| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | ST Pole 11 Mtr. Long |
| 3 | PCC POLE 8.5 Mtr. Long |
| 4 | MS Channel dropper |
| 5 | Base channel |
| 6 | MS Channel top |
| 7 | 11 kv disc insulator |
| 8 | 11 kv disc fitting |
| 9 | T-off Channel |
| 10 | T-off channel clamp |
| 11 | 11 kv pin insulator |
| 12 | 11 kv pin with nut |
| 13 | stay complete |
| 14 | ACSR Weasel Conductor |
| 15 | DP Clamp |
| 16 | DP Clamp ST Pole for Shackle insulator |
| 17 | 11 kv fuse set |
| 18 | Cross Arm |
| 19 | Cross Arm Holding Clamp |
| 20 | 11 kv F-Clamp |
| 21 | Abc cable (3*95+1*70+1*16)MM^2 |
| 22 | Abc cable (3*120+1*95+1*16)MM^2 |
| 23 | LT PVC Cable 3.5*150 mm^2 |
| 24 | LT PVC Cable 1*400 mm^3 |
| 25 | Earthing complete |
| 26 | Distribution box 3 phase |
| 27 | Distribution box 3 phase clamp |
| 28 | PG CLAMP Weasel to Weasel |
| 29 | NEW 25 KVA 11/.4 KV TRANFORMER |
| 30 | NEW 63 KVA 11/.4 KV TRANFORMER |
| 31 | NEW 100 KVA 11/.4 KV TRANFORMER |
| 32 | NEW 250 KVA 11/.4 KV TRANFORMER |
| 33 | Supply & Erection of Following Material as per UPPCL/DVVNL/ RESPO Norms and Standard/Related IS (Note: All Petty item required for proper completion of work will be by provided by the contractor free of cost.) |
| 34 | Stone Pad |
| 35 | Copper L Piece |
| 36 | I Hook |
| 37 | I Hook Clamp |
| 38 | LT FUSE SET Protection unit |
| 39 | Lug 150 mm^2 |
| 40 | Dead end clamp |
| 41 | Suspension clamp |
| 42 | Piercing connector |
| 43 | Barbed Wire |
| 44 | No. Plate |
| 45 | Nut & Bolt |
| 46 | Danger Board |
| 47 | RED Oxide Paint |
| 48 | All. Paint |
| 49 | Tailless unit 400 Amp |
| 50 | All Lug 400 sqmm |
| 51 | Lt Shakle Insulator |
| 52 | Lt shakle Strip with N&B |
| 53 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 54 | Erection of P.C.C. Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 55 | Grouting of P.C.C. Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 56 | Grouting ofSTP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 57 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 58 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 59 | Grouting of Stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 60 | Laying & erection of ACSR WEASEL CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 61 | Laying & erection of1AB Cable (3*95+1*70+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 62 | Laying & erection of AB Cable (3*120+1*95+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 63 | Laying & erection of LT Cable (3.5*150) MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 64 | Laying & erection of LT Cable (1*400) MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 65 | Earthing complete |
| 66 | Distribution box 3 phase |
| 67 | Distribution box 3 phase clamp |
| 68 | PG CLAMP Weasel to Weasel |
| 69 | NEW 25 KVA 11/.4 KV TRANSFORMER |
| 70 | NEW 63 KVA 11/.4 KV TRANSFORMER |
| 71 | NEW 100 KVA 11/.4 KV TRANSFORMER |
| 72 | NEW 250 KVA 11/.4 KV TRANSFORMER |
| 73 | Chemical Earthing for for Neutral & Body as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 74 | Deep Pipe Earthing of T/f Neutral as per Standard Specifications & as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 75 | Mounting of 250 KVA T/F on the plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 76 | Construction of Plinth Suitable for 250 KVA T/F with material (Sand, Bricks, Cement) & T&P Labour as per respo manual. All meterial Cement, Sand , Blast Stone will be provided by the contractor. |
| 77 | Fencing of T/F Plinth including material Labour & T&P as per respo manual. Please Enable Macros to View BoQ information |