|
| 1 | Part- A SupplyLOOP GUARD COMPLETE 3 PHASE |
| 2 | BOLT NUT AND WASHER ALL SIZE/ALL TYPE OF CLAMP |
| 3 | DEAD END CLAMP |
| 4 | J HOOK |
| 5 | EYE HOOK |
| 6 | SUSPENSION CLAMP |
| 7 | 3 PHASE DISTIBUTION BOX |
| 8 | 3 PHASE DISTIBUTION BOX CLAMP |
| 9 | SINGLE PHASE DISTRIBUTION BOX |
| 10 | SINGLE PHASE DISTRIBUTION BOX CLAMP |
| 11 | LT CABLE FOR DISTRIBUTION BOX CONNECTION |
| 12 | ABC PIERCING CONNECTOR |
| 13 | LT SHACKLE INSULATOR FOR NEUTRAL WIRE |
| 14 | LT CLAMP FOR SHACKLE INSULATOR |
| 15 | BOLT And NUT FOR SHACKLE INSULATOR |
| 16 | T OFF CHANNEL WITH CLAMP |
| 17 | HDPE PIPE 120 SQ MM |
| 18 | GUARDING X ARM HOLDING CLAMP |
| 19 | HENLEY TYPE TAILLESS UNIT PROTECTION CUBICAL PANEL 500A 650 V FOR 250 KVA DT |
| 20 | ALLUMINIUM LUG FOR 25/63/100/250 KVA DT TF |
| 21 | LT FUSE SET PROTECTION UNIT WITH SMC BOX FOR 25/63/100 KVA DT WITH NUT AND BOLT CLAMP |
| 22 | CROSS ARM HOLDING CLAMP |
| 23 | DANGER BOARD WITH CLAMP |
| 24 | NUMBER PLATE WITH CLAMP |
| 25 | STONE PAD |
| 26 | BARBED WIRE GI |
| 27 | PG CLAMP |
| 28 | F BRACKET |
| 29 | Part- B CarrigeLOADING UNLOADING AND CARRIAGE OF LINE ITEM FROM PADRAUNA STORE TO SITE 0-50 KM WITH SAFETY (i) PCC POLE 8.5 M LONG |
| 30 | PCC POLE 11 M LONG |
| 31 | STP 11 M LONG |
| 32 | LT ABC CABLE 3*50/3*95/3*120 SQMM |
| 33 | ACSR WEASEL /DOG CONDUCTOR |
| 34 | LT XLPE CABLE 3.5*70/3.5*240/3*400/1*400 SQMM |
| 35 | 3*70 SQMM /3*120/3*185 SQMM 11 KV XLPE CABLE |
| 36 | Part-C WorkERECTION OF SINGLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 37 | ERECTION OF SINGLE PCC POLE 11 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 38 | ERECTION OF DOUBLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 39 | ERECTION OF SINGLE STP POLE 11 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 40 | STAY COMPLETE AS PER STANDARD RESPO |
| 41 | DISMANTLING AND SUBMIT OF OLD AND USED WEASEL CONDUCTOR TO PADRAUNA STORE |
| 42 | CONSTRUCTION OF 3PHASE 3WIRE LINE |
| 43 | ERECTION OF ABC CABLE 3*50/3*90/3*120 SQMM |
| 44 | CONCRETING OF A,B AND C BOX |
| 45 | MAINTENANCE OF A,B AND C BOX WITH COMPONENT |
| 46 | LAYING OF LT XLPE CABLE 3.5*70/3.5*240/3*400 SQMM |
| 47 | GUARDING OF LINE (33KV/11 KV) |
| 48 | LAYING OF HDPE PIPE (UPTO 140 MM DIA ) UNDERGROUND BY DIGGING OF TRENCH BY EXCAVATION OF EARTH RAMMING (.8*1.20MTR) AND DRESSING PROPERLY WITH COMPLETE JOB ALONG WITH LAYING TESTING AND COMMISSIONG OF LT XLPE CABLE SUITABLE SIZE (UPTO 120 SQMM ) IN HDPE PIPES/ HDD METHOD . |
| 49 | CARRIAGE OF 250 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 250 KVA DT WITH ALL FITTING INCLUDING CHEMICAL EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND TAILLESS UNIT AND THEN RETURNING BACK OLD 100 KVA DT TO PADRAUNA STORE. |
| 50 | PLINTH FOR 250 KVA DT OF SIZE 2*2*1.5 M AND ITS FENCING. |
| 51 | CARRIAGE OF 25 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 25 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 16/10 KVA DT TO PADRAUNA STORE. |
| 52 | CARRIAGE OF 63 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 63 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 25 KVA DT TO PADRAUNA STORE. |
| 53 | CARRIAGE OF 100 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 100 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 63 KVA DT TO PADRAUNA STORE. |
| 54 | DISMANTLING OF OLD AND USED ABC CABLE AND RETURN BACK TO PADRAUNA SORE |
| 55 | LAYING OF CABLE 3*70/3*120/3*185 SQ MM 11 KV WITH HDD METHOD ALONG WITH HDPE PIPE |
| 56 | CARRIAGE OF 25 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 25 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 57 | CARRIAGE OF 63 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 63 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 58 | CARRIAGE OF 100 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 100 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 59 | CARRIAGE OF 250 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 250 KVA DT WITH ALL FITTING INCLUDING CHEMICAL EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT TAILLESS PROTECTION UNIT . |
| 60 | HANGING OF CABLE |
| 61 | TREE CUTTING Please Enable Macros to View BoQ information |