| 1 | Earthwork in Excavation. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m complete in all respects and to the entire satisfaction of Engineer in charge. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal sizederived from natural sources) |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 5 | PREPARATION OF SUBGRADE AT CUTTING PORTION. Preparation and consolidation of sub grade after loosening of the ground upto a level of 300 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction complete in all respect in all respects and to the entire satisfaction of the Engineer in charge. |
| 6 | Providing, laying, spreading and compacting granular sub base material 150 mm thick compacted of natural sand, morrum, gravel crushed stone or combination thereof as per MORT&H specification confirming to clause 401 coarse graded grading – I as per table 400.2 of MORT&H specification, including spreading on the prepared sub grade with the help of tractor with planner of adequate capacity maintaining the requited slope and grade during operation, rolling with road roller 8-10 tone with the grade and cross fall (camber) to be checked and any high spot or depressing which becomes apparent, corrected by removing or adding fresh material, including cost of tools and plants, carriage of material from stacks, templates, barrier, lighting arrangement at night, chowkidar and maintenance of diversion etc. complete in all respect as per MORT&H specifications, density of GSB as laid 2 gms/cc complete in all respect and to the entire satisfaction of Engineer in charge. |
| 7 | WET MIX MACADAM : Construction of 100mm thick compacted Wet Mix Macadam to confirming to clause 406 of MORT&H (Ministry of road transport and highway)specification (4th edition) having as laid, density of 2.2gm/c.c (Two point Two gram per cubic centimeter) by providing laying, spreading and compacting clean, crushed aggregate and granular material conforming to Table 400.10(Physical characteristics) Table 400.11 (grading) of MORT&H (Ministry of road transport and highway)specifications (4th edition). The material shall be premixed with water at OMC in Mixing Plant/Pan type mixer/Pug Mill and mixed material carried to site by tippers and spread uniformly and evenly on the prepared sub base/base by paver finisher of adequate capacity and all high and low spots remedied by removing or adding aggregate, as required and rolled with 8-10 (Eight to ten tones) tones roller to achieved/desired density. It shall included the cost of tools and plants, carriage of material from stacks, templates, barriers, safety temporary warning lamps at night, chowkidar, maintenance of diversion etc. Complete in all respects as per MORT&H (Ministry of road transport and highway) specification and to the entire satisfaction of the Engineer-in-charge. |
| 8 | Dense Graded Bituminous Macadam: Providing and laying 50mm thick dense graded bituminous macadam with mechanical paver after mixing aggregate and bitumen as per design mix in hot mix plant using minimum @ 4.5% bitumen of grade VG-30 of total mix with aggregate confirming to requirement laid in table 500.8 and as per grading II specified in table 500.10 complete as per clause no. 507 of MORT&H specification rolling with smooth wheeled vibratory and tandem roller as per clause 501.6 and 501.7 to achieve the desired density 2.3gm/cc. complete in all respect and to the entire satisfaction of the Engineer-in-charge. |
| 9 | Providing and laying 30mm thick bituminous concrete as per clause 507 of MORT&H specification with mechanical paver after mixing aggregate and bitumen as per design mix in Hot mix plant using minimum 5.4% bitumen of grade VG- 30 and using both coarse and fine aggregate filler stone dust @2% by weight of aggregate confirming to relevant specification laid in MORT&H specification clause 507.2.2 and 507.2.3 with grading confirming to table 500.17 gradation –II of MORT&H specification and density of bituminous concrete as laid 2.35 gm/cc complete in all respect as per MORT&H specification and to entire satisfaction of Engineer-in-charge. |
| 10 | PRIME COAT : Providing and applying primer coat with bitumen emulsion (Rapid Setting, packed) on prepared surface including cleaning of road surface and spraying bitumen at the rate of minimum 6 Kg./10sqm with bitumen pressure sprayer complete in all respects as per clause 502 of MORT&H specification ( 4th edition) complete in all respect in all respects and to the entire satisfaction of the Engineer in charge. |
| 11 | TACK COAT : Providing and laying tack coat with bitumen VG-10 @ 3.0 kg/10 sqm using sprayer pump on prepared surface heating bitumen in boiler and spraying bitumen with spray set fitted on bitumen boiler including cleaning of road surface with complete in all respect as per MORT&H specification and to the entire satisfaction of the Engineer-in-charge. |
| 12 | Providing and laying Tack Coat with bitumen VG-10 using sprayer @ 2.5kg/10 sqm on prepared bituminous surface, heating bitumen in boiler and spraying the bitumen with spray set fitted on bitumen boiler including cleaned of road surface with narial broom complete in all respect as per clause-503 of MORT&H (5th revision) specification clause-503 & to the entire satisfaction of engineer in charge. |
| 13 | Providing and fixing 60 mm thick ISI approved high density rubber moulded precast cement concrete paver blocks grey / coloured designer, polished, manufactured by vibro hydraulic pressure process under layer consisting of design mix of cement, sand and fine aggregate having designation M-35 including best quality of colour and hardening agent. The pavers should be complied with tensile strength and breaking load as per BIS 6717-1993 and shall be tested against resistance to wear as per IS:1237-1980. The paver should be laid over a layer of 25 mm thick screened coarse sand to the required slope and filling the joints with fine sand etc. complete in all respect and to the entire satisfaction of Engineer-in-charge |
| 14 | Supplying & Fixing of FIH approved global category synthetic hockey turf from FIH prefeered producer/ supplier and laid by FIH certified field builder and jointing and fixing the same on the bituminous sub grade with minimum 15 mm thick rubberized under layer as per the FIH requirements and the pasting of synthetic grass as per specification of the global category FIH competition including all marking on the surface as per FIH rules and standard etc. complete as per the instructions of the Engineer-in- charge. |
| 15 | Supplying and fixing of hockey goal post aluminium of FIH approved drawing and design including all fitting and net. Complete as per the instructions of the Engineer-in- charge. |
| 16 | Haulage of material / earth by tipper exculding the cost of loading, unloading and stacking with lead of 5.0 Km complete in alll respect as per satisfication of Engineer-in-Charge. |
| 17 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade of required color. |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :one or more coats on old work |
| 19 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 20 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Please Enable Macros to View BoQ information |