| 1 | Beldar |
| 2 | Carriage of Material Building Rubbish Stone metal (Grit and ballast etc.) including loading and unloading with all lead |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil |
| 4 | Grading roof for water proofing treatment with water proffing compound Cement concretee 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Providing gola 75x75 mm in cement concretee 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : |
| 6 | Providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg of VG-40 (30/40 )grade and 0.30 Kg/Sqm. Of VG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. |
| 7 | Kota stone slab flooring 25 mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) For area of each slab from 2001 to 5000 Sq.Cm |
| 8 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick. |
| 9 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand) |
| 10 | Demolishing cement concretee manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. |
| 11 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membran @ 0.40 Itr/sq.mt. by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D-5147. The laying of membrane shall be got done through the authorized applicator of the manufacturer of membrane.3 mm thick |
| 12 | Providing and Applying ACRYLIC emulsion polymer waterproofing chemical coating, on over roof on over roof slabs/terrace/balconies/parapet wall etc.with following method/specification:Paint the surface with regular paint brush so as to obtain approximately 0.3mm thickness coating. apply the 2nd coat next day at right angles to the 1st coat so that total thickness of the coating should be approximately 0.6mm coverage by using above formulation will be 40 ft2/ litre of chemical. painted surface does not require any external water curing since chemical will hold sufficient water for curing.After the primer coat Apply 2 coats of modified acrylic emulsion polymer water proofing compound having solar heat reduction properties coating @ 0.330 KG/SQM on the surface of the interval of 3-4 hours. Undulation on the surface is repair before the waterproofing work. |
| 13 | Providing and Fixing Chiken wire mesh at the joint of masonry members/ R.C.C. Members with Nails complete in all respect. |
| 14 | Providing and laying in position cement concretee including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 15 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 16 | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 Cement mortar 1 : 4 (1 cement : 4 coarse sand) Please Enable Macros to View BoQ information |