|
| 1 | S/s Decentralised Items without GST |
| 2 | Armored Control Cable 4x2.5 mm² |
| 3 | Armored Control Cable 2x2.5 mm² |
| 4 | Rubber Mat |
| 5 | Alluminium P.G. Clamp for Dog |
| 6 | 24Volt (2x12V)Battery 200Ah 60Month Warranty &24Volt Invertor 2550VA Set With Stand/Trolley |
| 7 | 5MVA T/F HV/LV Bushing Connector |
| 8 | 11 kv pole mounted TPMO |
| 9 | 11 KV fuse set pole mounted |
| 10 | LT cable Alu 3.5* 70 sqmm |
| 11 | L Type Structure for Neutral Stand |
| 12 | 33 kv line Decentralised Items without GST |
| 13 | LVs ywi balqysVj For 33KV |
| 14 | dzkl vkeZ gksfYMax DySEi With uV ,oa cksYV |
| 15 | ckjcsM ok;j GI |
| 16 | MsUtj cksMZ DySEi lfgr |
| 17 | uV ,oa cksYV All Size |
| 18 | ih0th0 DySEi |
| 19 | LVs DySEi |
| 20 | ^bZ&czSdsV^ |
| 21 | pSuy ,Q0 czsfdV |
| 22 | ,ywfefu;e iSUV |
| 23 | jSM vkfDlkbM iSUV |
| 24 | gksfYMax DySEi Vki pSuy |
| 25 | gksfYMax DySEi xkfMZax ,afxy |
| 26 | ,Q0 czsfdV |
| 27 | Dropper angle clamp |
| 28 | MS Channel clamp |
| 29 | czsflax DySai |
| 30 | 11KV LINE Decentralised Items without GST |
| 31 | ,e0,l0 dzkl vkeZ gksfYMax DySEi |
| 32 | th0vkb0 ckjcsM ok;j |
| 33 | MsUtj cksMZ DySEi lfgr |
| 34 | uV ,oa cksYV |
| 35 | ih0th0 DySEi |
| 36 | ,e0,l0 LVs DySEi |
| 37 | ,e0,l0 ^bZ&czSdsV^ ¼,e0,l0 fLVªi½ |
| 38 | F- BRACKET |
| 39 | ,e0,l0 gksfYMax DySEi Vki pSuy gsrq |
| 40 | ,e0,l0 gksfYMax DySEi xkfMZax ,afxy gsrq |
| 41 | ,e0,l0 czsflax DySEi |
| 42 | Vh0 vkQ DySEi |
| 43 | Mªkij ,afxy DySEi |
| 44 | CABLE Decentralised Items without GST |
| 45 | Cable&GI Pipe clamping clamp for over head cable laying |
| 46 | Cartage & Erection Charges of Structures,equipemnets etc complete work as per norms and requirement. |
| 47 | Grouting,muffing of SS structure(LA/POST/Fuse/Bus /CT//Main bus bar/glentry /pt(cablestand&Neutralstand ) etc |
| 48 | Construction of Plinth & foundation for 33 KV VCB structure for complete work) . |
| 49 | Making of new 5 MVA transformer plinth,including all T&P, material and labour. |
| 50 | 11KV C/J Kit Jointing charges of Diff. Size |
| 51 | Opening of gasket and filling of oil including reclamation of Full Transformer by Centrifusing machine on site including all T&P ,Material and labour incase of Old & used Tansformer received from store center in cluding general maintenance work with supply of OTI/WTI if required. |
| 52 | Air lifting of cable with 6Ench daya 1.5Mtr.Long GI pipe ,nut &bolt of suitable size With Extra Angle Erection &Fitting at DP |
| 53 | Earthing of S/S Outdoor equipement (Fabrication of Full switchyard 42x35 mtr. or as per req.Earthmat) &All Structure Connected by Welding with MS flat 25mm & Providing all T&P, Material and Labour. |
| 54 | Earthing of complete Indoor equipement(like control panel(1),11 kv vcb(i/c(1), & Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 55 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia 20 mtr length/upto water level of each pipe and 1 no.of copper cone and 8 swg copper wire as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 56 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia 20 mtr/upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with MS flat 25mm & Providing all T&P, Material and Labour. |
| 57 | Fabrication of highmask arrangement structure with 5 ST pole for fitting of 15 no. LED lights 90 watt . at top including all materials and also installation of LED highmask lights with control circuit,wires and power switches, mcb`s.The work includes pole erection , grouting, painting, plinthing etc complete work and also making climbing arrangements.( outdoor switchyard& aproach road,lighting) |
| 58 | Const of permanent trench with rcc cover/slab in switch yard as per req. |
| 59 | 11/0.4 KVA LT transformer pipe Earthing 20 ft. For Neutral |
| 60 | Installation of 63 KVA Transformer at DP With Top,Dropper,fuse set,TPMO all Fitting &Proper Connection for Energization |
| 61 | Constrruction of LT line ,Installation of LT DB in Switchgear room & Providing all T&P, Material As Required and Labour For Complete Work. |
| 62 | Construction of Control Cable Trench with cover & hanger |
| 63 | Providing & Painting of All Structures in S/S Switch Yard ,earth strip & Equipments with red oxide,Green and allumunium paints. |
| 64 | Sub-station Name & Arrow shine Board complete(2*1.5 mtr. Iron sheet with stand) |
| 65 | Furniture of S/S (8 chair wooden, 1 table wood 5*4 ft with rack, 2 bench, 2 stool,1 chowki), (1 executive chair For JE , 5 office chair ,1 Office table, 1 Computer System Table ) |
| 66 | Writing name on S/S building and all 11 KV switchgear Pannels ,T/f ,VCB ,Isolators,etc |
| 67 | T & P of S/S & Switchgears as per Specification,ISI Mark Pliers 6 no, reputed brand Meggar 5 KV-1 No, Tong Tester ,Wrench 1 set whole, Hammer 1 No, 2 No Saw, 2 no. Axe, 2 no. long Rope, 3 No. Earth chain, 2-2 No. Bamboo ladder for11Mtr &9Mtr.Pole , Ladder trolley 2 no.,safety belt 3No., pulley 2 No.,Hand Glaves 33KV 02Pair ,11Hand Glaves 4Pair,tester 04No.,Expandable Discharge earth Rod for Earthing(01no.) |
| 68 | Fire fighting equipement for switchyard 4.5 Kg. CO₂ fire extinguisher |
| 69 | Fire fighting equipement for control room 4 Kg. dry powder fire extinguisher portable type |
| 70 | Fire buckets (4 No.) with stand filled with dry sand for switchyard |
| 71 | Max./Min. line diagram |
| 72 | Installation battery and invertor with cabinet in control room along with its proper connections |
| 73 | manufacturing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 74 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project. |
| 75 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 76 | Construction of SSO's approached road 1.5 Mtr. wide in Switchyard by laying dry sand and interlocking bricks The work include proper plastering top & side of road and leveling & dressing of earth beneath the brick work on edge. |
| 77 | Grouting and plinthing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 78 | Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour. |
| 79 | Outdoor switchyard leveling/smoothening/flooring of all switchyard area with first class bricks ,sand and cement in newly constructed switchyard area installed with electrical equipments including all materials,T&P and labour etc. for Complete work. |
| 80 | 33kv Line work |
| 81 | Shifting, Loading and carriage of 344 no Pole and 36 km Dog conductor,accessories(centralised /decentralised items) from store to site. |
| 82 | Erection of poles with fitting of all acesories |
| 83 | Laying / spreading/stringing of 3 phases of ACSR dog cond. |
| 84 | pole no painting |
| 85 | concreting of poles |
| 86 | Cutting of tree branches |
| 87 | plinthing of pole |
| 88 | conreting of stay set |
| 89 | H.T connection/Disconnection |
| 90 | earthing workwith providing N&B with washer including materials |
| 91 | LT Domestic/commercial conn.cable D/C&R/C Labour Charges |
| 92 | HT/LT Pole &Line Shifting Charges for Making Suitable Space of New Line including dismentling & Re-erection Comp.Work in This Job |
| 93 | Extra work of height enhancement/Side angle of PCC pole/stp pole with help of Top channel, MS angles and clamps etc with required supply of decentralised item including all T&P, labour and works as per requirement. |
| 94 | Gaurding works |
| 95 | Drawing,Design, Documentation &aproval from Directorate Electrical Safty etc |
| 96 | Extra work charge for carraige and erection of pcc 11 mtr pole including all other essential requirement manpower / machinery /T&P to successfully complete the work |
| 97 | 11 kv line |
| 98 | Shifting, Loading and carriage of 240 No. Pole and 25 km weasel conductor, accessories(centralised /decentralised items) from store to site. |
| 99 | Erection of poles with fitting of all acesories |
| 100 | Laying / spreading/stringing of 3 phases of ACSR cond. |
| 101 | pole no painting |
| 102 | concreting of poles |
| 103 | Cutting of tree branches(due to forest area,qty approx) |
| 104 | conreting of stay set |
| 105 | H.T connection/Disconnection |
| 106 | Extra work of height enhancement of PCC pole with help of Top channel, MS angles and clamps etc with required supply of decentralised item including all T&P, labour and works as per requirement. |
| 107 | Gaurding works |
| 108 | earthing workwith providing N&B with washer including materials |
| 109 | Extra work charge for carraige and erection of pcc 11 mtr pole including all other essential requirement manpower / machinery /T&P to successfully complete the work |
| 110 | 33kv cable work |
| 111 | Shifting, Loading and carriage of 33 KV 3X300 sq mm xlpe cable& accessories(centralised /decentralised items) from store to site. |
| 112 | Laying of 3*300 mmsq 33 kv cable alomg with cost of digging ,brick & sand or help of HDD machine ,the work includes all associated labour materials ,T&P and labours etc.(LS) |
| 113 | Air lifting of cable with GI pipe(1.5M) of suitable size including materials. |
| 114 | cable jointing charges |
| 115 | S/TH Cable jointing charge Please Enable Macros to View BoQ information |