| 1 | Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately). 10 Hp |
| 2 | Supply of 3 core 6 sqmm Jointing of XLPE Insulated and Sheated 3 Core Flat Type Copper Cable Conforming to IS 694/1990 and as amended Thereafter with ISI make including cost of handling charges and all other incidental charges. |
| 3 | Supply of 65mm UPVC Column pipe Supreme Heavy with ISI make including cost of handling charges and all other incidental charges. |
| 4 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe |
| 5 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. |
| 6 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm |
| 7 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification |
| 8 | Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm |
| 9 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. |
| 10 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend |
| 11 | 90 mm HDPE Elbow |
| 12 | 90 mm HDPE Flange set |
| 13 | 110 x 90 mm HDPE Reducer |
| 14 | 90 mm PVC Ball Valve |
| 15 | 90 mm HDPE Tee |
| 16 | 90 x 75 mm HDPE Reducer |
| 17 | 2\\" x 3\\" HDPE Reducer Please Enable Macros to View BoQ information |