| 1 | Total of Schedule-A (NDSR Items) + Schedule-B (DSR 2023 Items) |
| 2 | Total of Schedule-A (NDSR Items) |
| 3 | Total of Schedule-B (DSR 2023 Items) OCW-2184 APPENDIX- 3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. It shall be noted that in case Nil/Zero/NA Price quoted by Tenderer in Appendix-3A then it shall mean that contractor has quoted same price for deviation and undeviation bid. 4. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer OCW-2184 Preamble |
| 4 | The Bill of Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to Tenderers, General and Special Conditions of Contract, Employer's Requirement, Technical Specifications and other relevant documents. |
| 5 | BoQ1 consists of two schedules i.e. Schedule ‘A’ for NDSR items and Schedule 'B' for DSR-2023 items. |
| 6 | The rates and prices to be tendered in the unit Priced Bill of Quantities of Schedule ‘A’ for NDSR items , Schedule 'B' for DSR 2023 items for completed and finished items of works and complete in all respect. |
| 7 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less for Schedule-A and Schedule-B in figures in the appropriate highlighted cells in the BoQ sheet. All the quoted rates will be deemed to include Duties, Taxes, Octroi, Royalty etc., cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/ overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C2.5 of ITT & clause 10 of SCC. |
| 8 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 9 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 10 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 11 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://etenders.gov.in/eprocure/app. The rates shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote the rates against each highlighted cells in BoQ1. After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 12 | The actual work executed against all the BOQ as detailed in tender document would be paid on measurement basis. |
| 13 | The contractor may raise their “On Account” payments on monthly basis as per the status of work on the last day of the respective month as per Employer's Requirement. |
| 14 | In case of DSR item the description is given in brief and detailed description of item should be as given in DSR 2023 published by CPWD. Please Enable Macros to View BoQ information DELHI METRO RAIL CORPORATION LIMITED BOQ Name of Work - Contract No.: OCW-2184 - “Renovation of Parkings of Uttam Nagar East, Subhash Nagar, Kirti Nagar, Patel Nagar and Karkardooma Metro Stations and painting of Moti Nagar and Ramesh Nagar Metro Stations and other miscellaneous works of line 3.” S. No. Item No. Description of Items Unit Qty Rate(inclusive of GST) Amount (₹)(including GST) Schedule-A (NDSR Items) |
| 15 | 1.0 Total Amount of Schedule-A (NDSR Items) (excluding GST) 1130734.32 GST@18% 203532.18 Total of Schedule-A (inclusive of all, GST@18%) 0.0 Total Amount of Schedule-A (NDSR Items) (inclusive of all, GST@18%) 1334266.5 Schedule-B (DSR 2023 Items) |
| 16 | 1.1.1 |
| 17 | 2.1 2.10.1 All kind of Soil 2.10.1.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia metre 735.0 352.15 258830.25 |
| 18 | 4.1 4.1.2 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) cum 32.0 8340.85 266907.2 |
| 19 | 5.1 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) cum 20.0 9045.75 180915.0 |
| 20 | 6.1 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 37.0 7370.65 272714.05 4514050.0 |
| 21 | 6.4 6.4.1 Cement mortar 1:4 (1 cement : 4 coarse sand) cum 133.0 9344.35 1242798.55 |
| 22 | 10.16 10.16.1 Hot finished welded type tubes kg 3500.0 194.4 680400.0 |
| 23 | 10.25 10.25.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works kg 12000.0 172.6 2071200.0 |
| 24 | 10.28 |
| 25 | 11.26 11.26.1 25 mm thick sqm 110.0 1948.25 214307.5 |
| 26 | 13.4 13.4.1 1:4 (1 cement: 4 coarse sand) sqm 855.0 357.35 305534.25 |
| 27 | 13.5 13.5.1 1:4 (1 cement: 4 coarse sand) sqm 790.0 411.75 325282.5 |
| 28 | 13.46 13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) sqm 2360.0 160.6 379016.0 |
| 29 | 13.52 13.52.1 On steel work sqm 3250.0 241.75 785687.5 |
| 30 | 13.85 13.85.3 With water thinnable cement primer on wall surfacehaving VOC content less than 50 grams/litre sqm 35000.0 73.95 2588250.0 |
| 31 | 13.11 13.110.1 Old work (Two or more coats on existing cement paint surface applied @ 3.28 ltr/10 sqm. Sqm 15000.0 169.2 2538000.0 |
| 32 | 13.111 13.111.1 Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface sqm 19600.0 120.75 2366700.0 |
| 33 | 14.72 |
| 34 | 14.77 |
| 35 | 15.2 15.2.1 Nominal concrete 1:3:6 or richer mix (including equivalent design mix) Cum 200.0 2434.25 486850.0 |
| 36 | 5.9 5.9.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Sqm 50.0 842.5 42125.0 |
| 37 | 15.28 15.28.1 G.S. Sheet sqm 4000.0 164.95 659800.0 |
| 38 | 16.53 |
| 39 | 16.68 |
| 40 | 16.69 |
| 41 | 16.75 |
| 42 | 16.81 |
| 43 | 16.83 |
| 44 | 16.84 |
| 45 | 19.2 19.2.4 250 mm diameter S.W. Pipe metre 45.0 1590.55 71574.75 |
| 46 | 19..6 19.6.4 300 mm dia. R.C.C. pipe metre 215.0 994.3 213774.5 |
| 47 | 19.9 19.9.1 0.91 m deep with S.F.R.C. cover and frame (heavy duty, HD-20 grade designation) 560 mm internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg., fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12 mm thick cement plaster at the external surface shall be paid for separately) : 19.9.1.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 each 58.0 12725.0 738050.0 |
| 48 | 19.19.3.1 |
| 49 | 19.26.1 |
| 50 | 16.78 16.78.1 With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 Cum 300.0 2784.0 835200.0 |
| 51 | Total amount of Schedule-B (DSR 2023 Items) (excluding GST) 38357102.03 Total amount of Schedule-B (DSR 2023 Items) with CPWD indexation @ 0.973 (excluding GST) 37321460.28 GST@18% 6717862.85 Total amount of Schedule-B (inclusive of all, GST@18%) 44039323.13 Total amount of Schedule-A & Schedule-B (excluding GST) 38452194.6 Total amount of Schedule-A & Schedule-B (inclusive of all, GST@18%) 45373589.63 |