|
| 1 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r vfrfjDr ,y0Vh0 lfdZV fuekZ.k ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 2 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 3 | LT AB Cable (3X120+1X95+1X16) sq mm |
| 4 | PCC Pole 8.5 Mtr |
| 5 | Earthing complete |
| 6 | Supply of following material/fitting complete in all respect :- |
| 7 | LT Cable 1X35 sq mm |
| 8 | G.I Nuts & bolts of different sizes |
| 9 | LT pole Clamp with nuts & bolts |
| 10 | LT Three Phase Distribution box |
| 11 | Clamp for LT Three Phase DB Box |
| 12 | Suspension Clamp with I hook (Insulated) |
| 13 | Dead end Clamp with I hook (Insulated) |
| 14 | Piercing Connector (Insulated) |
| 15 | The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/PCC/LT clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESSPO norms & relevent IS Specification. |
| 16 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 17 | Laying & sagging of LT ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. Al. cable for giving connection to Street Light and including disconnection & reconnection of consumer cables, nuts&bolts off size by the contractor. |
| 18 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ohty ls ,0ch0 dscy dks cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 19 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 20 | LT AB Cable (3X120+1X95+1X16) sq mm |
| 21 | PCC Pole 8.5 Mtr |
| 22 | Earthing complete |
| 23 | Supply of following material/fitting complete in all respect :- |
| 24 | LT Cable 1X35 sq mm |
| 25 | G.I Nuts & bolts of different sizes |
| 26 | LT pole Clamp with nuts & bolts |
| 27 | LT Three Phase Distribution box |
| 28 | Clamp for LT Three Phase DB Box |
| 29 | Suspension Clamp with I hook (Insulated) |
| 30 | Dead end Clamp with I hook (Insulated) |
| 31 | Piercing Connector (Insulated) |
| 32 | The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/PCC/LT clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).All work will be done as per RESSPO norms & relevent IS Specification. |
| 33 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 34 | Laying & sagging of LT ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. Al. cable for giving connection to Street Light and including disconnection & reconnection of consumer cables, nuts&bolts off size by the contractor. |
| 35 | Dismentling & Carriage of Old Line including Pole |
| 36 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r Hkwfexe Lis;j dscy dks fcNkus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 37 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 38 | 3x185 mm2 XLPE 11 KV |
| 39 | PCC 8.5 Mtr. Long |
| 40 | 11 KV Dropper Channel |
| 41 | 11 KV Top Channel |
| 42 | 11 KV Pin Insulator |
| 43 | 11 KV pin with net |
| 44 | Stay Complete |
| 45 | Earthing Complete |
| 46 | Supply of following material/fitting complete in all respect :- |
| 47 | Cable jointing kit 11 KV XLPE 3X185 sq mm |
| 48 | Cable Route Marker |
| 49 | Holding clamps for top, dropper, t-off etc |
| 50 | G.I Nuts & Bolts off size |
| 51 | G.I Pipe dia |
| 52 | The excavation of 2 foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC double Pole with fixing of necessary clamps & accessories as per required. All required materials such as Top, Dropper Channel, Holding clamp/PCC clamp, insulator, GI Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. |
| 53 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 54 | Laying of 11 KV XLPE Cable by HDD method as per RESPO Norms |
| 55 | Erection of Stay Complete as per RESSPO Norms |
| 56 | making loop & hoisting of 11 KV XLPE Cable on double pole/existing single pole using GI Pipe as per norms |
| 57 | Erection of route marker complete in all respect including excavation, foundation, fixing, painting and marking as per approved specifications |
| 58 | Erection of 11 KV jointing kit |
| 59 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ttZj ,y0Vh0 iksy cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 60 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 61 | ST Pole 9 mtr Long |
| 62 | Earthing complete |
| 63 | Supply of following material/fitting complete in all respect :- |
| 64 | GI Nuts & bolts of different sizes |
| 65 | LT pole Clamp with nuts & bolts |
| 66 | Suspension Clamp with I hook (Insulated) |
| 67 | Dead end Clamp with I hook (Insulated) |
| 68 | The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of ST Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/ST/LT clamp, F-Bracket, insulator, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). including disconnection & reconnection of consumer cables & resagging of conductors wherever required.In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. |
| 69 | Painting of ST Poles with materials |
| 70 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 71 | Dismentling & Carriage of Old Line including Pole |
| 72 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ttZj ,p0Vh0 iksy cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 73 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 74 | PCC Pole 11 M Long |
| 75 | Earthing Complete |
| 76 | 11 KV Pin insulator with Fitting |
| 77 | 11 KV V cross arm |
| 78 | Extra for stays at angle Location (Stay rod 16x1800mm, Stay wire 5 kg, stay clamp, bolts & nut) |
| 79 | Supply of following material/fitting complete in all respect :- |
| 80 | Danger board Barbed wire including jumper |
| 81 | GI Barbed Wire |
| 82 | F Bracket |
| 83 | Holding Clamp for V Cross Arm |
| 84 | GI Nut & Bolts |
| 85 | The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/PCC/LT clamp, F-Bracket, insulator, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). including resagging of conductors wherever required.All work will be done as per RESPO norms & relevent IS Specification. |
| 86 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 87 | Erection of Stay Complete as per RESPO Norms |
| 88 | Erection of Danger Board wire including jumper |
| 89 | Dismentling & Carriage of Old Line including Pole |
| 90 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r Mcy iksy LFkkiuk ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 91 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 92 | ST Pole 9 Mtr long |
| 93 | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 94 | MS Top channel (125x65x2240mm) |
| 95 | 11 KV TPMO |
| 96 | 11 KV Fuse Set |
| 97 | Earthing of pole by MS earthing rod of 20x2500mm |
| 98 | Supply of following material/fitting complete in all respect :- |
| 99 | Red oxide paint |
| 100 | Aluminium paint |
| 101 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 102 | G.I Nuts & Bolts off size |
| 103 | Danger baord Barbed wire including jumper |
| 104 | The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification. |
| 105 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 106 | Erection of Danger Board wire including jumper |
| 107 | Erection of TPMO & Fuse set |
| 108 | Painting of ST Poles |
| 109 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r cSVªjh ,oa pktZj yxkus ds dk;Z dks djkus gsrq dk;Z dk fooj.k |
| 110 | Supply, installation, testing and commissioning of suitable 24 Volt Battery Charger along with Battery Set comprising 12 Nos. × 2 Volt, 200 Ah batteries, complete with all required accessories, inter-cell connectors, terminals, battery stand/rack, cable connections, earthing, nuts & bolts and allied works, complete in all respects as per approved specifications, RESPO norms, relevant IS Standards and directions of Engineer-in-Charge. |
| 111 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r jcj eSV yxkus ds dk;Z dk fooj.k |
| 112 | Providing and laying ISI marked 11 kV grade electrical insulating rubber mat conforming to IS 15652 of approved make in control room/panel area complete in all respect |
| 113 | fo|qr uxjh; forj.k [k.M&jkIrhuxj] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r 11 ds0oh0 ¶;wt lsV ds gsrq dk;Z dk fooj.k |
| 114 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 115 | 11 KV Fuse Set |
| 116 | Supply of following material/fitting complete in all respect :- |
| 117 | Insulated drop down conductor |
| 118 | G.I Nuts & Bolts off size |
| 119 | Erection of 11 kV Fuse Set and installation of insulated drop-down conductor complete with all accessories and necessary connections as per RESPO norms & relevant IS Specifications. Please Enable Macros to View BoQ information |