| 1 | Work-01 (Kasia Rural (Isolator)PART - B- Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Kasia Rural under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 2 | 33 KV line Isolator 800Amp |
| 3 | 33 KV Bus Isolator 400Amp |
| 4 | Mounting, Installation, Fitting & Earthing of 33 kv Line Isolator complete work |
| 5 | Mounting, Installation, Fitting & Earthing of 33 kv Bus Isolator complete work |
| 6 | Work-02 Kasia Rural (LA )PART - B- Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Kasia Rural under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 7 | 33 KV LA |
| 8 | Mounting,Installation,Fitting & Earthing of 33 KV LA Isolator complete work |
| 9 | Work-03 Kasia Rural (CT/PT )PART - A- Particulars (Provided by contractor) |
| 10 | Armoured copper 2x2.5 mm |
| 11 | Armoured copper 4x2.5 mm |
| 12 | PART - B- WORKShifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Kasia Rural under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 13 | 33 KV CT/PT Metering pole mounted unit |
| 14 | Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard(As per site requirement laying can be done through existing trench) including cost of sand and 1st class bricks with covering and making connection complete. |
| 15 | 2 x 2.5 mm2 |
| 16 | 4 x 2.5 mm2 |
| 17 | Mounting.Installation, Fitting & Earthing of 33CT/PT metering pole mounted unit complete work. |
| 18 | Work-04 Kasia Rural (Fuse set )PART - B- Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Kasia Rural under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 19 | 33 KV Fuseset |
| 20 | Mounting.Installation, Fitting & Earthing of 33 kv Fuse set complete work |
| 21 | Work-05 Fazilnagar (Line Isolator )PART - B- Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Fazilnagar under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 22 | 33 KV line Isolator 800Amp |
| 23 | Mounting, Installation, Fitting & Earthing of 33 kv Line Isolator complete work |
| 24 | Work-06 Khadda (Chemical Earthing) PART - B- WORK- |
| 25 | Chemical Earthing(80 mm dia & 3mm thickness of GI pipe with 2 bori chemical compound/Earthing) of power TF with providing of all required materials |
| 26 | Work-07 Ravindra nagar (SS Protection)PART - A- Particulars (Provided by contractor) |
| 27 | Armoured copper 2x2.5 mm |
| 28 | Armoured copper 4x2.5 mm |
| 29 | PART - B- Shifting & loading of following materials on private truck from store centre Padrauna& carriage up to 33/11 KV Sub-Station Ravindranagar under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 30 | 33 KV CT |
| 31 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 32 | 33KV Control Panel for Single Transformer |
| 33 | Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard (As per site requirement laying can be done through existing trench) including cost of sand and 1st class bricks with covering and making connection complete. |
| 34 | 2 x 2.5 mm2 |
| 35 | 4 x 2.5 mm2 |
| 36 | Mounting.Installation, Fitting & Earthing of 33 KV CT complete work |
| 37 | Wiring and complete connection of 33 KV CT. |
| 38 | Erection, Grouting of 33 KV VCB Structure |
| 39 | Wiring, Earthing and complete connection of 33 KV VCB |
| 40 | Wiring and complete connection of 33 KV Control pannel for Single Transformer |
| 41 | Earthing of Control pannel |
| 42 | Work-08 Kaptanganj (LA)PART - B- WORK-Shifting & loading of following materials on private truck from store centre Padrauna& carriage up to 33/11 KV Sub-Station Kaptanganj under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 43 | 33 KV LA |
| 44 | Structure of 33KV A |
| 45 | Erection,Grouting of 33 kv LA Structure complete work |
| 46 | Mounting,Installation, Fittig & Earthing of 33 kv LA complete work |
| 47 | Work-09 Kaptanganj (Fuse set)PART - B- WORK-Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Kaptanganj under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 48 | 33 KV Fuse Set |
| 49 | Structure of 33KV Fuse set |
| 50 | Erection,Grouting of 33 kv Fuse set Structure complete work |
| 51 | Mounting.Installation, Fitting & Earthing of 33 kv Fuse set complete work |
| 52 | Work-10 Khottha (Delta Earthing) PART - B- WORK- |
| 53 | Water Level T/F Neutral/Body Earthing (Delta Type) upto water level |
| 54 | Work-11 Khottha (outdoor earthmat & Delta Earthing for indoor equipment earthing) PART - B- WORK- |
| 55 | Water Level indoor equipment Earthing (Delta Type) upto 60' feet with materials |
| 56 | Laying of Outdoor Equipment (Eartmat) with all required material |
| 57 | Work-12 Khottha Khottha (isolator)PART - B- WORK-Shifting & loading of following materials on private truck from store centrePadrauna & carriage up to 33/11 KV Sub-Station Khottha under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 58 | 33 KV Bus Isolator 400Amp |
| 59 | Mounting,Installation,Fitting & Earthing of 33 kv Bus Isolator complete work |
| 60 | Work-13 Khottha (fuseset)PART - B- WORK-Shifting & loading of following materials on private truck from store centre Padrauna& carriage up to 33/11 KV Sub-Station Khottha under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 61 | 33 KV Fuse Set |
| 62 | Structure of 33KV Fuse set |
| 63 | Erection,Grouting of 33 kv Fuse set Structure complete work |
| 64 | Mounting.Installation, Fitting & Earthing of 33 kv Fuse set complete work |
| 65 | Work-14 Barauli (isolator)PART - B- WORK-Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Barauli under EDC-Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 66 | 33 KV line Isolator 800Amp |
| 67 | Mounting.Installation, Fitting & Earthing of 33 kv Line Isolator complete work |
| 68 | Work-15 Barauli (CT & PT)PART - A- Particulars (Provided by contractor) |
| 69 | Armoured copper 2x2.5 mm |
| 70 | Armoured copper 4x2.5 mm |
| 71 | PART - B- WORK-Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Barauli under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 72 | 33 KV PT |
| 73 | 33 KV CT |
| 74 | Laying from switchyard to control room for 33 KV panel, CT and 10/5 MVA T/F by digging trench in switchyard(As per site requirement laying can be done through existing trench) including cost of sand and 1st class bricks with covering and making connection complete. |
| 75 | 2 x 2.5 mm2 |
| 76 | 4 x 2.5 mm2 |
| 77 | Mounting.Installation, Fitting & Earthing of 33 KV CT complete work |
| 78 | Wiring and complete connection of 33 KV CT. |
| 79 | Mounting.Installation, Fitting & Earthing of 33 KV PT complete work |
| 80 | Wiring and complete connection of 33 KV PT. |
| 81 | Work-16 Barauli (fuse set)PART - B- WORK-Shifting & loading of following materials on private truck from store centre Padrauna & carriage up to 33/11 KV Sub-Station Barauli under EDC Kushinagar Distt- Kushinagar & Un-loading of the same with proper stacking |
| 82 | 33 KV Fuse Set |
| 83 | Structure of 33KV Fuse set |
| 84 | Erection,Grouting of 33 kv Fuse set Structure complete work |
| 85 | Mounting.Installation, Fitting & Earthing of 33 kv Fuse set complete work Please Enable Macros to View BoQ information |