| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC POLE 8.5 MTR LONG |
| 3 | 11 KV DISC INSULATOR |
| 4 | 11 KV DISC FITING |
| 5 | T-OFF CHANNEL |
| 6 | 11 KV PIN INSULATOR |
| 7 | 11 KV PIN WITH NUT |
| 8 | STEY SET COMPLETE |
| 9 | ACSR WEASEL CONDECTOR |
| 10 | 11 KV FUSE SET |
| 11 | LT ABC CABLE 1X25+1X16 |
| 12 | EARTHING COMPLETE |
| 13 | GI WIRE |
| 14 | GUARDING ANGLE |
| 15 | STP 11 MTR LONG |
| 16 | DROPPER CHANNAL |
| 17 | TOP CHANNEL |
| 18 | BASE CHANNEL |
| 19 | LT ABC CABLE 3X120+1X95+1X16 |
| 20 | LT ABC CABLE 3X50+1X35+1X16 |
| 21 | 11 KV STEEL CROSS ARM |
| 22 | TPMO WITH POLYMER INSULATOR |
| 23 | LT PVC CABLE 3.5X150 SQMM |
| 24 | LT ABC CABLE 3X95+1X70+1X16 |
| 25 | BARBED WIRE |
| 26 | DB BOX 3 FASE |
| 27 | TF CLAMP |
| 28 | BARBED CLAMP |
| 29 | NEW 16 KVA TRANFORMER |
| 30 | NEW 25 KVA 11/.4 KV TRANFORMER |
| 31 | NEW 63 KVA 11/.4 KV TRANFORMER |
| 32 | NEW 100 KVA 11/.4 KV TRANFORMER |
| 33 | Supply & Erection of Following Material as per UPPCL/DVVNL/ RESPO Norms and Standard/Related IS (Note: All Petty item required for proper completion of work will be by provided by the contractor free of cost.) |
| 34 | EYE HOOK |
| 35 | ALUMINIUM LUG CRIMPING TYPE 50 SQMM |
| 36 | DEAD END CLAMP |
| 37 | LT PEARCING CONECTOR 95/120 |
| 38 | N & B ALL SIZE |
| 39 | D B BOX CLAMP |
| 40 | DANGER BOARD |
| 41 | GUARDING CLAMP |
| 42 | TF BASE ANGAL WITH CLAMP |
| 43 | COPEER L PEACE |
| 44 | ALUMINIUM LUG CRIMPING TYPE 150 SQMM |
| 45 | LT FUSE SET |
| 46 | T-OFF CLAMP |
| 47 | 11 KV DP CLAMP |
| 48 | SUSPENTION CLAMP WITH EYE HUK |
| 49 | ABC CLAMP FOR 8.5 MTR PCC |
| 50 | CONNECTING LEAD FOR DB BOX |
| 51 | PG CLAMP |
| 52 | L TYPE 25-100 KVA |
| 53 | ALUMINIUM LUG CRIMPING TYPE 200 SQMM |
| 54 | F CLAMP FOR 8.5 MTR PCC |
| 55 | CROSS ARM HOLDING CLAMP |
| 56 | NO PLATE |
| 57 | 4 CORE LT MCB BOX |
| 58 | STONE PAD |
| 59 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 60 | Erection of P.C.C. Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 61 | Grouting of P.C.C. Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 62 | Grouting of STP 11 MTR LONG as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 63 | Grouting of STP 11 MTR LONG as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 64 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 65 | Grouting of Stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 66 | Laying & erection of ACSR WEASEL CONDUCTOR as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 67 | Laying & erection of AB Cable (3X95+1X70+1X16) as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 68 | Laying & erection of AB Cable (3*120+1*95+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 69 | Laying & erection of LT ABC CABLE 3X50+1X35+1X16 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 70 | Laying & erection of LT PVC Cable (3.5*150) MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 71 | Laying & erection of LT ABC CABLE 1X25+1X16 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 72 | 11 KV DISC INSULATOR |
| 73 | 11 KV DISC FITING |
| 74 | T-OFF CHANEL |
| 75 | 11 KV PIN INSULATOR |
| 76 | 11 KV PIN WITH NUT |
| 77 | 11 KV FUSE SET |
| 78 | EARTHING COMPLETE |
| 79 | GI WIRE |
| 80 | GUARDING ANGLE |
| 81 | DROPPER CHANNAL |
| 82 | TOP CHANNEL |
| 83 | BASE CHANNEL |
| 84 | 11 KV STEEL CROSS ARM |
| 85 | TPMO WITH POLYMER INSULATOR |
| 86 | BARBED WIRE |
| 87 | DB BOX 3 FASE |
| 88 | TF CLAMP |
| 89 | BARBED CLAMP |
| 90 | NEW 16 KVA 11/.4 KV TRANSFORMER |
| 91 | NEW 25 KVA 11/.4 KV TRANSFORMER |
| 92 | NEW 63 KVA 11/.4 KV TRANSFORMER |
| 93 | NEW 100 KVA 11/.4 KV TRANSFORMER |
| 94 | Chemical Earthing for for Neutral & Body as per RESPO Norms (All the material for earthing will be provided by the contractor) Please Enable Macros to View BoQ information |