| 1 | fo|qr uxjh; forj.k [k.M&VkmugkWy xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r 11 ds0oh0 iks\\"kdksa ds foHkfDrdj.k gsrq dk;ZA |
| 2 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 3 | 3x185 mm2 XLPE 11 KV |
| 4 | PCC 8.5 Mtr. Long |
| 5 | 11 KV Dropper Channel |
| 6 | 11 KV Top Channel |
| 7 | 11 KV Pin Insulator |
| 8 | 11 KV pin with net |
| 9 | Stay Complete |
| 10 | Earthing Complete |
| 11 | 11 KV VCB O/G CTR 200/100/5A, 350 MVA |
| 12 | Supply of following material/fitting complete in all respect :- |
| 13 | Cable jointing kit 11 KV XLPE 3X185 sq mm |
| 14 | Straight through 11 KV XLPE 3X185 sq mm |
| 15 | Cable Route Marker |
| 16 | Holding clamps for top, dropper, t-off etc |
| 17 | G.I Nuts & Bolts off size |
| 18 | G.I Pipe dia |
| 19 | The excavation of 2 foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of PCC Pole with fixing of necessary clamps & accessories as per required. All required materials such as Top, Dropper Channel, Holding clamp/PCC clamp, F-Bracket, insulator, G.I Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).All work will be done as per RESPO norms & relevent IS Specification. |
| 20 | Laying of 11 KV XLPE Cable by HDD method as per RESPO Norms |
| 21 | Laying of 11 KV XLPE Cable in trench as per RESPO Norms |
| 22 | Erection, testing and commissioning of 11 kV VCB complete in all respect as per relevant IS standards |
| 23 | Erection of route marker complete in all respect including excavation, foundation, fixing, painting and marking as per approved specifications |
| 24 | Making loop and hoisting of 11 kV XLPE cable on existing double pole/single pole with G.I. pipe complete in all respect as per relevant IS standards. |
| 25 | Erection of 11 KV jointing kit |
| 26 | Erection of Stay Complete as per RESPO Norms |
| 27 | Earthing of 11 kV VCB complete in all respect including earth conductor/strip, accessories, connection, testing and commissioning as per relevant IS code. |
| 28 | fo|qr uxjh; forj.k [k.M&VkmugkWy] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ttZj ,p0Vh0 iksy cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.kA |
| 29 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 30 | PCC Pole 11 M Long |
| 31 | Earthing Complete |
| 32 | 11 KV Pin insulator with Fitting |
| 33 | 11 KV V cross arm |
| 34 | Extra for stays at angle Location (Stay rod 16x1800mm, Stay wire 5 kg, stay clamp, bolts & nut) |
| 35 | Supply of following material/fitting complete in all respect :- |
| 36 | Danger baord Barbed wire including jumper |
| 37 | GI Barbed Wire |
| 38 | F Bracket |
| 39 | Holding Clamp for V Cross Arm |
| 40 | GI Nut & Bolts |
| 41 | Excavation of foundation pit of size 750 mm × 450 mm and depth equal to 1/6th of the total pole length, fabrication and erection of PCC pole complete in all respect, including fixing of all necessary clamps and accessories as required. The work shall include supply and fixing of all required materials such as V-cross arm, holding clamp/PCC/LT clamp, F-bracket, insulators, nuts, bolts and other accessories of approved size and specification by the contractor. The item shall also include grouting of pole in cement concrete of ratio 1:4:8 (1 Cement : 4 Sand : 8 aggregate/40 mm brick ballast) in a block of size 450 mm × 450 mm up to ground level, complete backfilling of pits with excavated earth, ramming, dressing and leveling of site, including re-sagging of conductors wherever required, complete in all respect as per RESPO norms, relevant IS specifications |
| 42 | Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms. |
| 43 | Erection of Stay Complete as per RESPO Norms |
| 44 | Erection of Danger Board wire including jumper |
| 45 | Dismentling & Carriage of Old/Damaged Poles |
| 46 | fo|qr uxjh; forj.k [k.M&VkmugkWy] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r xkfMZax ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k |
| 47 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 48 | GI Wire 5 MM 6 SWG |
| 49 | Nuts & bolts of different sizes |
| 50 | Holding Clamp |
| 51 | LT Shackle insulator |
| 52 | 11 kV Pin |
| 53 | Guarding Angle |
| 54 | Fixing of guarding for HT line at required locations complete with all materials, labour, tools & tackles as per RESPO norms, relevant IS specifications and direction of Engineer-in-Charge. |
| 55 | fo|qr uxjh; forj.k [k.M&VkmugkWy xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r Lis;j dscy fcNkus gsrq dk;Z dk fooj.k |
| 56 | Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- |
| 57 | 3x185 mm2 XLPE 11 KV |
| 58 | Supply of following material/fitting complete in all respect :- |
| 59 | Cable jointing kit 11 KV XLPE 3X185 sq mm |
| 60 | Cable Route Marker |
| 61 | G.I Nuts & Bolts off size |
| 62 | G.I Pipe dia |
| 63 | Laying of 11 KV XLPE Cable by HDD method as per RESPO Norms |
| 64 | Making loop and hoisting of 11 kV XLPE cable on existing double pole/single pole with G.I. pipe complete in all respect as per relevant IS standards. |
| 65 | Erection of route marker complete in all respect including excavation, foundation, fixing, painting and marking as per approved specifications |
| 66 | Erection of 11 KV jointing kit Please Enable Macros to View BoQ information |