| 1 | DPPL Panipat Mainline |
| 2 | Supply of CTSU Data logger with GSM for monitoring of PSP and pipe current from Test Lead Point (TLP) with remote data transmission facility via GSM communication with 5 no. of high accuracy, high input impedance, 16 bit resolution input channels with high Common Mode Rejection Ratio (CMRR) including SIM. |
| 3 | Supply of Cu-CuSO4 permanent half cell with tail cable as per technical specification |
| 4 | Supply and Installation of prefabricated CS corrosion coupon with 1 sq. cm bare metal with 2 numbers 4 sq. mm lead of minimum 10 m long lead in a sdistance of 0.5 m from the pipeline inclusive of cable & terminating the cable in the TLP terminal. The corrosion couponf are to be installed with specified test lead points for which prior apporval to be obtained from owner. The item also incluseds supply, installation, laying & termination of all CU cables of required length (as per site condition) and size as mentioned in the standard drawing, toggle switch, cable glands and lugs etc. , complete in all respect as per the direction and specification detailed in the documetn complete with all tools , takles & other necessary requirement for preparation of the coupon . The work complete in all respect shall include supply of all the labours, tols etc. compete as per the direction of site engineer/engineer in charge. |
| 5 | Installation and commissioning of data loggers in existing IOCL TLPs including programming complete in all respect as per technical specification |
| 6 | Installation of Permanent half cells including connecting the cable in the TLP etc. with cable lugs, sealing material, laying of cable, testing & commissioning of cell etc. all complete with required material, excavation, backfilling etc. as per specifications, recommendation of cell supplier and directions of Site Engineer / Engineer-in-Charge. |
| 7 | DPPL Dadri Mainline |
| 8 | Supply of CTSU Data logger with GSM for monitoring of PSP and pipe current from Test Lead Point (TLP) with remote data transmission facility via GSM communication with 5 no. of high accuracy, high input impedance, 16 bit resolution input channels with high Common Mode Rejection Ratio (CMRR) including SIM. |
| 9 | Supply of Cu-CuSO4 permanent half cell with tail cable as per technical specification |
| 10 | Supply and Installation of prefabricated CS corrosion coupon with 1 sq. cm bare metal with 2 numbers 4 sq. mm lead of minimum 10 m long lead in a sdistance of 0.5 m from the pipeline inclusive of cable & terminating the cable in the TLP terminal. The corrosion couponf are to be installed with specified test lead points for which prior apporval to be obtained from owner. The item also incluseds supply, installation, laying & termination of all CU cables of required length (as per site condition) and size as mentioned in the standard drawing, toggle switch, cable glands and lugs etc. , complete in all respect as per the direction and specification detailed in the documetn complete with all tools , takles & other necessary requirement for preparation of the coupon . The work complete in all respect shall include supply of all the labours, tols etc. compete as per the direction of site engineer/engineer in charge. |
| 11 | Installation and commissioning of data loggers in existing IOCL TLPs including programming complete in all respect as per technical specification |
| 12 | Installation of Permanent half cells including connecting the cable in the TLP etc. with cable lugs, sealing material, laying of cable, testing & commissioning of cell etc. all complete with required material, excavation, backfilling etc. as per specifications, recommendation of cell supplier and directions of Site Engineer / Engineer-in-Charge. |
| 13 | Installation and commisioning of system |
| 14 | Installation and commissioning of Data acquisition system and online monitoring portal for data acquisition from CTSU to IOCL server along with lifetime license of database as per technical specification |
| 15 | 5yr o&m support for CTSU data logger |
| 16 | 5yrs O&M Support- For Online Portal, maintenance of SIM and Recharge after defect liability period |
| 17 | 5yr O&M Support for online portal |
| 18 | 5yrs O&M Support-R&M of CTSU datalogger Repair and maintenance of defective CTSU Please Enable Macros to View BoQ information |