|
| 1 | Photography work etc. |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil) As per DSR-2.1.1 |
| 3 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete.As per DSR-2.27 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR-4.1.8 |
| 5 | Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 7.5 in foundation and plinth Cement morter 1:4 .As DSR NO.- 6.1.1 |
| 6 | CEMENT PLASTER (IN FINE SAND)12 mm cement plaster of mix :in 1:4 (1 cement: 4 fine sand).AS per DSR No.- 13.1.1 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) :.As per DSR-5.2.2 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars.As per DSR-5.22.1 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns.As per DSR-4.3.1 |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil) As per DSR-2.1.1 |
| 11 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.As per DSR No.- 16.83 |
| 12 | Construction of granular surface Course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80 100 kn static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. |
| 13 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6: 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. |
| 14 | Providing and Laying of Rubble moulded Zig Zag Interlocking Concrete Blcok Pavements having thickness 60 mm as per drawing and Technical Specification Clause 1504 |
| 15 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). As per DSR No.- 16.84 |
| 16 | Providing & fixing display board. Please Enable Macros to View BoQ information |