|
| 1 | Cartage of PCC/STP Pole 11 Mtr from ESC to Work side & All Other Associated Material |
| 2 | Cartage of ACSR Dog Conductor |
| 3 | Cartage of 33 KV XLPE Cable (3x300 sq mm) |
| 4 | Cartage of MS Top channel (125x65x2240mm) & MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 5 | Cartage of Line Isolator 800 A, 33KV (33 KV TPMO) |
| 6 | Cartage of 33 KV V Type X- Arm |
| 7 | Cartage of 33 KV Pin Insulator |
| 8 | Errection of PCC/STP Pole 11 Mtr For New/Existing Line |
| 9 | Concreting/Grouting of PCC Pole 11 Mtr PCC Pole as per standard |
| 10 | Earthing of PCC/ST Pole as per standared |
| 11 | Installation of 33 KV V Type X- Arm with 33 KV Pin Insulator on alreadey errected pole |
| 12 | Installation of 33 KV Pin Insulator on alreadey errected pole |
| 13 | Installtion of MS Top channel (125x65x2240mm) & MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 14 | Installtion of Line Isolator 800 A, 33KV (33 KV TPMO) |
| 15 | Sagging of ACSR Dog Conductor on already errected Pole with All Electrical Accesseries |
| 16 | Laying of 33 KV XLPE Cable (3x300 sq mm) under the Highway with Making Trench & All Associated material |
| 17 | Concreting of Stay with all Associated Material |
| 18 | 33 KV X-Arm Holding Clamp |
| 19 | Aluminium Binding Wire |
| 20 | F-Clamp for 33 KV Line |
| 21 | Nut & Bolt of Variouse Size |
| 22 | Clamp for STP Pole 11 Mtr Long |
| 23 | GI Pipe |
| 24 | Cable Jointing Kit Outdoor |
| 25 | Cable Jointing Kit Straight through |
| 26 | HDPE Pipe |
| 27 | Holding clamps for Top/ Dropper channel TPMO & fuse set ete. with bolts & nuts |
| 28 | F Bracket with N & Bolt |
| 29 | Al PG clamps Weasel to Weasel |
| 30 | G.I. Strip for Earthing Please Enable Macros to View BoQ information |