|
| 1 | Supply of Following Matarial as per relevent ISS | Supply of Following Matarial as per relevent ISS |
| 2 | Stone Pad | Stone Pad |
| 3 | AL LUG Long Barrel Off Size | AL LUG Long Barrel Off Size |
| 4 | Holding Clamp | Holding Clamp |
| 5 | M.s Top Channel 125x65x2240 mm | M.s Top Channel 125x65x2240 mm |
| 6 | MS Dropper Channel 100x50x2028 mm | MS Dropper Channel 100x50x2028 mm |
| 7 | Number Plate | Number Plate |
| 8 | MS Angle T/F base With Clamp and nut,bolt | MS Angle T/F base With Clamp and nut,bolt |
| 9 | Barbed Wire | Barbed Wire |
| 10 | Danger Board | Danger Board |
| 11 | Copper L Piece | Copper L Piece |
| 12 | Henley Type Tailless Unit Protection Cubicle Panel 500A, 650V | Henley Type Tailless Unit Protection Cubicle Panel 500A, 650V |
| 13 | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box |
| 14 | Insulated Weasel Conductor | Insulated Weasel Conductor |
| 15 | M/s Nut & Bolt | M/s Nut & Bolt |
| 16 | Suspension Clamp | Suspension Clamp |
| 17 | Dead End Clamp | Dead End Clamp |
| 18 | I Hook/J Hook | I Hook/J Hook |
| 19 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 20 | Pcc Pole 8.5 Mtr. Long | Pcc Pole 8.5 Mtr. Long |
| 21 | Pcc Pole 11 Mtr. Long | Pcc Pole 11 Mtr. Long |
| 22 | 11 KV Pin Insulator With Pin | 11 KV Pin Insulator With Pin |
| 23 | 11 KV Disc Insulator With Fitting | 11 KV Disc Insulator With Fitting |
| 24 | Fuse Set | Fuse Set |
| 25 | Earthing Complete | Earthing Complete |
| 26 | Stay set Complete | Stay set Complete |
| 27 | 25 KVA 11/0.4 KV T/F | 25 KVA 11/0.4 KV T/F |
| 28 | 250 KVA 11/0.4 KV T/F | 250 KVA 11/0.4 KV T/F |
| 29 | LT XLPE/PVC Cable 3.5x70 Sqmm | LT XLPE/PVC Cable 3.5x70 Sqmm |
| 30 | LT XLPE/PVC Cable 1x400 Sqmm | LT XLPE/PVC Cable 1x400 Sqmm |
| 31 | LT XLPE/PVC Cable 1x240 Sqmm | LT XLPE/PVC Cable 1x240 Sqmm |
| 32 | LT ABC Cable 3x120+1x95+1x16 sqmm | LT ABC Cable 3x120+1x95+1x16 sqmm |
| 33 | 11 KV TPMO with Polymer Insualator | 11 KV TPMO with Polymer Insualator |
| 34 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 35 | Pcc Pole 8.5 Mtr. Long | Pcc Pole 8.5 Mtr. Long |
| 36 | Pcc Pole 11 Mtr. Long | Pcc Pole 11 Mtr. Long |
| 37 | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work |
| 38 | Stone Pad | Stone Pad |
| 39 | AL LUG Long Barrel Off Size | AL LUG Long Barrel Off Size |
| 40 | Holding Clamp | Holding Clamp |
| 41 | M.s Top Channel 125x65x2240 mm | M.s Top Channel 125x65x2240 mm |
| 42 | MS Dropper Channel 100x50x2028 mm | MS Dropper Channel 100x50x2028 mm |
| 43 | Number Plate | Number Plate |
| 44 | MS Angle T/F base With Clamp and nut,bolt | MS Angle T/F base With Clamp and nut,bolt |
| 45 | Barbed Wire | Barbed Wire |
| 46 | Danger Board | Danger Board |
| 47 | Copper L Piece | Copper L Piece |
| 48 | Henley Type Tailless Unit Protection Cubicle Panel 500A, 650V | Henley Type Tailless Unit Protection Cubicle Panel 500A, 650V |
| 49 | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | LT Fuse Set Protection Unit for 25 KVA DT with SMC Box |
| 50 | M/s Nut & Bolt | M/s Nut & Bolt |
| 51 | 11 KV Pin Insulator With Pin | 11 KV Pin Insulator With Pin |
| 52 | 11 KV Disc Insulator With Fitting | 11 KV Disc Insulator With Fitting |
| 53 | Fuse Set | Fuse Set |
| 54 | 11 KV TPMO with Polymer Insualator | 11 KV TPMO with Polymer Insualator |
| 55 | Suspension Clamp | Suspension Clamp |
| 56 | Dead End Clamp | Dead End Clamp |
| 57 | I Hook/J Hook | I Hook/J Hook |
| 58 | Installation of 25 KVA 11/0.4 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. | Installation of 25 KVA 11/0.4 KV T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. |
| 59 | Installation of 250 KVA T/F on newly/Old constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work | Installation of 250 KVA T/F on newly/Old constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work |
| 60 | Safe Dismenteling of old and used following T/F from Double Pole with opening of all HT/LT Jumpers, all works which required for dismentling of T/F. | Safe Dismenteling of old and used following T/F from Double Pole with opening of all HT/LT Jumpers, all works which required for dismentling of T/F. |
| 61 | 10/16 KVA T/F | 10/16 KVA T/F |
| 62 | 100 KVA T/F | 100 KVA T/F |
| 63 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 64 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 65 | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor/GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor/GI in 11 KV/LT lines as per RESPO manual and as per direction of supervising engineer. |
| 66 | LT XLPE/PVC Cable 3.5x70 Sqmm | LT XLPE/PVC Cable 3.5x70 Sqmm |
| 67 | LT XLPE/PVC Cable 1x400 Sqmm | LT XLPE/PVC Cable 1x400 Sqmm |
| 68 | LT XLPE/PVC Cable 1x240 Sqmm | LT XLPE/PVC Cable 1x240 Sqmm |
| 69 | LT ABC Cable 3x120+1x95+1x16 sqmm | LT ABC Cable 3x120+1x95+1x16 sqmm |
| 70 | Insulated Weasel Conductor | Insulated Weasel Conductor |
| 71 | Construction of plinth of size 2x2x1.5 M above ground level one ft below the ground level of 9\\" After Exavation of 4 \\"earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9\\"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6\\"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. | Construction of plinth of size 2x2x1.5 M above ground level one ft below the ground level of 9\\" After Exavation of 4 \\"earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9\\"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6\\"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. |
| 72 | Pipe & Water Level earthing of 250 KVA medium Power Transformers | Pipe & Water Level earthing of 250 KVA medium Power Transformers |
| 73 | Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut | Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut |
| 74 | Back Cartage of Following Material and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work | Back Cartage of Following Material and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work |
| 75 | 10/16 KVA T/F | 10/16 KVA T/F |
| 76 | 100 KVA T/F | 100 KVA T/F |