| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC Pole 8.5 Mtr. Long |
| 3 | ST Pole 11 Mtr. Long |
| 4 | AB Cable (3*50+1*35+1*16)MM^2 |
| 5 | AB Cable (3*95+1*70+1*16)MM^2 |
| 6 | AB Cable (3*120+1*95+1*16)MM^2 |
| 7 | AB Cable (1*25+1*16)MM^2 |
| 8 | LT Cable (3.5*35) MM^2 |
| 9 | LT Cable (3.5*150) MM^2 |
| 10 | Earthing Complete |
| 11 | 11 KV Stay Set (16x1800 mm) |
| 12 | Stay Wire (3.15 mm) 7/10 swg |
| 13 | ACSR Weasal Conductor |
| 14 | TF Clamp |
| 15 | MS Top Channel |
| 16 | 11 KV Top Channel |
| 17 | 11 KV Disc Insulator with Fitting |
| 18 | MS Dropper Channel |
| 19 | 11 KV Dropper Channel |
| 20 | Base Channel |
| 21 | T-off Channel |
| 22 | Barbed Wire |
| 23 | Guarding Wire |
| 24 | GI Wire 6 SWG |
| 25 | 11 KV Fuse Set |
| 26 | MS Angle 75x75x6x2028 mm |
| 27 | 11 KV Pin Insulator with Pin Nut |
| 28 | Stay Clamp |
| 29 | DP Clamp |
| 30 | 16 KVA 11/.25 KV T/F New |
| 31 | 25 KVA Three Phase T/F |
| 32 | 63 KVA 11/.40 KV T/F New |
| 33 | 100 KVA 11/.40 KV T/F New |
| 34 | Supply & Erection of Following Material as per UPPCL/DVVNL/ RESPO Norms and Standard/Related IS (Note: All Petty item required for proper completion of work will be by provided by the contractor free of cost.) |
| 35 | Copper L-Piece |
| 36 | I Hook with Clamp |
| 37 | J-Hook |
| 38 | Earthing of PCC Pole |
| 39 | Suspension Clamp |
| 40 | Earthing of 25 KVA T/F with Body and Neutral |
| 41 | LT Fuse Set Protection |
| 42 | Lug 50 Mm2 |
| 43 | Lug 150 Mm2 |
| 44 | Dead End Clamp |
| 45 | Piercing Connector |
| 46 | T/F Holding Clamp |
| 47 | PG Clamp |
| 48 | I Bolt |
| 49 | Clamp for T-off Channel |
| 50 | Nut Bolt |
| 51 | Guarding Angle |
| 52 | Guarding Angle Clamp |
| 53 | Distribution Box |
| 54 | Distribution Box Clamp |
| 55 | Danger Board with Clamp |
| 56 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 57 | Erection of P.C.C. Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 58 | Grouting of P.C.C. Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 59 | Grouting ofSTP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 60 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 61 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 62 | Grouting of Stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 63 | Laying & erection of ACSR WEASEL CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 64 | Laying & erection ofAB Cable (3*50+1*35+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 65 | Laying & erection of1AB Cable (3*95+1*70+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 66 | Laying & erection of AB Cable (3*120+1*95+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 67 | Laying & erection ofAB Cable (1*25+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 68 | Laying & erection of LT Cable (3.5*35) MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 69 | Laying & erection of LT Cable (3.5*150) MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 70 | Earthing Complete |
| 71 | Stay Wire (3.15 mm) 7/10 swg |
| 72 | TF Clamp |
| 73 | MS Top Channel |
| 74 | 11 KV Top Channel |
| 75 | 11 KV Disc Insulator with Fitting |
| 76 | MS Dropper Channel |
| 77 | 11 KV Dropper Channel |
| 78 | Base Channel |
| 79 | T-off Channel |
| 80 | Barbed Wire |
| 81 | Guarding Wire |
| 82 | GI Wire 6 SWG |
| 83 | 11 KV Fuse Set |
| 84 | MS Angle 75x75x6x2028 mm |
| 85 | 11 KV Pin Insulator with Pin Nut |
| 86 | Stay Clamp |
| 87 | DP Clamp |
| 88 | 16 KVA 11/.25 KV T/F New |
| 89 | 25 KVA Three Phase T/F |
| 90 | 63 KVA 11/.40 KV T/F New |
| 91 | 100 KVA 11/.40 KV T/F New |
| 92 | Chemical Earthing with connection by strip |
| 93 | Mounting of New T/F Please Enable Macros to View BoQ information |