| 1 | Decentralised Items without GST |
| 2 | dzkl vkeZ gksfYMax DySEi uV |
| 3 | ,Q0 czsfdV |
| 4 | ckjcsM ok;j |
| 5 | MsUtj cksMZ DySEi lfgr |
| 6 | uV ,oa cksYV |
| 7 | ih0th0 DySEi |
| 8 | LVs DySEi |
| 9 | ^bZ&czSdsV^ |
| 10 | pSuy ,Q0 czsfdV |
| 11 | ,ywfefu;e iSUV |
| 12 | jSM vkfDlkbM iSUV |
| 13 | gksfYMax DySEi Vki pSuy gsrq |
| 14 | gksfYMax DySEi xkfMZax ,afxy gsrq |
| 15 | czsflax DySai |
| 16 | LVs ywi balqysVj For 33KV |
| 17 | Line works |
| 18 | Shifting, Loading and carriage of 58 No.Pole & 21.40 km conductor and accessories(centralised /decentralised items) from store to site. |
| 19 | Erection of poles with fitting of all acesories |
| 20 | Laying / spreading/stringing of 3 phases of ACSR dog cond. |
| 21 | concreting of poles |
| 22 | Cutting of tree branches |
| 23 | plinthing of pole |
| 24 | conreting of stay set |
| 25 | Opening of Winding and rewinding after completion of work on Existing Pin insulator, F-bracket and safely keeping the conductor on Cross arm for re-sagging/re-tightening of exixting old loose/ broken or new conductor including all material and labour. |
| 26 | Opening of Winding and rewinding after completion of work from disc fitting of Existing section poles for the purpose of resagging and retightening of conductor including all material and labour asper site conditions for complete work. |
| 27 | Staightening of tilted and reshuffling of pole/interpoles to look even by digging of pit at pole base and safely straightening of pole, refilling with concrete materials etc, including all material and labour. |
| 28 | Opening of old existing tilted X-arm,F-bracket ,its nut-bolt,Pin,etc. and re-installing of X-arm ,Nut-bolt,Pin ,etc. new or same as per site req.complete work including All T&P and labour |
| 29 | Opening of old existing Disc and disc fitting,its nut-bolt,,etc. and re-installing of disc insulator,disc fitting ,Nut-bolt,,etc. new or same complete work including All T&P and labour as per site conditions. |
| 30 | Height extension of poles as per site req. with all materials and labours. |
| 31 | Opening ,collecting,bundelling from poles and Reciept back of scrap conductor to staore center as per site conditions complete work. |
| 32 | Extra work charge for carraige and erection of pcc 11 mtr pole including all other essential requirement manpower / machinery /T&P to successfully complete the work |
| 33 | Gaurding works |
| 34 | 132 dsoh0 ukFkuxj ls 33@11 dsoh0 eq[kfyliqj lardchjuxj rd tkus okyh 33 dsoh0 ykbu dh xkfMZax dk dk;ZA |
| 35 | Decentralised Items without GST |
| 36 | gksfYMax DySEi xkfMZax ,afxy |
| 37 | uV ,oa cksYV All Size |
| 38 | Line works |
| 39 | Shifting, Loading and carriage of Gaurding angle and GI Wire (centralised /decentralised items) from store to site. |
| 40 | Gaurding work all fitting, T&P Labour Please Enable Macros to View BoQ information |