| 1 | Dismantling of Brick work I/C. stacking of dismantled materials as directedby engineer in charge within a distance of 60 meters.Metting hall Trace |
| 2 | Dismantling existing plasterI/c disposal of refuse as directed by Engineer in charge within a distance of 60.meters.Boundary Wall, Metting hall Trace,deduction,D1,W2, |
| 3 | M-150 first class B/W in 1:6 cement & C.sand in foundation |
| 4 | M-150 first class B/W in 1:6 cement & C.sand in super Stracture. Metting hall Trace |
| 5 | 12mm thick plaster in1:6 cement, &C.sand, Metting hall Trace |
| 6 | 6mm thick plaster in1:3 cement in Trace |
| 7 | Dismantaling cement concrete floors&roof |
| 8 | P/L. C.C.in 1:2:4 cement c.sand&stone aggregate etc.House of JayLalita |
| 9 | Two coat over primimng coat Painting With ready mixed, door, window, window, |
| 10 | Finishing walls with Acrylic Smooth interior paint of required shade Two Coat Office, deduction |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade Two Coat Office, deduction |
| 12 | Supply and Fixing of 6mm thick china white glaxed tiles in walls or dado laid with 1:3 cement and apporved coarse sand mortar finished with white cement jointed and polishing complete including supply of all materials, labours required for poper comletion of the work, Gate No. 2 toilet, Dedution for opening |
| 13 | S/f of WC European type |
| 14 | S/F washbasin 550×400mm |
| 15 | S/F of cp bib cock heavy Quality 15 mm dia |
| 16 | S/F of pilar cook |
| 17 | S/F of angle cock |
| 18 | S/F of plumbering work |
| 19 | S/F of electrification |
| 20 | S/F sintex water tank |
| 21 | S/F of window glass 3mm |
| 22 | S/F of Car Panter work |
| 23 | S/F of flush door |
| 24 | Repair/Serving of AC |
| 25 | S/F of Street Light with Complete Work Etc ENDURASUNDOWNSL90WLED757PASYBOTG |
| 26 | Repairing of ceiling light. 2x2 fit (hall+camp office) |
| 27 | Repairing of ceiling light. 4''x4'' (hall+camp office) |
| 28 | P/F of Perforated Ceiling tiles Complete work. |
| 29 | Office of Kary Adhikari |
| 30 | Repair of Summer sable |
| 31 | Removal of malba,building rubbish,as matarial transport to the dumping ground out of Z.P ….I/C loading,unloading complete Please Enable Macros to View BoQ information |