|
| 1 | Decentralised Items without GST |
| 2 | dzkl vkeZ gksfYMax DySEi uV |
| 3 | ,Q0 czsfdV |
| 4 | ckjcsM ok;j |
| 5 | MsUtj cksMZ DySEi lfgr |
| 6 | LVs ywi balqysVj |
| 7 | uV ,oa cksYV |
| 8 | ih0th0 DySEi |
| 9 | LVs DySEi |
| 10 | ^bZ&czSdsV^ |
| 11 | gksfYMax DySEi Vki pSuy gsrq |
| 12 | gksfYMax DySEi xkfMZax ,afxy gsrq |
| 13 | czsflax DySai |
| 14 | Dropper angle clamp |
| 15 | TOWER items |
| 16 | Fabrication,Galvanizing Inspection & supply of 132KV DC tower including stubs, extensions and stub settig template Gantry Structures as per drawings & BOM for 2no. Of tower |
| 17 | Hot dip galvanized , hexagone round hexagone head transmission tower not bolt off sizes. |
| 18 | TOWERS ACCESSORIES |
| 19 | Number plate |
| 20 | Danger Plate |
| 21 | Phase plate ( 3 IN SET) |
| 22 | 33 KV Pipe type Earthig |
| 23 | PORCELAIN DISC INSULATORS |
| 24 | 120 KN with fitting |
| 25 | HARDWARE SUITABLE FOR ACSR PANTHER |
| 26 | Single Tension fitting |
| 27 | Double Tension fitting |
| 28 | CONDUCTOR ACCESSORIES |
| 29 | Vibration Damper for ACSR Panther |
| 30 | Vibration Damper for Earth wire |
| 31 | ACSR PANTHER CONDUCTOR |
| 32 | EARTH WIRE |
| 33 | Survey including preperation of schedule of materials, marking of locations |
| 34 | Check Survey |
| 35 | Cost of Excavation of 132 KV tower Foundation Pits including all Earth work, Backfilling & Leveling, etc. for |
| 36 | Setting of stubs including all foundation work but excluding the cost of concreting and excavation (Rates per locations) for Double circuit C type towers |
| 37 | Installation of steel reniforcement bars in R.C.C foundation including cost of steel reniforcement bars with cutting , bending , placing , binding etc. |
| 38 | Cost of Concreting for all types of foundation including cost of cement, dewatering, forming,shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 concreting |
| 39 | Erection of super structure of 132 KV towers and Anchor tower and their extensions wherever required including all work above ground level excluding hosting of Insulators, hardware & accessories but including fitting of danger number , phase plates , bird guard and fixing & punching for 132 KV DC lines |
| 40 | Tack welding of all the bolts upto the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 120⁰ Seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint on the affected surface incuding cost of all material including tack welding of River Crossing tower & Anchore towers. |
| 41 | Laying, stringing, tensioning, clamping, jointing etc, of ACSR 'Panther' conductor including hosting of insulators, fitting of all necessary hardware and accessories i.e fitting Armour rods , Vibration dampers ect. On all Six Phases and one earthwire of 132 KV DC lines |
| 42 | Grounding work inciuding eath work etc for pipe type grounding including cokt of coke & salt. |
| 43 | Other small materials and work required to complete the whole work |
| 44 | COST OF LAND AND CROP COMPENSATION payable by firm and payable to firm. |
| 45 | Line work |
| 46 | Shifting, Loading and carriage of Pole, accessories(centralised /decentralised items) from store to site. |
| 47 | Erection of poles with fitting of all acesories |
| 48 | Laying / spreading/stringing of 3 phases of ACSR dog cond. |
| 49 | Gaurding work complete |
| 50 | concreting of poles |
| 51 | Cutting of tree branches |
| 52 | conreting of stay set |
| 53 | earthing work with help of N&B including material |
| 54 | Extra charge for carriage andd Erection of PCC 11 Mtr pole including all other essential required manpower/ machinery/T&P to successfully complete the work. |
| 55 | H.T connection/Disconnection |
| 56 | Carriage of scrap items to store center from site |
| 57 | Decentralised Items without GST |
| 58 | Line items |
| 59 | dzkl vkeZ gksfYMax DySEi uV |
| 60 | ,Q0 czsfdV |
| 61 | LVs ywi balqysVj |
| 62 | ckjcsM ok;j |
| 63 | MsUtj cksMZ DySEi lfgr |
| 64 | uV ,oa cksYV |
| 65 | ih0th0 DySEi |
| 66 | LVs DySEi |
| 67 | ^bZ&czSdsV^ |
| 68 | gksfYMax DySEi Vki pSuy gsrq |
| 69 | czsflax DySai |
| 70 | Dropper angle clamp |
| 71 | Fabrication,Galvanizing Inspection & supply of 132KV DC tower including stubs, extensions and stub settig template Gantry Structures as per drawings & BOM for 2no. Of tower |
| 72 | Hot dip galvanized , hexagone round hexagone head transmission tower not bolt off sizes. |
| 73 | TOWERS ACCESSORIES |
| 74 | Number plate |
| 75 | Danger Plate |
| 76 | Phase plate ( 3 IN SET) |
| 77 | 33 KV Pipe type Earthig |
| 78 | PORCELAIN DISC INSULATORS |
| 79 | 120 KN with fitting |
| 80 | HARDWARE SUITABLE FOR ACSR PANTHER |
| 81 | Single Tension fitting |
| 82 | Double Tension fitting |
| 83 | CONDUCTOR ACCESSORIES |
| 84 | Vibration Damper for ACSR Panther |
| 85 | Vibration Damper for Earth wire |
| 86 | ACSR PANTHER CONDUCTOR |
| 87 | EARTH WIRE |
| 88 | Survey including preperation of schedule of materials, marking of locations |
| 89 | Check Survey |
| 90 | Cost of Excavation of 132 KV tower Foundation Pits including all Earth work, Backfilling & Leveling, etc. for |
| 91 | Setting of stubs including all foundation work but excluding the cost of concreting and excavation (Rates per locations) for Double circuit C type towers |
| 92 | Installation of steel reniforcement bars in R.C.C foundation including cost of steel reniforcement bars with cutting , bending , placing , binding etc. |
| 93 | Cost of Concreting for all types of foundation including cost of cement, dewatering, forming,shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 concreting |
| 94 | Erection of super structure of 132 KV towers and Anchor tower and their extensions wherever required including all work above ground level excluding hosting of Insulators, hardware & accessories but including fitting of danger number , phase plates , bird guard and fixing & punching for 132 KV DC lines |
| 95 | Tack welding of all the bolts upto the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 120⁰ Seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint on the affected surface incuding cost of all material including tack welding of River Crossing tower & Anchore towers. |
| 96 | Laying, stringing, tensioning, clamping, jointing etc, of ACSR 'Panther' conductor including hosting of insulators, fitting of all necessary hardware and accessories i.e fitting Armour rods , Vibration dampers ect. On all Six Phases and one earthwire of 132 KV DC lines |
| 97 | Grounding work inciuding eath work etc for pipe type grounding including cokt of coke & salt. |
| 98 | Other small materials and work required to complete the whole work |
| 99 | COST OF LAND AND CROP COMPENSATION(3% of total supply and erection) payable by firm and payable to firm. |
| 100 | 33 kV line work |
| 101 | Shifting, Loading and carriage of Pole, accessories(centralised /decentralised items) from store to site. |
| 102 | Erection of poles with fitting of all acesories |
| 103 | Laying / spreading/stringing of 3 phases of ACSR dog cond. |
| 104 | concreting of poles |
| 105 | Cutting of tree branches |
| 106 | conreting of stay set |
| 107 | earthing work with help of N&B including material |
| 108 | H.T connection/Disconnection |
| 109 | Carriage of scrap items to store center from site Please Enable Macros to View BoQ information |