| 1 | Decentralised Items 33@11ds0oh0 midsUnz ikyhVsfDud dh {kerko`f) |
| 2 | Control Cable Armoured 4x2.5 mm² |
| 3 | Control Cable Armoured 2x2.5 mm² |
| 4 | Rubber Mat |
| 5 | Alluminium P.G. Clamp/connector for Dog/equipments |
| 6 | Reputed Brand 24Volt (2x12V)Battery 200Ah 60Month Warranty &24Volt Invertor Set With Stand/Trolley |
| 7 | Holding Clamp for GI Pipe |
| 8 | Holding Clamp for cable |
| 9 | Holding Clamp for Top, Droper |
| 10 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 11 | 5MVA T/F HV/LV Bushing Connector |
| 12 | 11 KV LINE Polytechnic |
| 13 | ,e0,l0 dzkl vkeZ gksfYMax DySEi |
| 14 | th0vkb0 ckjcsM ok;j |
| 15 | ,Q czsdsV |
| 16 | MsUtj cksMZ DySEi lfgr |
| 17 | uV ,oa cksYV |
| 18 | ih0th0 DySEi |
| 19 | ,e0,l0 LVs DySEi |
| 20 | ,e0,l0 ^bZ&czSdsV^ ¼,e0,l0 fLVªi½ |
| 21 | ,e0,l0 gksfYMax DySEi Vki pSuy gsrq |
| 22 | ,e0,l0 gksfYMax DySEi xkfMZax ,afxy gsrq |
| 23 | ,e0,l0 czsflax DySEi |
| 24 | Vh0 vkQ DySEi |
| 25 | Mªkij ,afxy DySEi |
| 26 | cable clamp for cable hoisting |
| 27 | Part - B Work 33@11ds0oh0 midsUnz ikyhVsfDud dh {kerko`f) |
| 28 | Shifting, Loading and carriage of Pole, accessories (centralised /decentralised items) from store to site. |
| 29 | Erection of poles with fitting of all acesories including T&P and labour. |
| 30 | Shifting, Loading & Carriage of 33 KV- LA/Post insu./fuse/Bus isolator/VCB/CT/Main Bus Bar with structure & Other Small Str. etc.complete from store center Basti to 33/11 KV S/S |
| 31 | Shifting, Loading & Carriage of 33 KV Control Pannel /11 KV IC Panel/ 11KV O/G panel/ Bus Coupler panel etc. from store center from store center Basti to 33/11 KV S/S |
| 32 | Shifting, Loading & Carriage of Carriage of 11KV Cables of Size from store center from store center Basti to 33/11 KV S/S |
| 33 | Erection,Mounting, fitting of SS Structures (LA/Post insu./fuse/Bus isolator/CT/Main Bus Bar/ (Cable Stand &Nutral Stand ) etc. With Equipment & Making HV connection with ACSR Dog conductor both end of Equipment including all T&P and labour as per site requirements for complete work) |
| 34 | Erection & Fitting of 33 KV Control Pannel /11 KV IC Panel/ 11 KV O/G panel/ Bus Coupler panel With Termination of 11 KV Cable with Transformer and 11 KV Panels Connection Both Side/End including Providing all T&P, Material(Impire/HT /Cello Tape /Nut&Bolt etc.) and Labour. |
| 35 | Laying of 11 KV Cable by digging of trench ,properly laying of 11KV 3*300/185&33kv 3x120 Sqmm cable in it with bricks and sand including cost of brick,sand/Permanent Trench,T&P and labour etc. complete. |
| 36 | Laying of Control Cable & Making control cable drawing, termination and making proper connections including providing ferrules with switchgear equipments from 33 KV Transformer control panel to 33/11 KV power transformers Bucholz relay,OTI,WTI,etc, 33 KV Transformer control panel to 33 VCB & 33 KV C.T.,33 KV PTs,11 KV VCB panels,giving AC/DC supply including all T&P and labour etc. complete. |
| 37 | Erection,Mounting, fitting with Construction of Plinth & foundation for 33 KV VCB structure for complete work) . |
| 38 | Shifting, Loading and carriage of T/F Oil from store to site Including Work Top- Up of T/F Oil in T/F |
| 39 | Installation of Battery & Invertor Set |
| 40 | Cable Jointing Charges of Cable Jointing kit. |
| 41 | Air lifting of cable with 6Inch Dia 1.5Mtr.Long GI pipe ,nut &bolt of suitable size With Extra Angle Erection &Fitting at DP |
| 42 | Making of new 5MVA transformer plinth,including all T&P, material and labour. |
| 43 | Grouting, Muffing of SS Structures (LA/Post insu./fuse/Bus isolator/CT/Main Bus Bar/ (Cable Stand &Nutral Stand ) etc. |
| 44 | Shifting/removing/Dismantalling of old switchgear panels to make space for new switchgear panels, including all T&P and labour. |
| 45 | Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour. |
| 46 | Dismantelling and re-laying of old HT cables as per req complete work including proper terminations. |
| 47 | Const of permanent trench with rcc cover/slab in switch yard as per req. |
| 48 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia upto water level of each pipe as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 49 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 50 | Earthmat half of switchyard area including supply and fabrication with all T&P and Labour. |
| 51 | Earthing of indoor and outdoor Equipments with existing earthing arrangements with GI flat 25mm complete work. |
| 52 | Providing & Painting of S/S Structures,earth strip & Equipments with red oxide,Green and allumunium paints complete switchyard structures and fencing etc. |
| 53 | Fitting of 45Watt LED Street Light at Already Existing Erected 8.5Mtr. Pcc Pole in Switch Yard including Providing all materials and also installation of 45Watt LED Street Light with control circuit,wires and power switches, mcb`s. & arrangements. |
| 54 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project. |
| 55 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 56 | manufacturing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 57 | Temprorary trench by bricks and sand for control cable |
| 58 | Concreting of Stay |
| 59 | Concreting of Support (0.44 CuM) |
| 60 | Outdoor switchyard road 2Mtr.Width from control room to switchyard equipments with interlocking bricks including leveling/smoothening/flooring of switchyard area with first class bricks ,sand and cement in newly constructed switchyard area installed with electrical equipments including all materials,T&P and labour etc. for Complete work. |
| 61 | 11 KV LINE WORK |
| 62 | Shifting, Loading and carriage of Pole, accessories(centralised /decentralised items) from store to site. |
| 63 | Erection of poles with fitting of all acesories |
| 64 | Laying / spreading/stringing of 3 phases of ACSR cond. |
| 65 | Shifting, Loading and carriage of 11kv xlpe cable |
| 66 | Cable jointing charges with cable jointing kit. |
| 67 | Air lifting of cable with 6Inch Dia 1.5Mtr.Long GI pipe ,nut &bolt of suitable size With Extra Angle Erection &Fitting at DP |
| 68 | Laying of 11 KV Cable 3*185 sqmm by HDD/BRICK AND SAND |
| 69 | pole no painting |
| 70 | concreting of poles |
| 71 | Cutting of tree branches |
| 72 | conreting of stay set |
| 73 | H.T connection/Disconnection |
| 74 | Decentralised Items Part A 33@11ds0oh0 midsUnz fodzetksr dh {kerko`f) |
| 75 | Control Cable Armoured 4x2.5 mm² |
| 76 | Control Cable Armoured 2x2.5 mm² |
| 77 | Rubber Mat |
| 78 | Alluminium P.G. Clamp for Dog |
| 79 | Part - B Work 33@11ds0oh0 midsUnz fodzetksr dh {kerko`f) |
| 80 | Shifting, Loading & Carriage of 33 KV- LA/Post insu./CT with structure & Other Small Str. etc.complete from store center Basti to 33/11 KV S/S |
| 81 | Shifting, Loading & Carriage of 33 KV Control Pannel pannel etc. from store center from store center Basti to 33/11 KV S/S |
| 82 | Shifting, Loading & Carriage of Carriage of 11KV Cables of Size from store center from store center Basti to 33/11 KV S/S |
| 83 | Erection,Mounting, fitting of SS Structures (LA/Post insu./CT/ (Cable Stand &Nutral Stand ) etc. With Equipment & Making HV connection with ACSR Dog conductor both end of Equipment including all T&P and labour as per site requirements for complete work) |
| 84 | Erection & Fitting of 33 KV Control Pannel With Termination of 11 KV Cable with Transformer and 11 KV Panels Connection Both Side/End including Providing all T&P, Material(Impire/HT /Cello Tape /Nut&Bolt etc.) and Labour. |
| 85 | Laying of 11 KV Cable by digging of trench ,properly laying of 11KV 3*300/185&33kv 3x120 Sqmm cable in it with bricks and sand including cost of brick,sand/Permanent Trench,T&P and labour etc. complete. |
| 86 | Laying of Control Cable & Making control cable drawing, termination and making proper connections including providing ferrules with switchgear equipments from 33 KV Transformer control panel to 33/11 KV power transformers Bucholz relay,OTI,WTI,etc, 33 KV Transformer control panel to 33 VCB & 33 KV C.T.,33 KV PTs,11 KV VCB panels,giving AC/DC supply including all T&P and labour etc. complete. |
| 87 | Grouting, Muffing of SS Structures (LA/Post insu./fuse/CT/ (Cable Stand &Nutral Stand ) etc. |
| 88 | 11KV C/J Kit Jointing charges of Diff. Size |
| 89 | Air lifting of cable with 6Inch Dia 1.5Mtr.Long GI pipe ,nut &bolt of suitable size With Extra Angle Erection &Fitting at DP |
| 90 | Dismentling of Existing security fencing /iron gate/piller/boundry wall & re-erection after completion with repairing of work,including all T&P and labour. |
| 91 | Shifting/Dragging of Existing 5 MVA T/F about 50 Mtr. distance from Plinth,including opening of jumpers,earthing,conservator tank, radiator & emptying of T/F oil & complete work, including T&P and Labour. |
| 92 | Repairing old existing T/F plinth for new 10 MVA T/F including all material ,T&P and labour. |
| 93 | Repairing of existing 33 kv VCB of electrical/mechanical fault encluding required providing material and t&p and labour etc. |
| 94 | Dismentalling of old switchyard structures to make space for new structures including all T&P and labour. |
| 95 | Shifting/removing/Dismantalling of old switchgear panels to make space for new switchgear panels, including all T&P and labour. |
| 96 | Repairing of existing permanent trench with rcc cover/slab in switch yard as per req. |
| 97 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia upto water level of each pipe as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 98 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 99 | Providing Extra Labour for Helping at Installation Time of 10 MVA T/F at Plinth,including Fitting conservator tank, radiator & filling of T/F oil & complete work |
| 100 | manufacturing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 101 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc.As per site required to complete the project During Work. |
| 102 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 103 | Earthing of complete Indoor & outdoor equipement & Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 104 | Providing & Painting of all Old & New S/S Structures,Earthing flats & Equipments with red oxide, Green and allumunium paints including fencing. |
| 105 | Fitting of 45Watt LED Street Light at Already Existing Erected Pcc Pole in Switch Yard including Providing all materials and also installation of 45Watt LED Street Light with control circuit,wires and power switches, mcb`s. & arrangements. |
| 106 | Received back Charges of Material from site To Store including Shifting, Loading & Carriage of 33 KV -CT/C Pannel etc. Please Enable Macros to View BoQ information |