|
| 1 | (DSR) 2023/ No - 2.6.1 - Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. All kinds of soil 0.00 Το 1.50M. Depth - (177.50x.7418) =131.6695 |
| 2 | DSR/23/4.1.10 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement: 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources) (0.7418 X 6518.60 - 4835.50 ) |
| 3 | DSR-2023/5.1.2 - Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (0.7418 x 9045.75 = 6710.14) |
| 4 | DSR-2023/item.5.22A.6 - Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete below plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 5 | DSR-2023/item no. 5.9.2 - Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. (842.50 x 0.7418 = 624.96) |
| 6 | AR - Dewatering/diversionof water by diesel engine pump operator fuel pump required length fuel pump required length flexible pipe for proper disposal of water etc all. |
| 7 | SOR- SOR)SI NO. 10.29/New Item 16- Providing & supply gunny bags including cost of sand and stitching of bags and laying in position. |
| 8 | AR P/F of PVC Pipe weep hole pipe etc. all comp @ 10.00 m interval 110mm θ pipe 250.00 |
| 9 | DSR 1.1.2 - Carriage of earth By Mechanical Transport including loading, unloading and stacking uptp 5 km (326.68x.7418=242.331) |
| 10 | DSR-2023 item NO. 2.25 (A) - Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete. (700.50 x.7418=519.63) |
| 11 | AR - Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directionsof Engineerin- Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 |
| 12 | AR - Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in unform single layer on sub-base /subgrade and compacting with the road roller to achieve the desire density. |
| 13 | (AR) Providing and applying primer coat with VG 10 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Reference of MORT&H 502) (Analysis attached) |
| 14 | (AR) Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregrated from approved quarry of specified grading premixed with bituminous binder VG-30 @4.50% by weight of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finished to required grade level and alignment rolling with smooth wheeled vibratory and tandem roller to achieve the desired compaction ( Ref to morth & H specification 507 ) adjustment for bitumen shall be done as per job mixture and e-in-c |
| 15 | (AR) Providing and applying tack coat with bitumen VG 10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. As per MORT&H specification No. 503 (Granular Surface)(Analysis attached) on full area of road |
| 16 | (AR) - Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects(Analysis attached) |
| 17 | DSR/23-13.80 - Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (156.05x.7418=115.76) |
| 18 | DSR/2023/13.46.1 - Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) (160.60X 0.7418 = 119.13) |
| 19 | DSR-2023/item no. 5.9.3 -Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform.(927.25 x 0.7418 = 687.83) Please Enable Macros to View BoQ information |