| 1 | Control Cable armoured |
| 2 | 4x2.5 mm² |
| 3 | 2x2.5 mm² |
| 4 | Rubber Mat |
| 5 | Alluminium P.G. Clamp/connector for Dog/equipments |
| 6 | 24Volt (2x12V)Battery 200Ah 60Month Warranty &24Volt Invertor 2550VA Set With Stand/Trolley |
| 7 | Holding Clamp for GI Pipe |
| 8 | Holding Clamp for cable |
| 9 | Holding Clamp for Top, Droper |
| 10 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 11 | 5MVA T/F HV/LV Bushing Connector |
| 12 | Shifting, Loading and carriage of Pole/ conductor , accessories (centralised /decentralised items) from store to site. |
| 13 | Erection of poles with fitting of all acesories including T&P and labour. |
| 14 | Shifting, Loading & Carriage of 33 KV- LA/Post insu./fuse/Bus isolator/VCB/CT/Main Bus Bar with structure & Other Small Str. etc.complete from store center to site |
| 15 | Shifting, Loading & Carriage of 33 KV Control Pannel /11 KV IC Panel/ 11KV O/G panel/ Bus Coupler panel etc. from store center from store center Basti to 33/11 KV S/S |
| 16 | Shifting, Loading & Carriage of Carriage of 11KV Cables of Size from store center from store center Basti to 33/11 KV S/S |
| 17 | Erection,Mounting, fitting of SS Structures (LA/Post insu./fuse/Bus isolator/CT/Main Bus Bar/ (Cable Stand &Nutral Stand ) etc. With Equipment & Making HV connection with ACSR Dog conductor both end of Equipment including all T&P and labour as per site requirements for complete work) |
| 18 | Erection & Fitting of 33 KV Control Pannel /11 KV IC Panel/ 11 KV O/G panel/ Bus Coupler panel With Termination of 11 KV Cable with Transformer and 11 KV Panels Connection Both Side/End including Providing all T&P, Material(Impire/HT /Cello Tape /Nut&Bolt etc.) and Labour. |
| 19 | Laying of 11 KV Cable by digging of trench ,properly laying of 11KV 3*300/185&33kv 3x120 Sqmm cable in it with bricks and sand including cost of brick,sand/permanent trench,T&P and labour. |
| 20 | Laying of Control Cable & Making control cable drawing, termination and making proper connections including providing ferrules with switchgear equipments from 33 KV Transformer control panel to 33/11 KV power transformers Bucholz relay,OTI,WTI,etc, 33 KV Transformer control panel to 33 VCB & 33 KV C.T.,33 KV PTs,11 KV VCB panels,giving AC/DC supply including all T&P and labour etc. complete. |
| 21 | Shifting, Loading and carriage of T/F Oil from store to site Including Work Top- Up of T/F Oil in T/F |
| 22 | Grouting,muffing of SS structure(LA/POST/Fuse/Bus /CT//Main bus bar/(cablestand&Neutralstand ) etc |
| 23 | Construction of Plinth & foundation for 33 KV VCB structure for complete work) . |
| 24 | Fabrication of new security wiremesh fencing with MS channel support at regular interval including grouting to isolate control room and switchyard area with fabrication and installation of new gate 12ft wide. |
| 25 | Repair and maintenace of old exi. Fencing complete work men, material complete work as per req. |
| 26 | Making of new 5MVA transformer plinth,including all T&P, material and labour. |
| 27 | shifting of 33 kv exi dp structure with cable to suitable place for installation of busbar gantry to make space for additional transformer installation,the work includes providing of poles,men,material etc all required to complete the work. |
| 28 | Shifting/removing/Dismantalling of old /scrap switchgear panels to make space for new switchgear panels, including all T&P and labour. |
| 29 | Re-installation of old switchgear panels after removing of old scrap panels to make space for new switchgear panels, including all T&P and labour. |
| 30 | Fabrication of neutral stand and cable stand with MS items like top channel and angle including cutting, welding etc. complete work, including all T&P and labour. |
| 31 | Dismantelling and re-laying of old HT cables as per req complete work including proper terminations. |
| 32 | Cable jointing charges with cable jointing kit. |
| 33 | Laying of 11 KV Cable in air with 6 inch GI pipe |
| 34 | Const of permanent trench with rcc cover/slab in switch yard as per req. |
| 35 | Power TF (1 No.) Delta Neutral Earthing ,with providing (gi pipe 1.25 inch dia upto water level of each pipe as per req.)with coal and salt, copper flexible mess including Making Delta Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 36 | Power Transformer (2 no.) Body Earthing ,with providing(GI pipe 1.25 inch dia upto water level length of each pipe)with coal and salt and welding it with earthmat including Connected by Welding with GI flat 25mm & Providing all T&P, Material and Labour. |
| 37 | Earthmat half of switchyard area including supply and fabrication with all T&P and Labour. |
| 38 | Earthing of indoor and outdoor Equipments with existing earthing arrangements with GI flat 25mm complete work. |
| 39 | Providing & Painting of S/S new Structures,earth strip & Equipments with red oxide,Green and allumunium paints complete and complete fencing etc. |
| 40 | Fitting of 45Watt LED Street Light at Already Existing Erected 8.5Mtr. Pcc Pole in Switch Yard/CR building including Providing all materials and also installation of 45Watt LED Street Light with control circuit,wires and power switches, mcb`s. & arrangements. |
| 41 | All other small works,materials & arrangements like allumunium lugs,CT connectors,clamps,nut&bolts,etc. required to complete the project. |
| 42 | Giving proper support for giving Ac supply and making necessary arrangements & Providing Extra Labour for Helping at Testing Time of CTs,VBCs,Transformer,after completion of work to departmental Test team. |
| 43 | Grouting and plinthing of Cable stand of MS Channel for 11 KV Cable in switchyard with (3200 mm two length jointed with 3 no.intermediate channel with clamp ) |
| 44 | permanent narrow trench by bricks and sand and cement including liquid cementing, only for for control cable |
| 45 | Concreting of Stay |
| 46 | Concreting of Support (0.44 CuM) |
| 47 | Repairing of existing permanent trench with rcc cover/slab in switch yard as per req. |
| 48 | Outdoor switchyard road with firstclass bricks 3 Mtr.Width from main gate to control room, CR room to power transformer 1,2,3 and leveling/smoothening/flooring of switchyard area with first class bricks ,sand and cement in newly constructed switchyard area installed with electrical equipments including all materials,T&P and labour etc. for Complete work. Please Enable Macros to View BoQ information |