| 1 | Armored Control Cable |
| 2 | 4x2.5 mm² |
| 3 | 2x2.5 mm² |
| 4 | Rubber Mat |
| 5 | Alluminium P.G. Clamp/connector for Dog/equipments |
| 6 | 24Volt (2x12V)Battery 200Ah 60Month Warranty &24Volt Invertor 2550VA Set With Stand/Trolley |
| 7 | Holding Clamp for GI Pipe |
| 8 | Holding Clamp for cable |
| 9 | Holding Clamp for Top, Droper |
| 10 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 11 | 5MVA T/F HV/LV Bushing Connector |
| 12 | Cartage Charges of All Centralised /Decentralised items (33KV Structures/ /equipemnets/ HT Cables/Control Cables/Pole/ Etc.) from store to site AND Erection Charges of All Centralised /Decentralised items (33KV Structures/ /equipemnets/ HT Cables/Control Cables/Pole/ Etc.) Including Mounting /Fitting/Cable laying HT/Control Cables/Proper Connection /Etc. complete All work Perposed in Estimate as per Norms/RESPO in IC Work as per site requirement. |
| 13 | Grouting,muffing of SS structure(LA/POST/Fuse/Bus /CT//Main bus bar/(cablestand&Neutralstand ) etc |
| 14 | Construction of Plinth & foundation for 33 KV VCB structure for complete work) . |
| 15 | Dismantalling old switchyard fencing& construction of new extended req boundry wall, Gate and installation of new MS strip fencing of suitable height including MS angle at proper space to give support on top and base horizontally and vertically at new required place to mak space in switchyard inclding painting, grouting etc. |
| 16 | Eart filling as per req. of site with ramming, smoothening. |
| 17 | Making of new 5MVA transformer plinth,including all T&P, material and labour. |
| 18 | Fire wall for power tf protection |
| 19 | Shifting/removing/Dismantalling of old switchgear panels to make space for new switchgear panels, including all T&P and labour. |
| 20 | Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour. |
| 21 | Dismantelling and re-laying of old HT cables as per req complete work including proper terminations. |
| 22 | Cable jointing charges with cable jointing kit. |
| 23 | Laying of 11 KV Cable in air with 6 inch GI pipe |
| 24 | Const of permanent trench with rcc cover/slab in switch yard as per req. |
| 25 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia upto water level of each pipe as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 26 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 27 | Earthmat half of switchyard area including supply and fabrication with all T&P and Labour. |
| 28 | Earthing of indoor and outdoor Equipments with existing earthing arrangements with GI flat 25mm complete work. |
| 29 | Providing & Painting of S/S Structures,earth strip & Equipments with red oxide,Green and allumunium paints of new structure |
| 30 | Fitting of 45Watt LED Street Light at Already Existing Erected 8.5Mtr. Pcc Pole in Switch Yard/CR building including Providing all materials and also installation of 45Watt LED Street Light with control circuit,wires and power switches, mcb`s. & arrangements. |
| 31 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project. |
| 32 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 33 | Grouting and plinthing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 34 | Opening of gasket and filling of oil including reclamation of Full Transformer by Centrifusing machine on site including all T&P ,Material and labour incase of Old & used Tansformer received from store center in cluding general maintenance work with supply of OTI/WTI if required. |
| 35 | permanent narrow trench by bricks and sand and cement including liquid cementing only for for control cable |
| 36 | Concreting of Stay |
| 37 | Concreting of Support (0.44 CuM) |
| 38 | Repairing of existing permanent trench with rcc cover/slab in switch yard/new as per req. |
| 39 | Extra work charge for carraige and erection of pcc 11 mtr pole including all other essential requirement manpower / machinery /T&P to successfully complete the work |
| 40 | Outdoor switchyard leveling/smoothening/flooring of all switchyard area with first class bricks ,sand and cement in newly constructed switchyard area installed with electrical equipments including all materials,T&P and labour etc. for Complete work. |
| 41 | dk;Z dk fooj.k & fctusl Iyku o\\"kZ 2026&27 ds varxZr 33@11dsoh fo0midsanz fxngh cLrh ds 2X10MVA ls 2X10+5MVA ,oa 33@11 dsoh0 fo0 midsan ekyoh; jksM cLrh ds 2X5MVA ls 3X5MVA {kerko`f) djus dk dk;ZA |
| 42 | Armored Control Cable |
| 43 | 4x2.5 mm² |
| 44 | 2x2.5 mm² |
| 45 | Rubber Mat |
| 46 | Alluminium P.G. Clamp/connector for Dog/equipments |
| 47 | 24Volt (2x12V)Battery 200Ah 60Month Warranty &24Volt Invertor 2550VA Set With Stand/Trolley |
| 48 | Holding Clamp for GI Pipe |
| 49 | Holding Clamp for cable |
| 50 | Holding Clamp for Top, Droper |
| 51 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 52 | 5MVA T/F HV/LV Bushing Connector |
| 53 | Cartage Charges of All Centralised /Decentralised items (33KV Structures/ /equipemnets/ HT Cables/Control Cables/Pole/ Etc.) from store to site AND Erection Charges of All Centralised /Decentralised items (33KV Structures/ /equipemnets/ HT Cables/Control Cables/Pole/ Etc.) Including Mounting /Fitting/Cable laying HT/Control Cables/Proper Connection /Etc. complete All work Perposed in Estimate as per Norms/RESPO in IC Work as per site requirement. |
| 54 | Grouting,muffing of SS structure(LA/POST/Fuse/Bus /CT//Main bus bar/(cablestand&Neutralstand ) etc |
| 55 | Construction of Plinth & foundation for 33 KV VCB structure for complete work) . |
| 56 | Dismantalling old switchyard fencing and installation of new MS strip fencing of suitable height including MS angle at proper space to give support on top and base horizontally and vertically at new required place to mak space in switchyard inclding painting, grouting etc. |
| 57 | Eart filling as per req. of site with ramming, smoothening. |
| 58 | Making of new 5MVA transformer plinth,including all T&P, material and labour. |
| 59 | Fire wall for power tf protection |
| 60 | Shifting/removing/Dismantalling of old switchgear panels to make space for new switchgear panels, including all T&P and labour. |
| 61 | Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour. |
| 62 | Dismantelling and re-laying of old HT cables as per req complete work including proper terminations. |
| 63 | Cable jointing charges with cable jointing kit. |
| 64 | Laying of 11 KV Cable in air with 6 inch GI pipe |
| 65 | Const of permanent trench with rcc cover/slab in switch yard as per req. |
| 66 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia upto water level of each pipe as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 67 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 68 | Earthmat half of switchyard area including supply and fabrication with all T&P and Labour. |
| 69 | Earthing of indoor and outdoor Equipments with existing earthing arrangements with GI flat 25mm complete work. |
| 70 | Providing & Painting of S/S Structures,earth strip & Equipments with red oxide,Green and allumunium paints complete and fencing etc. |
| 71 | Fitting of 45Watt LED Street Light at Already Existing Erected 8.5Mtr. Pcc Pole in Switch Yard/CR building including Providing all materials and also installation of 45Watt LED Street Light with control circuit,wires and power switches, mcb`s. & arrangements. |
| 72 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project. |
| 73 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 74 | Grouting and plinthing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 75 | Opening of gasket and filling of oil including reclamation of Full Transformer by Centrifusing machine on site including all T&P ,Material and labour incase of Old & used Tansformer received from store center in cluding general maintenance work with supply of OTI/WTI if required. |
| 76 | permanent narrow trench by bricks and sand and cement including liquid cementing only for for control cable |
| 77 | Concreting of Stay |
| 78 | Concreting of Support (0.44 CuM) |
| 79 | Repairing of existing permanent trench with rcc cover/slab in switch yard/New as per req. |
| 80 | Extra work charge for carraige and erection of pcc 11 mtr pole including all other essential requirement manpower / machinery /T&P to successfully complete the work |
| 81 | Outdoor switchyard leveling/smoothening/flooring of all switchyard area with first class bricks ,sand and cement in newly constructed switchyard area installed with electrical equipments including all materials,T&P and labour etc. for Complete work. |
| 82 | dk;Z dk fooj.k & fctusl Iyku o\\"kZ 2026&27 ds varxZr 33@11dsoh fo0midsanz fxngh cLrh ds 2X10MVA ls 2X10+5MVA ,oa 33@11 dsoh0 fo0 midsan ekyoh; jksM cLrh ds 2X5MVA ls 3X5MVA {kerko`f) djus dk dk;ZA PAULI |
| 83 | Armored Control Cable |
| 84 | 4x2.5 mm² |
| 85 | 2x2.5 mm² |
| 86 | Rubber Mat |
| 87 | Alluminium P.G. Clamp/connector for Dog/equipments |
| 88 | 24Volt (2x12V)Battery 200Ah 60Month Warranty &24Volt Invertor 2550VA Set With Stand/Trolley |
| 89 | Holding Clamp for GI Pipe |
| 90 | Holding Clamp for cable |
| 91 | Holding Clamp for Top, Droper |
| 92 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 93 | 5MVA T/F HV/LV Bushing Connector |
| 94 | Cartage Charges of All Centralised /Decentralised items (33KV Structures/ /equipemnets/ HT Cables/Control Cables/Pole/ Etc.) from store to site AND Erection Charges of All Centralised /Decentralised items (33KV Structures/ /equipemnets/ HT Cables/Control Cables/Pole/ Etc.) Including Mounting /Fitting/Cable laying HT/Control Cables/Proper Connection /Etc. complete All work Perposed in Estimate as per Norms/RESPO in IC Work as per site requirement. |
| 95 | Grouting,muffing of SS structure(LA/POST/Fuse/Bus /CT//Main bus bar/(cablestand&Neutralstand ) etc |
| 96 | Construction of Plinth & foundation for 33 KV VCB structure for complete work) . |
| 97 | Dismantalling old switchyard fencing and installation of new MS strip fencing of suitable height including MS angle at proper space to give support on top and base horizontally and vertically at new required place to mak space in switchyard inclding painting, grouting etc. |
| 98 | Eart filling as per req. of site with ramming, smoothening. |
| 99 | Making of new 5MVA transformer plinth,including all T&P, material and labour. |
| 100 | Fire wall for power tf protection |
| 101 | Shifting/removing/Dismantalling of old switchgear panels to make space for new switchgear panels, including all T&P and labour. |
| 102 | Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour. |
| 103 | Dismantelling and re-laying of old HT cables as per req complete work including proper terminations. |
| 104 | Cable jointing charges with cable jointing kit. |
| 105 | Laying of 11 KV Cable in air with 6 inch GI pipe |
| 106 | Const of permanent trench with rcc cover/slab in switch yard as per req. |
| 107 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia upto water level of each pipe as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 108 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 109 | Earthmat half of switchyard area including supply and fabrication with all T&P and Labour. |
| 110 | Earthing of indoor and outdoor Equipments with existing earthing arrangements with GI flat 25mm complete work. |
| 111 | Providing & Painting of S/S Structures,earth strip & Equipments with red oxide,Green and allumunium paints of new structure |
| 112 | Fitting of 45Watt LED Street Light at Already Existing Erected 8.5Mtr. Pcc Pole in Switch Yard/CR building including Providing all materials and also installation of 45Watt LED Street Light with control circuit,wires and power switches, mcb`s. & arrangements. |
| 113 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project. |
| 114 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 115 | Grouting and plinthing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 116 | Opening of gasket and filling of oil including reclamation of Full Transformer by Centrifusing machine on site including all T&P ,Material and labour incase of Old & used Tansformer received from store center in cluding general maintenance work with supply of OTI/WTI if required. |
| 117 | permanent narrow trench by bricks and sand and cement including liquid cementing only for for control cable |
| 118 | Concreting of Stay |
| 119 | Concreting of Support (0.44 CuM) |
| 120 | Outdoor switchyard leveling/smoothening/flooring of all switchyard area with first class bricks ,sand and cement in newly constructed switchyard area installed with electrical equipments including all materials,T&P and labour etc. for Complete work. Please Enable Macros to View BoQ information |