| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC POLE 8.5 MTR.LONG |
| 3 | STP 11 MTR LONG |
| 4 | STONE PAD |
| 5 | 11 KV PIN INSULATOR |
| 6 | 11 KV PIN WITH NUT |
| 7 | 11 KV DISC FITTING |
| 8 | 11 KV POLYMER DISC INSULATOR (T&C) 45 KN |
| 9 | ACSR WEASEL CONDUCTOR |
| 10 | ACSR Rabbit CONDUCTOR |
| 11 | 11 KV F Clamp for PCC Pole 8.5 Mtr Long |
| 12 | 11 KV V-TYPE STEEL CROSS-ARM 65X65X6 MM |
| 13 | 11 KV Cross Arm Clamp for PCC Pole 8.5 M |
| 14 | EARTHING COMPLETE |
| 15 | STAY COMPLETE |
| 16 | G.I. WIRE 8 SWG |
| 17 | G.I. GUARDING ANGLE 65X65X6X1600 MM |
| 18 | Barbed Wire |
| 19 | Supply & Erection of Following Material as per UPPCL/DVVNL/ RESPO Norms and Standard/Related IS (Note: All Petty item required for proper completion of work will be by provided by the contractor free of cost.) |
| 20 | Guarding Angle Clamp |
| 21 | NUT & BOLT WITH WASHER |
| 22 | CONCRETING OF STAY |
| 23 | CONCRETING OF POLE |
| 24 | NUMBER PLATE |
| 25 | Danger Board with nut & bolt |
| 26 | ALU. WINDING WIRE |
| 27 | MS T-OFF Channel 100x50x1300 mm |
| 28 | T-Off Clamp for 8.5 M PCC Pole |
| 29 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 30 | Erection of P.C.C. Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 31 | Grouting of P.C.C. Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 32 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 33 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 34 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 35 | Grouting of Stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 36 | Laying & erection of ACSR WEASEL CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 37 | Laying & erection of ACSR Rabbit CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 38 | STONE PAD |
| 39 | 11 KV PIN INSULATOR |
| 40 | 11 KV PIN WITH NUT |
| 41 | 11 KV DISC FITTING |
| 42 | 11 KV POLYMER DISC INSULATOR (T&C) 45 KN |
| 43 | 11 KV F Clamp for PCC Pole 8.5 Mtr Long |
| 44 | 11 KV V-TYPE STEEL CROSS-ARM 65X65X6 MM |
| 45 | 11 KV Cross Arm Clamp for PCC Pole 8.5 M |
| 46 | EARTHING COMPLETE |
| 47 | G.I. WIRE 8 SWG |
| 48 | G.I. GUARDING ANGLE 65X65X6X1600 MM |
| 49 | Barbed Wire |
| 50 | Dismantling of existing line/ T/f and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. Please Enable Macros to View BoQ information |