| 1 | Site clearance by cutting and removing the grass, bushes, all obstructions etc., from the top surface and disposal of the same as and when directed by the Engineer. |
| 2 | Removal of old P & S bank protection and existing paver block laid footpath and existing drainages, kadavu etc., including stacking of reusable materials like garden chairs, lam posts etc. within 500 m to the proposed site and disposal of unserviceable materials away from the site, without throw into canal as per directions of E - I -C. The rate shall include cost of hiring of machineries and plants, transportation of serviceable materials like pile, slab, anchor rod (if any) and labour charges etc. complete. |
| 3 | Earth work in cutting river bank in all types of soil in required profile and removing the roots, grass and shrubs and disposal of the excavated material at suitable places as directed by Engineer, including all lifts and leads. |
| 4 | Earth work in filling in required profile in selected soil obtained from the approved borrow pit or any other source, free from logs, stumps, roots rubbish, etc. and placing the earth in layers not exceeding 225mm in thickness levelling dressing watering, ramming and consolidating by approved means to the required profile under the direction of the Engineer, including all leads & lifts etc., complete. |
| 5 | Supply and making of concrete square piles of approved quality of size 300mm x 300mm of required length including all fittings and fixtures etc. as shown in drawing for driving at site, etc. all complete as per approved designed and direction of Engineer except cost of reinforcement & form work. |
| 6 | Providing, hoisting and fixing pre-cast reinforced cement concrete slabs (first lower slab, then middle finally the top slab and anchor slab). Complete including temporary shuttering for placing in position etc., all complete except cost of reinforcement & form work. |
| 7 | Reinforcement for pre-cast concrete work including straightening, cutting, bending, placing in position and binding all complete HYSD bars. |
| 8 | Centering & Shuttering for casting of pre-cast piles & slabs including strutting, proping and removal of formwork |
| 9 | Provide and bring to the site necessary plant equipment for driving 300mm x 300mm square pre-cast vertical piles in position to complete the work within the time schedule. |
| 10 | Extra for driving of pre-cast pile of size 300 x 300 mm at the location as certified by EIC including all labour with already mobilised equipment |
| 11 | Extra for shifting of pile driving equipment from one pile location to other |
| 12 | Supplying and fixing steel plates of size 100 x 100 x 8 mm to be fixed at each pile location for support of Anchor as per directions of E-I-C. The rate shall include cost of steel plates, cutting into required size, welding and fixing of steel plate into one side of anchor rod, transportation, applying of one coat of metallic primer and two coats of black bituminous paint etc., complete. |
| 13 | Extra for providing and fixing 32mm dia Anchor rod for length 3.0 m as shown in drawing including cost of materials like washers, nuts etc., threading of rod upto a length of 20cm, applying of one coat of metallic primer and two coats of black bituminous paint and all labour etc. complete. |
| 14 | Supply and placing in position in geo-textile as per specification or equivalent filter behind vertical slabs and piles or below revetment as per the approved specification and drawings and any other place as directed by the Engineer including over lapping sticking, stretching with all lead and lift labour, T & P floating crafts, divers, etc. complete. |
| 15 | Procuring and applying of black bituminous paint to the piles before driving above the bed level as directed by the Engineer, including cost of all material labour etc. complete. |
| 16 | Procuring and applying of black bituminous paint to the slabs before placing in positional as directed by the Engineer, including cost of all material, labour etc. complete. |
| 17 | Scour protection by placing of PVC Coated wire Gabions of size 1.60 x 1.00 x 0.75 filled with granite stones of 15 to 30 kg in front of Pile & slab protection including all tools & plants labour etc., complete. |
| 18 | Providing and laying in position cement concrete of grade 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate - 20mm nominal size) for capping beam and retaining walls & top slabs for drainage & Kadavu 150mm thick as directed by Engineer, including cost of materials, labour, Tools & Plants except cot of reinforcement & formwork etc., complete. |
| 19 | Providing of RR masonry in 1:6 for wing wall / side protection of drainages and kadavu as per directions of E-I-C including cost of all materials, transportation to site, labour charges etc., complete. |
| 20 | Laying, spreading and compacting stone aggregate of 90 mm to 45 mm & 53 mm to 22.4 mm to WBM to be laid in two layers in uniform thickness of 10cm, hand packing, laying of binding material, watering in each layers, consolidation with light power road-roller in stages to proper grade and camber without causing any damage to new P&S bank protection, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. The rate shall include cost of all materials, transportation, labour charges for spreading and laying WBM in seperate two layers of 10cm each etc., complete |
| 21 | Restoration of bank, existing paved footpath etc. by providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction of approved size, design & shape, laid in required colour and pattern including 100mm thick compacted levelled bed of 6mm stone chips, filling the joints with fine sand etc. shall be executed as per the direction of Engineer- in -charge |
| 22 | Restoration of things like chairs, posts etc., (if reusable) to its original locations and overall cleaning of the work site to ensure safety of people using adjacent road. Please Enable Macros to View BoQ information |