| 1 | Foundation |
| 2 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)II) Ordinary rock (not requiring blasting)(i) Depth upto 3 m ( without de-watering) |
| 3 | (IV) Hard rock ( blasting prohibited )Mechanical Means ( without de-watering) |
| 4 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 5 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications(G) RCC Grade M30Case-II Using Batching Plant, Transit Mixer and Concrete Pump |
| 6 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 7 | Providing and inserting dowels bars of 25 mm dia (TMT) to a depth of 500 mm anchored in the hard rock by grouting with cement slurry, as per specification and making good all complete as directed. |
| 8 | Sub-structurePlain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications(G) RCC Grade M30(q) Height 5m to 10mCase II) With Batching Plant, Transit Mixer and Concrete Pump |
| 9 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications |
| 10 | Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 11 | Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 12 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 13 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specificationA) Granular material |
| 14 | Super-structureSupply and fabrication of Structural Steel in Truss member, Stringer, Cross Girder etc. including wastage for Gusset Plate, Lacing, Batten Plate Shear Connector. |
| 15 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification(D) RCC Grade M 35Case II) Using Batching Plant, Transit Mixer and Concrete Pump(i) For solid slab super-structure(q) Height 5m to 10m |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications |
| 17 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications |
| 18 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification |
| 19 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for nstallation.) |
| 20 | Drainage spouts complete as per drawing and technical specifications |
| 21 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification |
| 22 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification |
| 23 | Routine Maintenance |
| 24 | Maintenance for first year |
| 25 | Maintenance for second year |
| 26 | Maintenance for third year |
| 27 | Maintenance for fourth year |
| 28 | Maintenance for fifth year |
| 29 | Add GST @ 18% for Construction cost only Please Enable Macros to View BoQ information |