| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 2 | Fitting one set AB switch and giving connection |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 4 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 5 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 6 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 7 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 8 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. |
| 9 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm by HDD method including cost of 110 mm HDPE pipe, coupler etc. transporting cable from storage site to work site including loading and unloading, pulling cable through pipe carefully, providing HDD route markers at pit locations etc. complete as per the direction of department officer at site excluding cost of cable. |
| 10 | Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification. |
| 11 | Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally. |
| 12 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 13 | Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable). |
| 14 | Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling. |
| 15 | Laying 3 x 300 sq mm 33kV XLPE cables in trench including drawing through pipes wherever necessary. |
| 16 | Providing and laying in position Cement concrete 1:3:6 |
| 17 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 18 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 19 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 20 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 21 | Fitting one additional HT pin with insulator |
| 22 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 23 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 24 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 25 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 26 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 27 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 28 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 29 | Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials. |
| 30 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 31 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 32 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 33 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 34 | Fitting and providing one Strut using A type pole incl. digging & back filling pit. Please Enable Macros to View BoQ information |