|
| 1 | Painting & Renovation of VIP guest rooms of Field Hostel |
| 2 | Installation of PVC Louvers (Providing and fixing PVC louvers of approved make and shade in required size for interior application, including necessary frame, screws, fasteners, cutting, fitting, and finishing complete as per direction of Engineer-in-charge.) |
| 3 | Installation of Track Light/Ball Light Batt (Providing and fixing LED track lighting system of approved make and model for hall area, comprising aluminum track channel 1 meter length as required, copper conductor track, end caps, connectors, suspension kit / surface mounting accessories, and LED track light fixtures of required wattage 12/15WA with high-efficiency COB LED.The track light fittings shall be made of die-cast aluminum housing with powder-coated finish, adjustable swivel type for directional lighting, complete with inbuilt electronic driver, suitable for 230V;50Hz single phase AC supply.The work shall include fixing the track on ceiling (surface / suspended as required), proper alignment, electrical connections with suitable copper wiring from nearest junction box, earthing, testing and commissioning, complete in all respects as per approved layout and direction of Engineer-in-Charge.) |
| 4 | TV Back Panel (Providing and fixing TV back panel of approved design and finish, made of 12mm/18mm thick commercial grade plywood / HDHMR board fixed over necessary wooden framework, finished with 1.0 mm thick laminate of approved shade and texture on exposed surfaces.The work shall include providing necessary supports, screws, adhesive, edge banding with PVC edge tape, cut-outs for TV mount bracket, cable management openings, and provision for concealed wiring.) |
| 5 | Wall Art Painting (Providing and supplying premium quality wall art painting of approved theme, approx size of 0.6mx1m, and design, suitable for interior décor, comprising high-resolution printed artwork / hand-painted artwork on canvas mounted over wooden frame of adequate thickness, with finished edges.The painting shall be of superior quality with fade-resistant inks / colors, protected with clear matte / gloss coating as required. The artwork shall be stretched over seasoned wooden stretcher frame and provided with necessary hanging hardware at the rear.The item includes delivery at site, careful handling, and installation at designated location on wall, complete in all respects as per approved sample and direction of Engineer-in-Charge.) |
| 6 | Window Blind (Providing and fixing window blinds of approved design and shade for windows, made of high-quality fabric / polyester mate, suitable for interior application.The blinds shall be roller type complete with powder-coated aluminum head rail, bottom rail, operating mechanism with side chain / cord / wand control, and all necessary mounting brackets and accessories.The fabric shall be dust-resistant, colorfast, and UV-resistant, with smooth rolling/sliding operation.The work includes proper measurement of window opening, fabrication as per required size, fixing true to line and level using screws and fasteners, testing of smooth operation, and handing over complete in all respects as per approved sample and direction of Engineer-in-Charge) |
| 7 | Interior Emulsion Painting (Providing and applying premium quality interior acrylic emulsion paint (Asian Paints Royale / Berger Silk Glamor / Nerolac Impression or equivalent approved brand) on interior walls, of approved shade and finish (matt / satin / sheen), over properly prepared surface.The work shall include thorough surface preparation such as cleaning, scraping of loose particles, sand papering, filling of cracks and minor undulations with wall putty, applying one coat of suitable primer, followed by two or more coats of premium acrylic emulsion paint to achieve smooth, uniform, and durable finish.The paint shall be washable, low VOC, fungus-resistant, and provide superior stain resistance with smooth finish.The rate shall include cost of all materials, labour, scaffolding, surface protection, curing (if required), tools and tackles, masking of adjacent surfaces, and cleaning of site after completion, complete in all respects as per manufacturer’s specification and direction of Engineer-in-Charge.) Please Enable Macros to View BoQ information |