| 1 | Work without GST |
| 2 | Cartage of PCC 9 mtr pole including all small items to site from store |
| 3 | Erection of 9 mtr PCC DP structure including all work of providing of clamps,nut and bolt, fitting accessories,cutting of top channel to make t-off ,acsr cond. Sagging,jumpering etc. |
| 4 | Cartage of cable from store centre to work site |
| 5 | cost HDPE pipe 160 MM |
| 6 | GI pipe 6inch dia 3 mtr length |
| 7 | Cable laying by digging/drilling(LS)/HDD machine(Quadruple circuit) including HDPE pipe also. |
| 8 | Laying of loop with sand and bricks around the cable . |
| 9 | Cable jointing charges of 33 KV XLPE Cable Outdoor. |
| 10 | Air lifting 33 kv cable with GI pipe of suitable sizes and lentgh with clamps and N&B. |
| 11 | Drawing,Design,Documentation & taking approval from related all sections of Railway department including local railway body upto sections and all other miscllaneous expenses(including travelling,lodging & boarding etc. |
| 12 | Recovery of scrap cable from site and loading, unloading carriage to store including cutting/scrapping complete. |
| 13 | Bohli |
| 14 | Decentralised Items without GST |
| 15 | 11 kv line |
| 16 | dzkl vkeZ gksfYMax DySEi uV |
| 17 | ,Q0 czsfdV |
| 18 | LVs ywi balqysVj |
| 19 | MsUtj cksMZ DySEi lfgr |
| 20 | uV ,oa cksYV |
| 21 | ih0th0 DySEi |
| 22 | LVs DySEi |
| 23 | ^bZ&czSdsV^ |
| 24 | pSuy ,Q0 czsfdV |
| 25 | gksfYMax DySEi Vki pSuy gsrq |
| 26 | gksfYMax DySEi xkfMZax ,afxy gsrq |
| 27 | czsflax DySai |
| 28 | Dropper angle clamp |
| 29 | 11 kv line without GST |
| 30 | Shifting, Loading and carriage of Pole, accessories(centralised /decentralised items) from store to site. |
| 31 | Erection of poles with fitting of all acesories |
| 32 | Laying / spreading/stringing of 3 phases of ACSR cond. |
| 33 | concreting of poles |
| 34 | Cutting of tree branches |
| 35 | plinthing of pole |
| 36 | conreting of stay set |
| 37 | Gaurding work charge |
| 38 | earthing work with help of N&B including material |
| 39 | Extra work for welding of rusted poles with proper MS angle with material |
| 40 | Opening of Winding and rewinding after completion of work on Existing Pin insulator, F-bracket and safely keeping the conductor on Cross arm for re-sagging/re-tightening of exixting old loose/ broken conductor including all material and labour. |
| 41 | Opening of Winding and rewinding after completion of work from disc fitting of Existing section poles for the purpose of resagging and retightening of conductor including all material and labour. |
| 42 | Staightening of tilted pole by digging of pit at pole base and safely straightening of pole, refilling with concrete materials etc, including all material and labour. |
| 43 | Opening of old existing damaged X-arm,F-bracket ,its nut-bolt,Pin,etc. and re-installing of new X-arm ,Nut-bolt,Pin ,etc.complete work including All T&P and labour |
| 44 | Opening of old existing damaged Disc and disc fitting,its nut-bolt,,etc. and re-installing of new disc insulator,disc fitting ,Nut-bolt,,etc.complete work including All T&P and labour |
| 45 | Extra charge for carriage and Erection of PCC 11 Mtr pole including all other essential required manpower/ machinery/T&P to successfully complete the work. |
| 46 | Opening of consumer cables for erection of poles/laying of conductor and gaurding works complete and rejoining complete work for successsful completion of work. |
| 47 | Carriage of scrap conductor to store center Please Enable Macros to View BoQ information |