Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Construction of 20LL OHSR at Jala Bhavan Compound- Cantonment Zone |
| 2 | OD269673/2025-2026:Design and Field Survey works including Layouting, Architectural and Structural drawings, Detailed Structural Design, Material Quality testing (initial and periodical). Preparation of Structural Plans, Elevation and Sections, Soil Testing For foundation design, Tank Floor height and Water depth calculation based on existing pumping and pipeline amenities by using EPA-Net software through an accredited agency and duly signed by a Licensed and Registered Engineer/ Architect. |
| 3 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 4 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth |
| 5 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth |
| 6 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth |
| 7 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth |
| 8 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar |
| 9 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
| 10 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 11 | 15.40.1:Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness upto 40 mm |
| 12 | OD285992/2025-2026:Dismantling of parking shed & stacking of serviceable materials as per the direction of Engineer in charge. |
| 13 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 14 | OD304040/2025-2026:Stone compaction piles of 100 mm diameter, constructed using 6 mm aggregate and sand in ratio 3:2, shall be provided at 450 mm centre-to-centre spacing upto a depth of 4.50 m (measured from the ground level indicated in the bore log ) to improve the fine sand layer near the surface. Including transporation of materials, labours and rate for Bottom Cone . |
| 15 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 16 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 17 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 18 | 16.78.2:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 |
| 19 | 2.16.2:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m |
| 20 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m |
| 21 | 5.33.1.2:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work upto plinth levelConcrete of M30 grade with minimum cement content of 350 kg /cum |
| 22 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 23 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) |
| 24 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 25 | 5.33.2.2:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work above plinth level upto floor V levelConcrete of M30 grade with minimum cement content of 350 kg /cum |
| 26 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 27 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 28 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers |
| 29 | 5.9.20:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform with water proof ply 12 mm thick |
| 30 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 31 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) |
| 32 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide |
| 33 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 34 | 5.11.1:Extra additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) |
| 35 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 36 | OD299875/2025-2026:250 mm dia Ductile Iron Double Flanged - Wall Casting |
| 37 | OD276886/2025-2026:300 mm dia Ductile Iron Double Flanged- Wall Casting pipe |
| 38 | OD276990/2025-2026:350 mm dia Ductile Iron Double Flanged - Wall Casting |
| 39 | OD277071/2025-2026:400 mm dia Ductile Iron Double Flanged- wall casting |
| 40 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 41 | 50.6.1.6:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level thickness 20cm and above in : CM 1:6 ( 1 cement : 6 coarse sand sand) etc complete |
| 42 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For horizontal surface one coat @1.10 kg per sqm. |
| 43 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For vertical surface two coats @0.70 kg per sqm |
| 44 | 13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster |
| 45 | 13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster |
| 46 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) |
| 47 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 48 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 49 | 13.71:Lettering with black Japan pint of approved brand and manufacture |
| 50 | 10.26.1:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.M.S. tube |
| 51 | 100.36.1:Filling water with 5000 litre tankers fited in lorry and conveying water from a distance of 5 km (average) to the reservoir site and pumping the water into the reservoir of height not less than 3 m using 5 HP diesel engine pump set , hire for tanker lorry, tools and other appliences and cost of water etc. complete. |
| 52 | OD20554/2026-2027:Providing ventilating arrangement to the tank over the roof slab using 100mm GI medium pipe,-0.5m, 100mm GI Tee-1Nos,100mm GI 90 degree bend-2Nos of both end of the Tee and closing the end of the bend with perforated GI sheet welded to the bond, GI spray on the welded portion and painting with black japan paint /syntactic enamel paint two coat over priming coat etc complete and fixing the same in position etc |
| 53 | OD270224/2025-2026:Providing and Fixing 800mm*800mm FRP Square Manhole cover with Frame |
| 54 | OD269604/2025-2026:Supply and providing imported vertical air terminal with 12 needled nickal coated spike receiver, supporting rod and stand including all accessories as required with possitive receiver (45m receiving capacity), Supply and laying 25x3mm required length of GI strip through eppoxy resign cast support, Down conductor through wall vertical run/through parapet, Supply and installation of test joint box fabricated out of 16 SWG CRCA sheet, Sipply and laying of 32x6mm GI strip through ground including earth work excavation backfilling and jointing etc complete and providing 2nos of pipe earthing. |
| 55 | OD20460/2026-2027:Providing water level indicator assemblying by using 2mm thick MS plate with in the frame work of suitable size MS square tube, 160mm PVC 8kg/cm2 pipe,200mm float, pully, nylon rope, plumpbob with indiactor lamp, MS board(30cm width) with sufficient depth to show the zero water level and full depth to show the zero water level and full water level , painting 10cm divisions(graduation in metric system), lettering etc including cost for clamps, drilling of RCC slabs etc. complete. |
| 56 | OD270669/2025-2026:Supplying and Installation of DI D/F Butterfly Valves with GGG 40 or GGG 50 as per IS3896 (Part 2)1985 and subsequent revisions Double eccentrically disc with renewable soft seal on the discand body seat face of Stainless Steel / nickel weld overlay micro finished with powder or liquidEpoxy coating with minimum thickness of 250 microns applied on both body and disc inside andoutside Face to Face dimensions as per AWWA C 504 or BS 5155 or IS 13095 a Automated With electrical Actuator operated 230V AC Single Phase ON/OFF type with manual override LNKEY type -Size 250 mm -cost including automation and fixing |
| 57 | OD270671/2025-2026:Supplying and Installation of DI D/F Butterfly Valves with GGG 40 or GGG 50 as per IS3896 (Part 2)1985 and subsequent revisions Double eccentrically disc with renewable soft seal on the discand body seat face of Stainless Steel / nickel weld overlay micro finished with powder or liquidEpoxy coating with minimum thickness of 250 microns applied on both body and disc inside andoutside Face to Face dimensions as per AWWA C 504 or BS 5155 or IS 13095 a Automated With electrical Actuator operated 230V AC Single Phase ON/OFF type with manual override LNKEY type -Size 300 mm -cost including automation and fixing |
| 58 | OD270670/2025-2026:Supplying and Installation of DI D/F Butterfly Valves with GGG 40 or GGG 50 as per IS3896 (Part 2)1985 and subsequent revisions Double eccentrically disc with renewable soft seal on the discand body seat face of Stainless Steel / nickel weld overlay micro finished with powder or liquidEpoxy coating with minimum thickness of 250 microns applied on both body and disc inside andoutside Face to Face dimensions as per AWWA C 504 or BS 5155 or IS 13095 a Automated With electrical Actuator operated 230V AC Single Phase ON/OFF type with manual override LNKEY type -Size 400 mm -cost including automation and fixing |
| 59 | 18.73.4:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :250 mm dia Ductile Iron Double Flanged |
| 60 | 18.73.5:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :300 mm dia Ductile Iron Double Flanged |
| 61 | 18.73.6:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :350 mm dia Ductile Iron Double Flanged |
| 62 | 18.73.7:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :400 mm dia Ductile Iron Double Flanged |
| 63 | 18.30.6:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:250 mm diameter pipe |
| 64 | 18.30.7:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:300 mm diameter pipe |
| 65 | 18.30.8:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:350 mm diameter pipe |
| 66 | 18.30.9:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:400 mm diameter pipe |
| 67 | OD277153/2025-2026:Supplying a 400mm mechanical flow meter of Woltman Type conforming to ISO4064 Class B of ABAD/ ZENNER/ REYCHEM RPG/ ITRON make and the flow meter shall be tested and certified by FCRI- Palakkad as per order no. KWA/HO/SP-4014/2012/flow meter& soft starter dated 05/05/2012. |
| 68 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 69 | 18.69.1:Providing and laying D.I Specials of Class K - 12 suitable for mechanical jointing as per IS : 9523 :Upto 600 mm dia |
| 70 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 71 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 72 | OD280776/2025-2026: Solar-powered, 4G/5G LTE based, ultrasonic echo-based real time water levels monitoring and alerting system. Ultrasonic echo-based non-contact water level sensing at centimeter accuracy. Supports tanks upto 6m deep. Lower level and upper-level configurable thresholds over web app, and mobile app. Lower and upper-level threshold crossing alerts over web app, and mobile app. Solar-powered with in-built 3.3Ah Li-FeSO4 battery. In-app tank water level trend graphs and analytics. Can be paired with pumps at any distance from the tank over internet for automatic pumping based on remotely configurable tank water level thresholds. Additional weather-proofing enclosure included. Standard on-site warranty: 2 years |
| 73 | OD287775/2025-2026:Supplying of 900 mm dia SCADA (auto) Operated DI D/F Diaphragm type own medium controlled PressureReducing valve with cast body of ductile iron grade GGG-40 or GGG-50 or as per IS 3896-Part2-1985 customized control cylinder for linear control behaviour or equivalent, performed diaphragm and pull out safe profile sealing ring of EPDM, threaded inserts (CORFIX - to preventthe coating from coming off in the connections area as well as corrosion and incrustations inthe control circuit) or equivalent. 2 pressure gauges for operator-friendly control to determinethe actual inlet and outlet pressure connected directly to the valve. Flange connection dimensions according to EN 1092, Part 2/ ISO 7005[DIN]/ IS 1538, all parts (Epoxy coating, anddiaphragm) in contact with medium are as per KTW and DVGW certified (harmless)/WRAS &NSF approved. The EPDM rubber & Epoxy coating (EP-P) should be approved by W270.(EP-P)/WRAS & NSF.?Pilot valve system having Stainless Steel / Brass fittings with spring of SS 304 as per standardparts according to DIN EN 12 266-1 with all the external control tubing of SS 304 / Copper/reinforced plastic rated PN16, Tightness to DIN EN 12 266-1, leakage rate A (or) equivalent andthe needle valve/ speed control device should be provided to vary opening speed of the maindiaphragm with self-cleaning filter to avoid possibility of dirt build up inside the control tubing with an Operational Guarantee of minimum 2 years from the Date of Commissioning. |
| 74 | OD287776/2025-2026:Supplying of 500 mm dia SCADA (auto) Operated DI D/F Diaphragm type own medium controlled PressureReducing valve with cast body of ductile iron grade GGG-40 or GGG-50 or as per IS 3896-Part2-1985 customized control cylinder for linear control behaviour or equivalent, performed diaphragm and pull out safe profile sealing ring of EPDM, threaded inserts (CORFIX - to preventthe coating from coming off in the connections area as well as corrosion and incrustations inthe control circuit) or equivalent. 2 pressure gauges for operator-friendly control to determinethe actual inlet and outlet pressure connected directly to the valve. Flange connection dimensions according to EN 1092, Part 2/ ISO 7005[DIN]/ IS 1538, all parts (Epoxy coating, anddiaphragm) in contact with medium are as per KTW and DVGW certified (harmless)/WRAS &NSF approved. The EPDM rubber & Epoxy coating (EP-P) should be approved by W270.(EP-P)/WRAS & NSF.?Pilot valve system having Stainless Steel / Brass fittings with spring of SS 304 as per standardparts according to DIN EN 12 266-1 with all the external control tubing of SS 304 / Copper/reinforced plastic rated PN16, Tightness to DIN EN 12 266-1, leakage rate A (or) equivalent andthe needle valve/ speed control device should be provided to vary opening speed of the maindiaphragm with self-cleaning filter to avoid possibility of dirt build up inside the control tubing with an Operational Guarantee of minimum 2 years from the Date of Commissioning. |
| 75 | 100.31.2.16:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 900mm diameter, Class II. |
| 76 | 100.31.2.11:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 500mm diameter, Class II. |
| 77 | OD304035/2025-2026:Supplying, Conveying and Fixing of DI Dismantling Joints PN-16 - 500mm Dia |
| 78 | OD304036/2025-2026:Supplying, Conveying and Fixing of DI Dismantling Joints PN-16 - 300mm Dia |
| 79 | OD304037/2025-2026:Supplying, Conveying and Fixing of DI Dismantling Joints PN-16 - 400mm Dia |
| 80 | OD304038/2025-2026:Supplying, Conveying and Fixing of DI Dismantling Joint PN-16 of 900mm Dia |
| 81 | OD304039/2025-2026:Supplying, Conveying and Fixing of DI Dismantling Joint PN-16 of 250mm Dia |
| 82 | OD276374/2025-2026:Supply installation All type of testing, trial run and commissioning of solar on grid plant with advanced Mono Perc Half Cut Solar panels, Structures to mount panels, DC cables and connectors DC junction Box, Inverters . AC junction BoxLink,,solar meter with Box, AC cables, Link/CB, TPN Box, Net Meter with approval of KSEB approval and all other electrical and mechanical accessories complete as per the direction of departmental officers and in accordance with Inspectorate standards. All paperwork, statutory fees and allied works with the Electrical inspectorate and KSEB Limited for the approval and to be got approved by Electrical Inspectorate and KSEB Limited |
| 83 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 |
| 84 | 16.91.2:Providing and laying factory made chamfered edge Cement Concrete paver blocksin footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,thickness & size/ shape, made by table vibratory method using PU mould, laid inrequired colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layerthrough vibratory compaction by using plate vibrator, filling the joints with sand andcutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. |
| 85 | Constructing Valve Chambers |
| 86 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 87 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 88 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 89 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 90 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 91 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 92 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 93 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 94 | OD318230/2025-2026:Providing and Fixing CI Heavy duty square Manhole covers of 900x900 mm size with CI frame and locking arrangement. |
| 95 | Constructing Boundary Wall |
| 96 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 97 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) |
| 98 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 99 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 100 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 101 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 102 | 4.2.2:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources |
| 103 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 104 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers |
| 105 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 106 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges |
| 107 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 108 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 109 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing |
| 110 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 111 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 112 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 113 | 13.71:Lettering with black Japan pint of approved brand and manufacture Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
| 9 | Click here to download tender document | Tender Documents |
| 10 | Click here to download tender document | Tender Documents |
| 11 | Click here to download tender document | Tender Documents |
| 12 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail