| 139 | LT Sackle Insulator |
| 140 | Nut & Bolts |
| 141 | Earth wire Clamp for PCC Pole |
| 142 | Alluminium Lug |
| 143 | Copper L-Piece 50x225x10 mm |
| 144 | Alluminium Leg Long Barrel Off size |
| 145 | forj.k [k.M lyseiqj esa dqy 14 LFkkuksa ij vfrfjDr 100 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z djk;k tkuk gSA |
| 146 | Safe loading, unloading and carriage of 8.5/9 M PCC Pole from departmental store to work site |
| 147 | Safe loading, unloading and carriage of ACSR Weasel Conductor from departmental store to work site |
| 148 | Safe loading, unloading and carriage of LT ABC (3x120+1x95+1x16) sqmm from departmental store to work site |
| 149 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 150 | Safe loading, unloading, carriage of 100 KVA T/F, from departmental store to work site |
| 151 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 152 | Grouting of Pole |
| 153 | Fitting of Earthing set on Pole |
| 154 | Fittiing of Stay |
| 155 | Grouting of Stay |
| 156 | Work of mounting and installation of 100 KVA distribution transformers. |
| 157 | Work of providing LT connection to the transformer through LT cable. |
| 158 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 159 | Safe erection, stringing and sagging of LT ABC (3x120+1x95+1x16) sqmm, complete in all respects as per site requirement |
| 160 | Fittiing of Earthing set on Transfomer |
| 161 | Complete Fitting of MS Angle (T/F Base) |
| 162 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 163 | Stone Pad |
| 164 | Clamp for Distribution Box |
| 165 | Suspension Clamp |
| 166 | PG Clamp |
| 167 | Dead End Clamp |
| 168 | Eye Hook |
| 169 | J Hook |
| 170 | Clamp for Top & Dropper & T-Off |
| 171 | Clamp for Stay |
| 172 | Stay Insulator |
| 173 | LT Fuse Set With SMC Box |
| 174 | Cross Arm Holding Clamp |
| 175 | Nut & Bolts |
| 176 | Earth wire Clamp for PCC Pole Please Enable Macros to View BoQ information |