| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC POLE 8.5 MTR.LONG |
| 3 | ST POLE 11 MTR. LONG |
| 4 | Earthing Complete |
| 5 | Stay Rod |
| 6 | Stay Wire |
| 7 | Stay CLAMP |
| 8 | STAY INSULATOR |
| 9 | ACSR WEASEL CONDUCTOR |
| 10 | ACSR RACOON CONDUCTOR |
| 11 | 11 KV DISC INSULATOR |
| 12 | 11 DISC FITTING |
| 13 | 11 KV V-TYPE CROSS ARM |
| 14 | 11 KV PIN INSULATOR WITH PIN |
| 15 | GI WIRE 6 SWG |
| 16 | GI WIRE 8 SWG |
| 17 | AL. BINDING WIRE 10 SWG |
| 18 | T-OFF CHANNEL |
| 19 | 11 KV 3*185 SQMM XLPE CABLE |
| 20 | 11 KV 3*185 CABLE BOX O/D |
| 21 | Supply & Erection of Following Material as per UPPCL/DVVNL/ RESPO Norms and Standard/Related IS (Note: All Petty item required for proper completion of work will be by provided by the contractor free of cost.) |
| 22 | STONE PAD |
| 23 | NUMBER PLATE WITH CLAMP N&B |
| 24 | DANGER BOARD WITH CLAMP N&B |
| 25 | NUT BOLT ALL SIZE |
| 26 | RED OXIDE PAINT |
| 27 | Al. PAINT |
| 28 | GUARDING ANGLE |
| 29 | GUARDING ANGLE CLAMP |
| 30 | CROSS ARM HOLDING CLAMP |
| 31 | F-CLAMP |
| 32 | PG CLAMP |
| 33 | HDPE PIPE |
| 34 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 35 | Erection of P.C.C. Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 36 | Grouting of P.C.C. Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 37 | Grouting ofSTP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 38 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 39 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 40 | Grouting of Stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 41 | Laying & erection of ACSR WEASEL CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 42 | Laying & erection ofACSR RACOON CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 43 | Laying & erection of11 KV 3*185 SQMM XLPE CABLE as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 44 | 11 KV DISC INSULATOR |
| 45 | 11 DISC FITTING |
| 46 | 11 KV V-TYPE CROSS ARM |
| 47 | 11 KV PIN INSULATOR WITH PIN |
| 48 | GI WIRE 6 SWG |
| 49 | GI WIRE 8 SWG |
| 50 | AL. BINDING WIRE 10 SWG |
| 51 | T-OFF CHANNEL |
| 52 | Dismantling of existing line/ T/f and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. Please Enable Macros to View BoQ information |