| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 80 Km.) |
| 2 | 11/0.4 KV T/F10KVA |
| 3 | 11/0.4 KV T/F 25KVA |
| 4 | 11/0.4 KV T/F 63 KVA |
| 5 | 11/0.4 KV T/F 100 KVA |
| 6 | 11/0.4 KV T/F 250 KVA |
| 7 | 11/0.4 KV T/F 400 KVA |
| 8 | PCC POLE 8.5 M LONG |
| 9 | ABC (3*50+1*35+1*16)SQMM |
| 10 | ACSR WEASEL CONDUCTOR |
| 11 | DE-CENTRALIZED MATERIALS, Provided Contractor |
| 12 | LT PVC Cable 3.5x70/35 sq mm |
| 13 | II KV DROPPER CHANNEL |
| 14 | SS BASE ANGLE |
| 15 | 11 KV FUSE SET |
| 16 | II KV COMPOSITE POLYMER PIN INSULATOR |
| 17 | 11 KV COMPOSITE POLYMER DISC INSULATOR |
| 18 | EARTHING COMPLETE (CHEMICAL PIPE) |
| 19 | TOP CHANNEL |
| 20 | GI WIRE 6 SWG |
| 21 | DISTRIBUTION BOX |
| 22 | SUSPENTION CLAMPS WITH I-HOOK |
| 23 | SUSPENTION CLAMPS WITH J-HOOK |
| 24 | LT PIERCING CONNECTOR 50 SQMM |
| 25 | LT PVC CABLE 1*400 SQMM |
| 26 | DEAD END CLAMP |
| 27 | TOP/DROPPER ANGLE CLAMPS |
| 28 | T/F CLAMP (BODY TO BASE) |
| 29 | NUT&BOLT (VAROIUS SIZE) |
| 30 | STAY SET COMPLETE |
| 31 | Tailness unit complete set with box |
| 32 | Cu'Z' Clamp |
| 33 | Alu. Lug 120 sq.mm |
| 34 | Alu. Lug 240/400 sq.mm |
| 35 | Mobile Trolly with fencing and four wheels suitable to carry Distribution T/F |
| 36 | Cable Al. 1x240sq.mm PVC |
| 37 | Tarnsormer Base Chanel |
| 38 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 39 | Cairrage of T/F capacity of 25KVA,63 KVA ,100 KVA, 250KVA & 400 KVA from Store to different site and Installation of T/f Capacity of 25KVA,63 KVA ,100 KVA, 250KVA & 400 KVA With All Accessories. |
| 40 | Cairrage of pole from store to site and Erection of single,double and four support PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. Proper Grouting of Poles. |
| 41 | Earthing Complete (CHEMICAL PIPE) with All Accessories. |
| 42 | Installaiton of stay with All Accessories . |
| 43 | Cairrage from store to site and Laying of ACSR Weasel Conductor with all accessories . |
| 44 | Cairrage from store to site and Laying of LT ABC (3x95+1x50+1x16) Sqmm with all accessories . |
| 45 | Installaiton of Trolly T/F with All Accessories . |
| 46 | Cairrage of Transformer capacity of 25KVA,63 KVA ,100 KVA, 250KVA & 400 KVA and other material from site to store. |
| 47 | Construction of Plinth For T/F 1.5*1.5*1 m with all material. Please Enable Macros to View BoQ information |